| Project Title: | Boothbay-Boothbay Harbor Elementary - Middle School Commissioning Services |
| Project Location: | Boothbay Harbor |
| Project Information / Exhibits: | RFP Document |
| Document Number: | N/A |
| Q & A Summary and Amendment: | |
| Bid Opening Location: |
Dirigo Architectural Engineering
Attn: Zachary Quinn 175 Innovation Way Scarborough, ME |
| Due Date / Time: | 2026/11/16 5:00pm |
Request for Commissioning Services Proposal
Boothbay-Boothbay Harbor: Elementary-Middle School
236 Townsend Ave,
Boothbay Harbor, Maine, 04538
Issuance Date: October 16, 2026
Closing Date: November 16, 2026
General Information
Dirigo A/E, on behalf of AOS 98 (Owner) requests written proposals to secure lighting controls
and HVAC systems commissioning agent (CxA) services for the classroom and administration
office addition and school renovation project in Boothbay Harbor, Maine. Dirigo A/E is
serving as the Owner's Representative for this project.
The Owner is committed to commissioning this facility to systematically optimize the building and
ancillary systems so that they operate efficiently and effectively in accordance with the Owners
Project Requirements, and that the facility staff has adequate system documentation, and training. It
is the intent of the Owner to ensure that the fundamental systems are calibrated and operating as
required to deliver functional and efficient performance.
The project is a 98,052 gross sqft., 2 story school building. The facility is comprised of 3 wings
(Attachement A), existing building and proposed admin office addition, existing building classroom
wing and proposed classroom wing addition. The project is being put out for bid at the end of 2026,
and was designed by Lavallee Brensinger of Portland, Maine. The electrical/mechanical/HVAC
design is by RFS Engineering of Portland, Maine. The project schedule (Attachment B) is currently
anticipated to begin construction in April of 2027, with expected substantial completion in
September 2029. Commissioning specifications are expected to start immediately upon Agent
selection in order to aid in the bidding phase of the project.
Access to the following information will be made available to the proposers:
1. 50% Construction documents and specifications
2. Access to the site can be made if needed prior to submitting the proposal by contacting:
Zachary Quinn
Dirigo Architectural Engineering
zquinn@dirigoae.com
Request for Commissioning Services Proposal Page 1 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
CxA Scope of Work
The CxA will plan, manage, perform and report on the commissioning activities, utilizing the
reporting formats and standardized forms provided by the CxA whenever required. The CxA will
submit deliverable report to David Benner (Facilities Manager at AOS 98) and Tom Perkins (Dirigo's
Owner's Representative) according to a project schedule set by CxA and agreed upon by Owner. It is
extremely important that all commissioning tasks be conducted in a transparent manner and involve
the Facilities Director and operations staff to the greatest degree possible. The commissioning
authority will be hired by and report directly to the Owner.
The systems to be commissioned but not limited to:
1. Cooling systems
2. Heating systems
3. Air handling systems
4. Ductless split systems
5. Dehumidifiers
6. HVAC controls systems / Building automation
7. VAV boxes
8. Terminal Units
9. Kitchen Hood
10. Lighting controls / Building automation
Commissioning is required as one quality measure of the construction of this building in order to
ensure that the final building meets the original intent of the owner's design. The proposer is free to
suggest changes and improvements to this process. Following is a summary of the commissioning
process and scope of work the owner requests for this project.
Commissioning Process During the Construction Phase
The commissioning process activities accomplished by the commissioning authority during the
construction phase include:
1. Coordinate and direct commissioning activities in a logical, sequential and efficient manner
using consistent protocols, clear and regular communications and consultations with all
necessary parties, frequently updated timelines, schedules, and technical expertise.
2. Perform site visits, as necessary, to observe component and system installations. Accomplish
a statistical review of construction focusing on the owner's design intent and the quality
process. Attend selected planning and job-site meetings to obtain information on
construction progress. Review construction-meeting minutes for revisions/substitutions
relating to the owner's design intent. Assist in resolving any discrepancies.
3. With necessary assistance and review from the installing contractors, develop and write
Request for Commissioning Services Proposal Page 2 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
construction checklists. Submit to Construction Manager and owner for approval.
4. Organize and conduct periodic commissioning team meetings necessary to plan, develop the
scope, coordinate, schedule activities and resolve problems.
5. Review submittals and comment as necessary for conflicts with Project Requirements.
6. Work with contractors in completing construction checklists and tracking of checklist
completion.
7. Statistically sample completion of construction checklists on a periodic basis to verify that
contractor's quality process is achieving the owner's project requirements.
8. Before startup, gather and review the current control sequences and interlocks and work
with contractors and design engineers until sufficient clarity has been obtained, in writing, to
be able to write detailed testing procedures.
9. Approve systems startup by reviewing start-up reports and by selected site observation.
10. With necessary assistance and review from installing contractors, write the test procedures.
Submit to Owner and Owner's Representative for review and approval.
11. Assist Construction Manager in direction of the subcontractor to execute the tests.
12. Oversee sufficient functional testing of the control system and approve it to be used for
TAB, before TAB is executed.
13. Oversee the TAB procedure, performed by a Balancing Technician, to the extent deemed
necessary to insure that the design intent is met.
14. Coordinate witness and recommend approval of test procedure performed by installing
contractors. Coordinate retesting as necessary until satisfactory performance is achieved.
15. Analyze operation of the temperature controls systems to verify performance.
16. Witness and approve manual functional performance tests performed by installing
contractors. Coordinate retesting as necessary until satisfactory performance is achieved.
17. Recommend approval of air and water systems balancing through statistical sampling of the
report and separate field verification.
18. Maintain a master issues log and a separate testing record. Provide to the Construction
Manager and owner with written progress reports and test results with recommended
actions.
19. Document the correction and retesting of non-compliance items by the contractor.
20. Reviews the systems manual for achieving the owner's project requirements.
21. Review, recommend pre-approval, and verify the training provided by the contractors.
Request for Commissioning Services Proposal Page 3 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
Commissioning Process During the Occupancy and Operations Phase
The commissioning process activities accomplished by the commissioning authority during the
occupancy and operations phase include:
1. Schedule and verify deferred and seasonal testing by the contractor.
2. Verify continuing training.
3. Schedule, organize, and attend a lessons-learned workshop. The workshop is facilitated by an
independent member of the Commissioning Authority or the Owner.
4. Complete the final Commissioning Process Report.
5. Assist in the development of a preventative maintenance plan, a detailed operating plan or
an energy and resource management plan.
6. Return to the site 10 months into the 12-month warranty period. Review with facility staff
the current building operation and the condition of outstanding issues related to the original
and seasonal commissioning. Also interview facility staff and identify problems or concerns
they have with operating the building as originally intended. Make suggestions for
improvements and for recording these changes in the O&M manuals. Identify areas that may
come under warranty or under the original construction contract. Assist facility staff in
developing reports and documents and requests for services to remedy outstanding
problems.
Commissioning Authority Responsibilities
In addition to duties described above, the commissioning authority (CxA) will have the following
responsibilities and authority:
1. Issue deficiency notices and verify that they have been corrected. An Issues Log will be
maintained and reviewed at the commissioning meetings. Deficiencies that are not corrected
in a timely manner will be reported to the owner.
The commissioning authority (CxA) is not required to:
1. Establish design concept, design criteria, compliance with codes, design or general
construction scheduling, cost estimating, or construction management. The CxA may assist
with problem-solving or resolving non-conformance or deficiencies, but ultimately that
responsibility resides with the general contractor and the design team. The CxA will report
to the owner any deficiencies or discrepancies.
2. Issue change orders; they do review change orders for compliance with the construction
documents. Non-compliances will be reported to the owner.
Request for Commissioning Services Proposal Page 4 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
Desired Qualifications
It is the Owner's desire for the person(s) designated as the site commissioning authority (CxA) to
satisfy as many of the following requirements as possible:
Acted as the principal commissioning authority for at least three projects of comparable size,
type and scope.
Extensive experience in the operation and troubleshooting of HVAC systems and energy
management control systems.
