| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 19, 2026 |
| Due: | Nov 13, 2026 |
| Agency: | Carlisle borough |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Description | Opening Date/Time | Closing Date/Time |
|
RFP: Safe Streets and Roads For All Comprehensive Safety Action Plan |
October 16, 2026 : |
November 13, 2026 4:30 PM |
REQUEST FOR PROPOSALS
BOROUGH OF CARLISLE
SAFE STREET AND ROADS FOR ALL
(SS4A)
COMPREHENSIVE SAFETY ACTION PLAN
Issue Date: Friday, October 16, 2026
Response Deadline: Friday, November 13, 2026, 4:30 EST
1. Introduction
The Borough of Carlisle is soliciting proposals from interested and qualified planning and
consulting engineering firms to produce a Safe Street and Roads for All (SS4A)
Comprehensive Safety Action Plan related to traffic and mobility as described in this
Request for Proposals ("RFP"). The Borough received an SS4A Grant to procure this
Comprehensive Safety Action Plan.
This RFP is competitive based on respondent qualifications, service capabilities, and other
factors to select a Consultant that best meets the needs of the Borough. This RFP contains
the instructions governing the proposals to be submitted, the materials to be included
therein, and the requirements that must be met to be eligible for consideration. See the
Timeline for Selection Process below in Section 7.
2. Background
The Borough of Carlisle seeks to develop a single, Comprehensive Safety Action Plan
for an efficient and safe mobility network within the Borough to achieve its mission of
improving safe connectivity throughout the downtown, schools throughout the district, as
well as parks, trails, and other key locations.
The Borough of Carlisle was awarded a Safe Streets for All (SS4A) grant by the US
Department of Transportation to develop a Comprehensive Safety Action Plan. The
Comprehensive Safety Action Plan will incorporate the US Department of
Transportation's Safe System Approach and other recommended strategies included in
the Safe Streets and Roads for All programs further outlined below.
The Borough serves a population of approximately 23,800 (2025), with a median
household income of $59,742.
Carlisle, founded in 1751, is the county seat of Cumberland County and serves as an
important transportation hub. It is located southwest of the intersection of Interstate 76
(Pennsylvania Turnpike) and Interstate 81. Carlisle is roughly 20 miles west-southwest
of Harrisburg, the state capital.
Within easy walking distance of downtown Carlisle, a nurturing town/gown relationship
has formed with Dickinson College, Penn State's Dickinson School of Law and the U.S.
Army War College known throughout the United States and abroad. The Borough has
18 public parks and values active transportation activities with an extensive sidewalk
network, bike routes, and bike trails connecting throughout the Borough. There are 8
PennDOT roads in the Borough including US 11 which serves as an emergency route
when I-81 is closed.
The general purpose of the grant award and this project is to improve roadway safety
by significantly reducing or eliminating roadway fatalities and serious injuries through
safety action plan development. The project will be focused on all users, including
pedestrians, bicyclists, public transportation users, motorists, personal conveyance and
micro-mobility users, and commercial vehicle operators. The plan will prioritize the Safe
System Approach, particularly emphasizing Safe Roads and Safe Speeds to enhance
safety and foster an inclusive environment for all residents.
The Comprehensive Safety Action Plan must identify the community's most significant
roadway safety concerns and then diagnose and prioritize implementation projects and
strategies to address these concerns. The Plan must be developed in conformance with
the U.S. Department of Transportation's Safe Streets and Roads for All Self-Certification
Eligibility Worksheet (EXHIBIT B).
3. Scope of Work
The scope of services is presented below and corresponds with the Action Plan
Components outlined by the US Department of Transportation's Safe Streets for All
grant program. The proposal cost estimate should address all Action Plan Components.
Required Action Plan Components
Consultants will create and deliver a Comprehensive Safety Action Plan in compliance
with SS4A standards. Consultants must adhere to all guidelines for Action Plans
outlined in Safe Streets and Roads for All Action Plan Components (EXHIBIT C). The
Consultant will ensure that each of the following requirements are met, and
components are included in the Action Plan:
a. Leadership Commitment and Goal Setting: The Comprehensive Safety
Action Plan will include the previously adopted Resolution 08-10-2023-02.
This Resolution outlines a goal of zero roadway fatalities and serious
injuries by the year 2033.
b. Planning Structure: The Consultant for the SS4A Action Plan will facilitate
development of, and work in close cooperation with, the SS4A Steering
Committee, a group of involved stakeholders. Consultants will establish
regular communication with the Steering Committee and facilitate group
meetings.
