SANITARY SEWER REHABILITATION – INFLOW AND INFILTRATON CORRECTION PROJECT

Location: Washington
Posted: Jun 16, 2026
Due: Jul 2, 2026
Agency: Oak Harbor city
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: ENG-22-09
Publication URL: To access bid details, please log in.
Bid Number: ENG-22-09
Bid Title: SANITARY SEWER REHABILITATION – INFLOW AND INFILTRATON CORRECTION PROJECT
Category: Invitation to Bid
Status: Open
Description:

CALL FOR BIDS

CITY OF OAK HARBOR

SANITARY SEWER REHABILITATION – INFLOW AND INFILTRATON CORRECTION PROJECT

City Contract Number eng-22-09

Sealed proposals will be received at the City of Oak Harbor cashiers window, 865 SE Barrington

Drive, Oak Harbor, Washington 98277-3280 up to but not later than 2:00 p.m. local time on Thursday, July 2 , 2026, for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the SANITARY SEWER REHABILITATION INFLOW AND INFILTRATON CORRECTION PROJECT.  At the time and date stated above, the proposals will be publicly opened and read aloud. Proposals are to be submitted only on the forms provided with the Specifications.

Contractors are invited to submit bids for the SANITARY SEWER REHABILITATION INFLOW AND INFILTRATON CORRECTION PROJECT in Oak Harbor, Washington. The work includes the installation of approximately 1,450 linear feet of 8-inch diameter gravity sewer via open cut to replace undersized 6-inch sewer, four (4) 48-inch sanitary manholes, approximately 9,200 linear feet of 8-inch diameter and 12-inch diameter CIPP sewer lining, approximately 30 CIPP lateral liners extending up to three (3) feet from the mainline sewer, and reinstatement of existing active sanitary sewer service laterals on the sewer segments repaired and replaced. This work also includes HMA trench repair, and general surface restoration. All work shall be in conformance with the Contract Plans, Contract Provisions, and the 2026 Standard Specifications for Road, Bridge and Municipal Construction.

The work shall be physically completed within 120 calendar days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the request for the Proposal, Plans, Specifications, and Contract for this project and any addenda issued thereto which are on file at the office of the City Clerk, City Hall, City of Oak Harbor, Washington. The engineer’s opinion of probable cost ranges from $2,300,000 to $2,400,000 .

This project is funded by a Federal EPA Grant and is subject to all requirements of Federal Acquisition Regulation (FAR) and recipients of EPA Grant awards, including but not limited to Davis-Bacon and Related Acts (DBRA) and Washington State prevailing wage determinations (Specification Sections 00830, 00840, 00850, and Appendix A), compliance with the Contract Work Hours and Safety Standards Act, compliance with and completion of the Byrd Anti- Lobbying Amendment Certification (BP-12), compliance with American Iron and Steel (AIS) (Appendix E) and Build America, Buy America (BABA) (Appendix D) domestic preference requirements, EPA Signage requirements (Section 00860), erosion and sediment control plan and

requirements, and adherence to all requirements within the Oak Harbor Inflow and Infiltration Corrections Project Monitoring Plan dated 6/1/2026 and the Inadvertent Discovery Protocol (Appendix B), which includes archaeological monitoring during active construction and reporting any inadvertent discoveries to EPA, the Washington Department of Archaeology and Historic Preservation, and identified Tribes. The Contractor must not be debarred or suspended or otherwise excluded from or ineligible for participation in Federal assistance programs.

Complete details of the plans, specifications and submittal requirements are available on-line at https://www.oakharbor.gov/Bids.aspx or obtained at the City of Oak Harbor Public Works Department, 1400 NE 16th Avenue, Oak Harbor, WA 98277-4605.

The Owner reserves the right to reject any or all bids, to waive irregularities or informalities in the bid or in the bidding, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursuant to the terms of the General Conditions. The Owner intends to award a contract to the lowest responsible and responsive bidder.

Each bid must be accompanied by a cashier's check, money order or surety bid bond in the amount of not less than five percent (5%) of the total bid, made payable to the City of Oak Harbor. A Performance Bond as well as a Labor and Material Payment Bond will be required with the Contract.

No bidder may withdraw its bid after the hour set for opening thereof or before award of contract, which normally occurs within 45 calendar days after bid opening.

The City of Oak Harbor reserves the right to postpone the award for a period of 60 calendar days after bid opening. Bid securities of the three lowest bidders will be held by the City of Oak Harbor until official award of the contract.

Bid Schedule: (dates and times subject to change)

Bid advertisement starts: June 3, 2026

Last day for questions: June 17, 2026 (by noon)

Last day for addenda to be issued: June 24, 2026

Bids due: July 2 , 2026 (by 2:00 pm PST)

Anticipated City Council Contract Approval: July 21, 2026

Anticipated Notice of Award: July 22, 2026

Contractors who download plans and specifications are advised to e-mail For security reasons, you must enable JavaScript to view this E-mail address. to be added to the plan holders list so they receive email notifications of any addenda that may be issued. It is the contractor’s responsibility to check for addenda that are published online with the City of Oak Harbor and acknowledge the addenda on the Bid Proposal.

Bids will be publicly opened and read aloud shortly after the Bids Due time and date published. Proposals are to be submitted only on the form provided with the Bid Documents.

All questions must be received in writing before the date posted above to be answered in a timely manner and posted on the City’s website. Questions and inquiries should be directed to the City of Oak Harbor; Andy Walsh, Project Manager For security reasons, you must enable JavaScript to view this E-mail address. , and Sandra Place, Central Services Manager, For security reasons, you must enable JavaScript to view this E-mail address. .

The City of Oak Harbor in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

______________________________________

(Signed) JULIE NESTER

City Clerk

Published:       Whidbey News-Times

Seattle Daily Journal of Commerce

Washington State Office of Minority & Women’s Business Enterprises

Builders Exchange of Washington

City of Oak Harbor Webpage

Publication Date/Time:
6/3/2026 12:00 AM
Publication Information:
Whidbey News-Times Seattle Daily Journal of Commerce Washington State Office of Minority & Women’s B
Closing Date/Time:
7/2/2026 2:00 PM
Related Documents:
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Solicitation Close Date: 07/23/26 Title: SVC- Old Main Sewer Replacement Ref #:2026-11G (1-1...) ...

State Government of Washington

Bid Due: 7/23/2026

...Solicitation Close Date: 07/30/26 Title: EDC-Sewer and Storm Line Replacement Ref #:2026-166G (1-1...) ...

State Government of Washington

Bid Due: 7/30/2026

...Description: Combined Sewer Peak Flow Reduction Plan Opening Date/Time: June 22, 2026 : ...

City of Olympia

Bid Due: 7/20/2026

...Project: BID -EDC-Sewer and Storm Line Replacement Ref. #: 2026-166 G (1-1) Type: ...

State Government of Washington

Bid Due: 7/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.