Extensive field experience. A minimum of five (5) full years in this type of work is required.
Knowledgeable in building operation and maintenance and O&M training.
Knowledgeable in national building & fire codes as well as water-based fire extinguishing
systems, detection systems and alarms systems.
Knowledgeable in test and balance of both air and water systems.
Experienced in energy-efficient equipment design and control strategy optimization.
Demonstrated experience with total building commissioning approach including building
envelope, data and communication systems and other specialty systems.
Direct experience in monitoring and analyzing system operation using energy management
control system trending and stand-alone data logging equipment.
Excellent verbal and writing communication skills. Highly organized and able to work with
both management and trade contractors.
Experienced in writing commissioning specifications.
A bachelor's degree in mechanical or electrical engineering is strongly preferred, and P.E.
license is desired. However, other technical training, past commissioning, and field
experience will be considered as a substitute.
Membership and certification as a Certified Commissioning Professional with the Building
Commissioning Association is desired but not required.
The required expertise for this project will be based on the skill and experience set of the full team
making the proposal. A member of the prime firm will be the designated commissioning authority
who is the member of the team that will coordinate the commissioning activities from the technical
perspective. This party may not necessarily be the team's overall project or contract manager. The
commissioning authority must have significant in-building commissioning experience, including
technical and management expertise on projects of similar scope. If the commissioning authority or
prime firm does not have sufficient skills to commission a specific system, the prime firm shall
subcontract with a qualified party to do so. Subcontractor qualifications shall be included and clearly
designated in response to this scope of work.
Request for Commissioning Services Proposal Page 5 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
Terms and Conditions
1. This RFP does not commit the Owner to award a contract, issue a purchase order, or to pay
any costs incurred in the preparation of a qualification in response to the RFP.
2. The qualification will become part of the Owner's official files without any obligation on the
Owner's part. All responses will be held strictly confidential and shall not be released to the
public without written authorization from the bidder.
3. Proposer(s) shall not offer any gratuities, favors, or anything of monetary value to any
officer, agent, contractor or employee of AOS 98 or Dirigo for the purpose of influencing
consideration of a qualification.
4. Proposer(s) shall not collude in any manner, or engage in any practices, with any other
Proposer(s) that may restrict or eliminate competition or otherwise restrain trade. This is not
intended to preclude subcontracts and joint ventures for the purpose of: a) responding to
this RFP, or b) establishing a project team with the required experience and/or capability to
provide the goods or services specified herein.
5. Proposer(s), their authorized representatives, and their agents are responsible for obtaining,
and will be deemed to have, full knowledge of the conditions, requirements, and
specifications of this RFP.
6. The proposer must promptly report to the Owner and Owner's Representative of any
conditions, transactions, situation, or circumstances that would impede, impair or delay
the submission of the qualification, or the proper and timely performance of the work.
7. The Owner reserves the right to cancel this RFP or to reject any or all qualifications
received prior to contract award.
8. The Owner reserves the right to request clarification of any qualification after all
qualifications have been received. The request can be in the form of oral presentation or
personal meetings.
9. The Owner reserves the right to open qualifications privately or unannounced and to reject
any and all submittals and waive irregularities and informalities in any qualifications
that are submitted and to be the sole and final judge of all qualifications.
10. The Owner reserves the right to discontinue its evaluation of submittals from any
respondents who submit false, misleading or incorrect information.
Request for Commissioning Services Proposal Page 6 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
Proposal
Proposals need not be voluminous, but shall provide sufficient information to allow the owner to
evaluate the consultant's approach, experience, staff and availability.
The proposer shall:
1. Limit their proposal to 20 single-sided pages, including graphics. A letter of introduction,
section dividers, detailed resumes and the sample work products are not included in this
limit.
2. Have the proposal signed by an officer of the proposing firm with the authority to commit
the firm.
3. Fill out the attached Commissioning Firm Experience form and the Commissioning Task
Listing form (Exhibits 1 and 2) for each firm on the team. List no more than four projects
in Exhibit 2.
