| Location: | Texas |
|---|---|
| Posted: | Mar 9, 2026 |
| Due: | Apr 14, 2026 |
| Agency: | Richardson city |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 35-26 |
| Publication URL: | To access bid details, please log in. |
Project Description: The purpose of this project is to perform replacement of existing 2,400-gallon steel water surge tank & standpipe for the 20-inch West Side Transfer Line from the North Side Pump station. It is located behind 17919 Waterview Parkway. Based on the evaluation performed by TIC in 2015, interior of existing tank and the bottom plate were found in poor conditions with large areas of corrosion and metal loss. Estimated quote obtained from a contractor to rehab and another contractor to replace the tank with paint, delivery, and installation came in very close, so replacement with a new tank option is selected.

With GovernmentContracts, you can:
...Project: Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation Ref. #: ...
City of Waco
Bid Due: 8/06/2026
...Mount Carmel Water Treatment Plant Vertical Turbine Pump #7 Installation Follow Solicitation.../Item Code: ...
State Government of Texas
Bid Due: 8/06/2026
...facility, generator building, fire pump building & fencing interior to the complex. Buildings... ...
DEPT OF DEFENSE
Bid Due: 8/12/2026