Drafts of all deliverables will be provided to the Steering Committee with
sufficient time for review. Formal deliverables (drafts or final products)
should be provided to the steering committee at least one week before
any meeting for review of the documents. These review times should be
built into the project schedule proposed by the Consultants.
c. Safety Analysis: The Consultant will produce an analysis of existing
conditions and historical trends that provides a baseline level of crashes
involving fatalities and serious injuries within the boundaries of the
Borough of Carlisle. In addition, data pertaining to property-damage-only
crashes, near-misses, and other relevant data collected from community
input should also be included in the analysis. The plan will include an
analysis of locations where there are crashes and the severity of the
crashes, as well as contributing factors and crash types by relevant road
users including the following:
Vehicle Crashes: Contributing factors for the 10 highest vehicular crash
locations.
Bicycle Crashes: Contributing factors for the 10 highest crash
locations which involve cyclists.
Pedestrian Crashes: Contributing factors for the 10 highest
crash locations involving pedestrians.
Other Crashes: Contributing factors for the 5 highest crash
locations involving alternate travel modes not included above,
such as micro-mobility, public transportation, and commercial
operators.
Systemic and specific safety needs are to be analyzed (e.g., high-risk road
features, specific safety needs of relevant road users, public health
approaches, analysis of the built environment, demographic and structural
issues, etc.). To the extent practical, the analysis should include all
roadways within the jurisdiction without regard for ownership.
Based on the analysis performed, a geospatial identification of higher-risk
locations is to be developed (a High-Injury Network).
Note for proposal: Consultants should describe their approach to data
collection and analysis of existing conditions in the study area in order to
develop a High-Injury Network. The Director of SCEP and any other
invited Borough representatives including the police should be included in
the analysis process and know how to maintain and update this data after
the performance period. The Borough of Carlisle will own the rights to the
data collected during this study, will have full access to the data, and the
right to share the data.
d. Engagement and Collaboration: The development of the Comprehensive
Safety Action Plan requires robust engagement with the public and relevant
stakeholders, including the private sector and community groups, that allows
for both community representation and feedback. Information received from
engagement and collaboration is to be analyzed and incorporated into the
Action Plan. Plans and processes are coordinated and aligned with other
governmental plans and planning processes to the extent practical.
* Note for proposal: Consultants will create an engagement strategy
for both public and key stakeholder outreach. The engagement
strategy should include the overall outreach and engagement
framework, approach, process and schedule, strategies, and
format. It should also include a list of materials and/or media to be
developed to implement that framework, including notices and
announcements, public meeting agendas, publicity materials,
presentations, display boards, project website, etc. Various
engagement strategies should be considered to gather the
information necessary to prepare a final deliverable that responds
to stakeholder interests and concerns. The engagement strategy
will require consultation with staff and leadership from the Borough
of Carlisle, but for the purposes of the initial proposal an outline of
the engagement approach should be included.
e. Policy and Process Changes: The plan will include an assessment of
current policies, plans, guidelines, and/or standards (e.g., manuals) to identify
opportunities to improve how processes prioritize transportation safety.
The Action Plan will discuss implementation through the adoption of revised or
new policies, guidelines, and/or standards, as appropriate.
The Safe Streets for All Steering Committee will develop a list of plans,
policies and standards to be included in the review.
f. Strategy and Project Selections: The plan will include the identification of a
comprehensive set of projects and strategies, shaped by data, the best
available evidence, and noteworthy practices, as well as stakeholder input
that will address the safety problems described in the Action Plan. These
strategies and countermeasures focus on a Safe System Approach and
effective interventions and consider multidisciplinary activities. To the extent
practical, data limitations are identified and mitigated.
Once identified, the list of projects and strategies is prioritized in a list that
provides time ranges for when the strategies and countermeasures will be
deployed (e.g., short-, mid-, and long-term timeframes). The list should
include specific projects and strategies or descriptions of programs of
projects and strategies and explain the prioritization criteria used. The list
should contain infrastructure, behavioral, and/or operational safety
interventions.
* Note for proposal: Strategies and projects will cover physical
improvements and implementation recommendations for the
highest crash prone locations in the High Injury Network.
Short term goals which can be completed using municipal
resources (1-2 years) will be identified, in addition to mid-term
(3-5 years) and long-term goals (6-9 years) for which the.
