| Location: | New Mexico |
|---|---|
| Posted: | Mar 9, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 127EAX26Q0014 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger
District. Base items include drain dip construction, road widening, curve widening, road obliteration, new construction, rip rap placement, road reconditioning, and culvert installation. Drain dip construction will involve excavation and compaction of approximately 180 cubic yards of native material. Road widening will involve approximately 1390 cubic yards of excavation and compaction and will result in total road widths of twelve (12) feet. New construction will involve 0.6 miles of clearing and grubbing and approximately 600 cubic yards of excavation and compaction. Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Lastly, culvert installation will involve the placement of a 57” x 38” arched corrugated metal pipe thirty (30) feet in length on top of approximately 30 cubic feet of uncompacted bedding material.
| Mar 12, 2026 | [Combined Synopsis/Solicitation (Updated)] Rock Creek Road Maintenance |

With GovernmentContracts, you can: