| Location: | Illinois |
|---|---|
| Posted: | Jun 16, 2026 |
| Due: | Jul 13, 2026 |
| Agency: | Gurnee village |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project # 8454
LOCATIONS:
PROPOSED IMPROVEMENT:
Scope of work includes installation of approximately 600 lineal feet of 5-foot-wide sidewalk, drainage
improvements, installation of pedestrian crosswalk striping, pedestrian signal modifications, traffic signal
improvements, pavement markings, ADA-compliant curb ramps, earth excavation, aggregate base course, and all
necessary restoration.

With GovernmentContracts, you can:
...positive for certain contaminants, primarily from street sweeping activities and excavation spoils... sweeping: ...
DuPage County
Bid Due: 7/30/2026
...include earth excavation, aggregate base, base repair, topsoil and sod, pavement markings, detector...
City of Elgin
Bid Due: 7/20/2026
...excavation, dewatering, riprap placement, concrete barrier, conserved topsoil placement, mulching and seeding...
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/12/2026
...include earth excavation, aggregate base, base repair, topsoil and sod, pavement markings, detector...
City of Elgin, Illinois
Bid Due: 7/20/2026