Projects that involve physical improvements must adhere to
standards acceptable to the Pennsylvania Department of
Transportation and should be informed by the Complete
Streets policies created as a part of this study.
Strategies and projects should include more than what can be
implemented on roads owned by the Borough of Carlisle; the
Consultant should also provide strategies that the Borough can
implement within its corporate limits to reduce serious injuries
and fatalities on roads owned and maintained by the state and
other jurisdictions bordering the area of study. In addition,
strategies for cross- jurisdictional collaboration should be
included.
Consultants should describe their experience with the Safe
Systems approach, Vision Zero, Complete Streets, Public
Rights-of-Way Accessibility Guidelines (PROWAG), and other
road safety practices as a part of the Resumes provided in
Section 5 of the submission package.
g. Progress and Transparency The plan will include methodology to
measure progress over time after an Action Plan is developed or
updated, including outcome data. The plan must include steps to ensure
ongoing transparency is established with residents and other relevant
stakeholders. At a minimum the plan must include annual public and
accessible reporting on progress toward reducing roadway fatalities and
serious injuries and public posting of the Action Plan online. The "period
of performance" will be from when contract work begins until the contract
ends. We anticipate that the project will start in January 2027 and end in
December 2027.
* Note for Proposal: Consultants will develop the method for measuring and
advertising progress with Borough staff and local leaders. The Consultant will
be responsible for data reporting during the performance period. Consultants
are not responsible for advertising the data to the public or updating the data
after the performance period is complete.
4. Deliverables
The final work product shall be a Comprehensive Safety Action Plan that includes the
following in accordance with the required components (EXHIBIT C) of a Safe Streets for
All Action Plan as stipulated by the US Department of Transportation:
a. Deliverable #1: Technical Memo #1: Safety Analysis
i. Analysis of existing conditions and historical trends to provide a
baseline level of crashes involving fatalities and serious injuries
ii. Analysis of the location where there are crashes, the severity, as well as
contributing factors and crash types
iii. Analysis of systemic and specific safety needs, as needed (e.g., high-risk
road features or specific safety needs of relevant road users)
iv. High Injury Network Map
b. Deliverable #2: Technical Memo #2: Assessment of Current Policies, Plans,
Standards and Processes
i. An assessment of current policies, plans, guidelines, and/or
standards to identify opportunities to improve how processes
prioritize safety.
ii. Discussion of implementation through the adoption of revised or
new policies, guidelines, and/or standards.
c. Deliverable #3: Technical Memo #3: Comprehensive List of Strategies and
Projects to Improve Safety Technical Memo
i. List of strategies and projects for policy and process changes,
physical improvements, and implementation recommendations
covering the High Injury Network.
ii. Prioritization of projects based on feedback from the Steering Committee,
Borough Administration, and public feedback.
d. Deliverable #4: Final Deliverable: Comprehensive Safety Action Plan
5. Project Management
The Consultant will be responsible for coordinating regular project meetings with the
Borough, including producing all meeting requests, materials, documentation, etc.
The project milestone schedule provided in the proposal must be updated as needed
during the life of the project.
The Consultant Project Manager and select staff (max. 4 Consultant project team members
total) will meet with the Director of Sustainable Community & Economic Planning ("SCEP")
and any other invited Borough officials and PennDOT staff each month to provide progress
updates. It is expected there will be a total of 4 steering committee meetings to be held in
place of a Progress meeting. These meetings will be conducted via Video Conference Call
for efficiency and are assumed to take 1 hr. or less. It is expected that meeting
documentation (Meeting Takeaways) will be provided in the form of key decisions and action
items (no formal/extensive meeting minutes) for efficiency.
Project deliverables will be provided to the Director of SCEP electronically.
It is expected that there will be 1 public meeting to be held during the regularly scheduled
Council Workshop meetings. The meeting will be to share the findings of the first 3
Deliverables/Tech Memos.
Thus, there will be 13 meetings in total (8 Progress, 4 Steering Committee, and 1 Public) in
the 12 month period.
