| Location: | Connecticut |
|---|---|
| Posted: | Jun 16, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | City of Waterbury |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 8851 |
| Publication URL: | To access bid details, please log in. |
Replace the existing oil-fired boiler with a new, high-efficiency oil hot water boiler.
A mandatory pre-bid conference will be held at 889 Washington Ave at 10:00 a.m. on June 16, 2026. Attendance and on-time sign-in at the pre-bid conference by a representative of each Bidder is mandatory.
There will be a second mandatory pre-bid meeting on July 1, 2026 at 3:00PM at 889 Washington Avenue Extension, Waterbury, CT. If you attended the meeting on June 16, 2026, your company does not need to attend but is welcome.

With GovernmentContracts, you can:
...KITCHEN TO STREAMLINE SERVICES AND OPTIMIZE EFFICIENCY. Start Date : October 27, 2026 ...
State Government of Connecticut
Bid Due: 11/11/2026
...that provides the best combination of reliability, energy efficiency, maintainability, occupant comfort...
State Government of Connecticut
Bid Due: 11/05/2026
...of the pumping equipment, alongside targeted chemical redevelopment to restore well efficiency...
State Government of Connecticut
Bid Due: 11/20/2026
...chemical redevelopment to restore well efficiency. Timeline Release Project Date: October 30, 2026...
City of Meriden
Bid Due: 11/20/2026