Request for
Qualifications
COLLEGE OF MUSIC
BUILDING-PHASE 1
RFQ769-26-1023CS
DOCUMENT 001100
RFQ769-26-1023CS
NOTICE TO DESIGN PROFESSIONALS
ISSUE DATE
June 5, 2026
The University of North Texas System (UNTS) subsequently referred to as the Owner, requests firms’ qualifications
for Professional Services to facilitate the Programming and Design Services for a new building to support the UNT
College of Music, on the Denton campus. The selected firm will be highly qualified with proven experience in
programming and full design of high-quality university music facilities on university campuses. The selected firm
will be required to implement a well-coordinated programming and full design process that complies with the
vision and goals of the University. The selected firm will have the proven ability to implement a user process
and provide adequate, well informed project estimates during all phases of this project. The project delivery
method is Construction Manager-at-Risk.
The firm’s response to the Request for Qualifications (RFQ) will be the basis of determining the competence and
qualifications to perform the professional services as required by the proposed project.
Sealed qualifications for RFQ76926-1023CS will be received by the UNTS up to 2:00 p.m. CST on July 8, 2026.
Responses received after the date and hour above stated will not receive consideration.
Qualifications can be Submitted electronically through the Jaggaer web link at:
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UNTS.
You will need a username and password to access the site. Please be sure to register as a new user PRIOR to
attempting to submit your response and HUB Subcontracting Plan electronically in order to become familiar with the
site.
A HUB Sub-Contracting Plan is required and will be received up to 2:00 p.m. CST on July 8, 2026.
Pre-Solicitation Meeting
A pre-proposal meeting will be held virtually on June 15, 2026, at 11:00 am (CST), via Microsoft Teams meeting link
below to answer any address any questions in completing the response and HUB Subcontracting Plan:
_______________________________________________________________________________
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/284986755753429?p=WQjjSVi7J7zoEs9QDN
Meeting ID: 284 986 755 753 429
Passcode: E6Sp9rP6
Need help? | System reference
Dial in by phone
+1 940-304-2772,,214804168# United States, Denton
Find a local number
Phone conference ID: 214 804 168#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
Project Description
In 2018, UNT completed a comprehensive analysis of all the facilities utilized by the College. The outcomes from this
study provided an understanding of the conditions, deficiencies, and future facilities requirements to continue to deliver
academic programs in a modern environment. Recommendations were provided in a phased approach. This project is
anticipated to provide approximately 60,000-100,000 gross square feet of space to replace buildings that have been
identified for demolition in anticipation for construction of a larger expansion for the College’s facilities. The new building
will primarily house classrooms, rehearsal spaces, student practice rooms, faculty teaching offices, graduate teaching
assistant studios/offices, and other support spaces. If it is determined that relocation of functions is best accommodated
within an existing facility, renovations to those select areas/facilities may also be included within the scope of this project
College of Music Building-Phase 1
University of North Texas System
001100 - 1
NOTICE TO DESIGN PROFESSIONALS
ISSUE DATE
June 5, 2026
or under a separate contract. Acoustics, sound isolation, and occupant health and safety welfare, accessibility, and
operational efficiency, particularly the use and movement of large instruments within and between facilities, will be
important concerns, along with providing technologically rich artistic/academic environments. Shell space may also be
included.
It should be noted that the building is currently occupied and strategies to implement project will be explored and
determined during the design.
Questions
Questions concerning this proposal should be directed to:
Carrie Stoeckert, Construction Contract Expeditor III
Carrie.Stoeckert@untsystem.edu
All questions must be received no later than 2:00 p.m. CST on June 23, 2026. All questions and answers will be
posted to the website by 5:00 p.m. CST on June 25, 2026.
The Owner may in its sole discretion respond in writing to questions concerning this RFQ. Only the Owner’s responses
made by formal written Addendum to this Proposal shall be binding and shall be posted on the UNT System website
located at:
https://finance.untsystem.edu/vendor-resources/bid-inquiry/bid-opportunities.php.
Oral or other written interpretations or clarifications shall be without legal effect.
Online - Respondents can view bid documents at the following websites:
Electronic State Business Daily: http://www.txsmartbuy.com/sp
UNT System website: https://finance.untsystem.edu/vendor-resources/bid-inquiry/bid-opportunities.php
and the UNTS Jaggaer website: https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UNTS
Veteran Heros United in Business (VetHUB)
It is the policy of the Owner to promote and encourage contracting and subcontracting opportunities for
VetHUB in all contracts. The firm will be required to provide a VetHUB Subcontracting Plan (HSP) for the
intended subcontracting opportunities for this project.
All subcontracted work whether identified by the Owner or not, is required to be identified in the HSP. The
Plan should reflect all subcontracting opportunities to be utilized in this project and can be found online at
(http://www.window.state.tx.us/procurement/prog/hub/hub-forms/hub-sbcont-plan--allfms.pdf) Complete,
print, sign and submit the VetHUB Subcontracting Plan form with the response. Failure to complete the
HSP correctly will disqualify your RFQ response. Please submit the HSP through the UNTS Jaggaer
link:
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UNTS
The Owner is not bound to accept any of the RFQ responses if they are not in its best interest, as determined
by the Owner. The Owner reserves the right to: (a) enter into agreements or other contractual arrangements
for all or any portion of the Scope of Work set forth in this Proposal with one or more respondents; (b) reject
any and all responses and re-solicit responses; or (c) reject any and all responses and temporarily or
permanently abandon this procurement, if deemed to be in the best interest of the Owner.