The Borough of Carlisle will be responsible for grant management and project oversight,
including programmatic and financial reporting. The Consultant will provide the Borough with
clear, accurate, and timely reports and financial statements to facilitate all grant reporting
requirements.
| Activity | Date |
|---|---|
| RFP Distribution | October 16, 2026 |
| Deadline to submit written questions via email | October 30, 2026 |
| Response to questions | November 6, 2026 |
| Qualifications Package Due | November 16, 2026, 4:30pm EST |
| Consultant Selection by Borough Council | December 10, 2026 |
| Notice of Intent to Award | December 14, 2026 |
6. Federal Requirements
Because the Comprehensive Safety Action Plan is funded through the Safe Streets for
All grant program, the project will be administered in adherence to requirements of the
Uniform Administrative Requirements, Cost Principles and Audit Requirements for
Federal Awards (2 CFR 200). The selected Consultant will comply with all applicable
terms and conditions of the Federal Highway Administration and all applicable state and
federal regulations. This includes regulations and policies related to nondiscrimination,
equal employment opportunity, lobbying, as well as any agreements between the
Borough of Carlisle and the Federal Highway Administration. See US DOT Terms and
Conditions in EXHIBIT D as amended from time to time and as not further amended by
a court of competent jurisdiction.
7. General Information and Instructions
a. RFP Process.
Timeline for Selection Process
Activity Date
RFP Distribution October 16, 2026
Deadline to submit written questions via email October 30, 2026
Response to questions November 6, 2026
Qualifications Package Due November 16, 2026, 4:30pm EST
Consultant Selection by Borough Council December 10, 2026
Notice of Intent to Award December 14, 2026
Proposals received after the Qualifications Package Due date identified above
will not be accepted. No hardcopy proposal packages will be accepted.
Proposals must be sent electronically via email to Jared Woolston, Director of
SCEP at jwoolston@carlislepa.org.
Contact with any Borough representatives, including, but not limited to,
members of Borough Council, other than Jared Woolston, via email only, is
strictly prohibited and could result in the automatic rejection of the proposal
package. The Borough reserves the right to reject any or all proposal packages,
and/or waive technical defects or other provisions, if, in its judgment, it is in the
best interest of the Borough. The Borough reserves the right to negotiate
specific details and modifications and to waive any requirement herein with the
proposal packages submitted prior to entering into a contract.
Questions: Any questions concerning the scope of this project or request for
additional information should be directed to Jared Woolston at
jwoolston@carlislepa.org in accordance with the Timeline above. No interpretation
| Selection Criteria | Max. Length | Eval. Weight |
|---|---|---|
| 1. Understanding: Address potential issues and respective solutions for the desired tasks and outcomes outlined in this document with the requested Scope of Services, including proposed analysis tools and techniques and partner and public engagement strategies. (Note: Other related Project Experience will be presented in the Resumes, this section is for identification of Comprehensive Safety Action Plan development potential issues and solutions only.) | 1 p. | 30% |
| 2. Staffing: Provide Organization Chart. Include statement on capacity/availability of staff to complete the work. | 1 p. | 15% |
| 3. Work Plan: Provide a proposed streamlined approach for each of the 5 Deliverables plus the Engagement/Collaboration program (Steering Committee and Public Meetings) through text, charts, and/or tables. Identify tasks not performed by the Consultant that must be performed by Borough staff. | 1 p. | 25% |
| 4. Milestone Schedule: Provide a table or graphic that shows how the Work Plan, including meetings, milestones, deliverables, and review time periods, that shall be accomplished within 12 months. | 1 p. | 10% |
| 5. Resumes (Similar Experience): Include Max. 4 resumes (Project Manager and 3 Others) highlighting their direct involvement with other SS4A Comprehensive Safety Action Plans and relevant | 2 p. ea. | 20% |
shall be binding unless given in a separate formal letter from the Borough of
Carlisle.
b. Submission Requirements.
i. Selection of Vendor: The Borough of Carlisle reserves the right to reject all
responses to the RFP in whole or part for any reason. A selection committee
identified by the Borough will evaluate the responses to this RFP following the
"Best Value" process where evaluations will be made based upon the selection
criteria evaluation weights listed below and then ranked from highest to lowest
scores. After the ranking is established, the cost estimates will be reviewed, and
the successful applicant will be determined based upon the highest ranked
proposal with an acceptable price. The selection committee shall evaluate each
response to the RFP based upon the following:
Selection Criteria Max. Eval.
Length Weight
1. Understanding: Address potential issues and 1 p. 30%
respective solutions for the desired tasks and outcomes
outlined in this document with the requested Scope of
Services, including proposed analysis tools and
techniques and partner and public engagement
strategies. (Note: Other related Project Experience will
be presented in the Resumes, this section is for
identification of Comprehensive Safety Action Plan
development potential issues and solutions only.)