4. List the individual(s) who will serve as the lead CxA for the design phase and for the
construction phase of the contract.
5. Provide resumes for key staff and subconsultants. The resumes shall include specific
information about expertise in commissioning tasks, (e.g. design reviews, specification
writing, commissioning management, troubleshooting, test writing, test execution, energy
management, sustainable design, etc.).
6. Briefly describe "relevant" experience (project phasing, life cycle costing, testing, adjusting
and balancing, building simulation, IAQ, campus projects, etc.) of the proposer's team in the
following areas. List involvement of key team members.
a) projects similar to this one
b) O&M experience
c) energy-efficient equipment design and control strategy optimization
d) project and construction management
e) system design (specify)
f) troubleshooting
7. Describe your proposed approach to managing the project expertly and efficiently, including
distribution of tasks, travel, and duration of which staff will be on site during what periods
of time, etc. Describe how you intend to determine the appropriate level of commissioning
effort for the various systems and equipment.
888... As an attachment, provide the following work products that members of the proposer's
team developed. List the team member who actually wrote the document and the projects on
which they were used. Work from the designated CxA is preferred.
a) Commissioning plan that was executed (the process part of the plan)
b) An actual functional test procedure form that was executed
Request for Commissioning Services Proposal Page 7 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
9. Provide a statement of proposer's liability insurance coverage (type, and dollar amount of
coverage). Proof of this insurance will be required prior to the award of this contract to the
winning proposal.
10. Provide a fixed, lump sum total cost to accomplish the work for the following phases:
Construction and Occupancy and Operations. All task amounts include associated meetings,
progress reports and direct costs (travel, mileage, per diem, communications, etc.). Use the
budget table shown in Exhibit 3 (or a suitable equivalent) to provide a cost breakdown. Also
provide an hourly rate for each team member for work that may exceed the scope. For each
phase, provide the percentage level of effort for each primary team member.
11. For planning purposes, the proposer must also provide a cost "estimate" range for the
construction and warranty phase tasks using the form below. Also provide an hourly rate for
each team member for work that may exceed the scope. For each phase, provide the
percentage level of effort for each primary team member.
12. Use the budget table shown in Exhibit 3 (or a suitable equivalent) to provide a cost
breakdown.
The respondent must submit:
1 electronic copy, signed by authorized person with proposing firm
Proposals must be submitted to arrive no later than close of business, 5:00 p.m. EST, on
November 16th, 2026 to the attention of Zachary Quinn at the following email addresses:
zquinn@dirigoae.com
Original to be delivered to if desired:
Dirigo Architectural Engineering
Attn: Zachary Quinn
175 Innovation Way
Scarborough, Maine 04074
Request for Commissioning Services Proposal Page 8 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
Selection Process
Owner's staff shall review all proposals and select and rank the three (3) most qualified consultants.
The selection and ranking shall be based on the following criteria (not necessarily listed in order of
importance):
Past experience in performing similar projects 25 points
Expertise of the team in performing the services required by the project 25 points
Management approach 25 points
Proposed Fee 25 points
The owner will negotiate/interview with the highest ranked consultant on the tasks, staffing,
schedule, and fee proposal. Negotiations may be formally terminated if they fail to result in a
contract within a reasonable time period. Negotiations will then ensue with the second ranked
consultant, and if necessary, the third ranked consultant.
Request for Commissioning Services Proposal Page 9 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School
Exhibit 1: Commissioning Firm Experience
Please Complete A Separate Form For Each Firm On The Team
Company Name Contact Person Title
Address City State Zip/Postal Code
Telephone Fax E-Mail
Description of Business
Commissioning Activities
Percentage of overall business devoted to commissioning services %
How long has the firm offered commissioning services years
Average number of commissioning projects performed each year: projects
Number of registered engineers on staff who have directed commissioning projects:
Request for Commissioning Services Proposal Page 10 of 17
Boothbay-Boothbay Harbor: Elementary-Middle School

With GovernmentContracts, you can:
The City of Saco seeks proposals from qualified engineering consulting and urban design
Saco city
Bid Due: 12/02/2026