The Owner has set a HUB Subcontracting goal for this service at 3.25%.
END OF SECTION
College of Music Building-Phase 1
University of North Texas System
001100 - 2
NOTICE TO DESIGN PROFESSIONALS
DOCUMENT 002400
RFQ769-26-1023CS
SCOPE FOR QUALIFICATIONS
ISSUE DATE
June 5, 2026
The University of North Texas System (UNTS), subsequently referred to as the Owner, requests firms’ qualifications
for Professional Services to facilitate the Programming and Design Services for a new building to support the UNT
College of Music (https://music.unt.edu), on the Denton campus. The selected firm will be highly qualified with proven
experience and expertise in programming and full design with the ability to deliver high-quality university music facilities
along with the ability to implement a user-driven process to achieve the goals and objectives for the project on behalf
of the university. The selected firm will have the proven ability to implement a user process and provide adequate,
well-informed project estimates during all phases of this project. It is expected that this project will be delivered via the
construction manager at risk process. Firm shall have successful experience in providing quality documentation and
partnering with both the Owner and the selected Contractor during all phases of a project is vital.
The firm’s response to this RFQ will be the basis of determining the competence and qualifications to perform the
professional services as required by the proposed project.
Initial services will include facilitation and documentation of the project programming process for the scope of the project
described within this RFQ solicitation. Upon successful completion of the programming phase, the Owner may elect
to extend the services of the contract to include the design, bidding assistance, and construction administration phases.
If the Owner does not elect to extend the professional services for the design, bidding assistance, and construction
administration phases, the Owner may either select another firm based on the responses from this RFQ or re-solicit.
The selected firm may also provide design services for additional phase(s) if desired and approved by the Owner. This
may include finish-out of any shelled space included during this initial project phase or the design of the next major
facility (Phase 2) for the College of Music.
Background & History
The University of North Texas College of Music is the largest public-university music program in the United States and
one of the most globally respected. Faculty and staff include internationally acclaimed artists and scholars in
composition, conducting, ethnomusicology, jazz studies, music education, music business, music history, music theory,
commercial music, recording engineering, mixing/mastering, intermedia, and performance. In 2018, UNT completed a
comprehensive analysis of all the facilities utilized by the College. The outcomes from this study provided an
understanding of the conditions, deficiencies, and future facilities requirements to continue to deliver academic
programs in a modern environment. Recommendations were provided in a phased approach.
Project Description
This project is anticipated to provide approximately 80,000-100,000 gross square feet of space to replace buildings that
have been identified for demolition in anticipation for construction of a larger expansion for the College’s facilities. The
new building will primarily house classrooms, rehearsal spaces, student practice rooms, faculty teaching offices,
graduate teaching assistant studios/offices, and other support spaces. If it is determined that relocation of functions is
best accommodated within an existing facility, renovations to those select areas/facilities may also be included within
the scope of this project or under a separate contract.
University of North Texas System
College of Music Building-Phase 1
002400 - 1
REQUEST FOR QUALIFICATION
ISSUE DATE
June 5, 2026
Purpose & Objectives
The primary purpose of this project is to provide technologically rich artistic/academic environments space within a new
facility for the College of Music that will allow for the future demolition of existing older, antiquated facilities that do not
provide adequate environmental conditions for delivery of modern music curriculum. Acoustics, sound isolation, and
occupant health and safety, welfare, accessibility, and operational efficiency, particularly the use and movement of
large instruments within and between facilities, will be important concerns. Shell space may also be included.
A. Project Programming-- The selected firm will be required to provide and fully document the project
program for design and construction for all aspects of the project scope.
Deliverables may include a draft program, final draft program, and a final program that may include the
following (at a minimum): alignment of project vision, goals, and objectives; peer benchmarking;
program/space allocation; functional relationships; site/building analysis; master plan alignment; space
test fits; specific room requirement including mechanical, electrical and plumbing; general design
requirements; security considerations; applicable codes and standards considerations; project
implementation details; and detailed, informed project cost estimate. Development of high-quality
renderings or graphic materials suitable for fundraising, stakeholder engagement, or public
communications may be included as applicable.
B. Project Design –If the Owner elects to extend the services, the selected firm will be required to develop
a comprehensive design package. Deliverables will include (but are not limited to) schematic design,
design development, construction documents and specifications. In addition, the architect’s design
services must include preparation of detailed construction cost estimates at schematic design, design
development, and 60% construction documents for Owner’s review. It is imperative that the
architect/engineer firm monitor the design during the various stages of the project, so the Owner’s
construction budget is not exceeded.
C. Contractor/Subcontractor Bidding – The selected firm is to attend all contractor pre-proposal meetings
and provide any additional documentation required by the contractor during the bidding and selection of
the subcontractor trades.
D. Construction Administration – The selected firm will provide a full array of construction administration
services. These services will include (but are not limited to) submittal and shop drawing approvals,
construction and post construction documentation, issuance of architectural supplemental instructions
(ASI), compilation and completion of punch lists, all close-out documentation including record drawings,
and participation in all construction meetings.
E. Project Budget – The project budget has not yet been established. Once established by the Owner, the
selected team will be responsible for employing strategies to ensure the budget is not exceeded during
the various project phases of design and construction.
F. Project Schedule – Please include in the response a schedule for the programming phase and anticipated
durations of the design, and construction phases of the project.
Schedule for construction implementation is yet to be determined on this Project.
University of North Texas System
College of Music Building-Phase 1
002400 - 2
REQUEST FOR QUALIFICATIONS
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.