2. Staffing: Provide Organization Chart. Include 1 p. 15%
statement on capacity/availability of staff to complete
the work.
3. Work Plan: Provide a proposed streamlined approach 1 p. 25%
for each of the 5 Deliverables plus the
Engagement/Collaboration program (Steering
Committee and Public Meetings) through text, charts,
and/or tables. Identify tasks not performed by the
Consultant that must be performed by Borough staff.
4. Milestone Schedule: Provide a table or graphic that 1 p. 10%
shows how the Work Plan, including meetings,
milestones, deliverables, and review time periods, that
shall be accomplished within 12 months.
5. Resumes (Similar Experience): Include Max. 4 2 p. ea. 20%
resumes (Project Manager and 3 Others) highlighting
their direct involvement with other SS4A
Comprehensive Safety Action Plans and relevant
| experience. | ||
|---|---|---|
| TOTAL: Technical Proposal: Submit 1st file for Items 1-5 above labeled "RFP Response SS4A - (Company Name)" | 12 p. | 100% |
| 6. Price Proposal: Submit 2nd separate electronic files labeled "Cost Estimate - (Company Name)" that includes a minimum of the Action Plan Development Components table below. | Any length | N/A |
| ACTION PLAN DEVELOPMENT COMPONENTS | ACTION PLAN COST ESTIMATE |
|---|---|
| 1. Project Management and Coordination | |
| 2. Data Collection and Safety Analysis | |
| 3. High Injury Network Map or approved equivalent | |
| 4. Community Engagement | |
| 5. Policy and Process Assessment | |
| 6. Strategy and Project Selections | |
| 7. Prepare SS4A Comprehensive Action Plan | |
| 8. Direct Expenses | |
| 9. TOTAL |
experience.
TOTAL: Technical Proposal: Submit 1st file for Items 1-5 12 p. 100%
above labeled "RFP Response SS4A - (Company Name)"
6. Price Proposal: Submit 2nd separate electronic files Any N/A
labeled "Cost Estimate - (Company Name)" that length
includes a minimum of the Action Plan Development
Components table below.
ACTION PLAN DEVELOPMENT COMPONENTS ACTION PLAN COST
ESTIMATE
1. Project Management and Coordination
2. Data Collection and Safety Analysis
3. High Injury Network Map or approved equivalent
4. Community Engagement
5. Policy and Process Assessment
6. Strategy and Project Selections
7. Prepare SS4A Comprehensive Action Plan
8. Direct Expenses
9. TOTAL
7. Insurance Required.
The successful firm shall provide evidence of the following insurance coverages,
which insurance shall be maintained by the successful bidder/firm during the time
that services are provided to the Borough:
* Commercial General Liability insurance in the amount of $1,000,000 per
occurrence and $3,000,000 in the aggregate. Workers' Compensation
Insurance in statutory limits as required by Pennsylvania law. Professional
Liability/Errors & Omissions with $1,000,000 limit.
8. Conflict of Interest. The Consultant shall promptly notify the Borough in writing by
certified mail of all potential conflicts of interest for any prospective business
association, interest, or other circumstance which may influence or appear to
influence the Consultant's judgment or quality of services being provided hereunder.
Such written notification shall identify the prospective business association, interest,
or circumstance, the nature of work that such a person may undertake and request an
opinion of the Borough as to whether the association, interest, or circumstance would,
in the opinion of the Borough, constitute a conflict of interest. The Borough shall
respond to such notification by certified mail within thirty (30) days.
9. Disclosures. Organizations responding to this RFP are doing so with full disclosure,
understanding, and acceptance of the following:

With GovernmentContracts, you can:
Solicitation# Types Solicitation Title Description Agency County Amended Date Solicitation Start Date Solicitation
State Government of Pennsylvania
Bid Due: 12/31/2099
Solicitation# Types Solicitation Title Description Agency County Amended Date Solicitation Start Date Solicitation
State Government of Pennsylvania
Bid Due: 12/31/2099
General Information Department for this solicitation: Procurement Date Prepared: 01/31/26 Types: IFB Advertisement
State Government of Pennsylvania
Bid Due: 12/31/2026
Solicitation# Types Solicitation Title Description Agency County Amended Date Solicitation Start Date Solicitation
State Government of Pennsylvania
Bid Due: 12/31/2099