| Location: | Utah |
|---|---|
| Posted: | Feb 12, 2026 |
| Due: | Mar 5, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-024 |
| Publication URL: | To access bid details, please log in. |
Project Description: Reconstruction of 1700 S between State Street and 800 E. Utility work along 1700 S, 800 E, 750 E between State Street and University Parkway including: storm drain pipe and structures installation, water line pipe and structures replacement, sewer line pipe and structures replacement, concrete flatwork, sidewalk, drive approaches, and other improvements. Sewer line and structures removal and replacement on 400 N between 1000 E and 1200 E. The engineer's estimate for the work is $3,000,000.00 - $3,500,000.00

With GovernmentContracts, you can:
...that is the subject of the bid comprises the concrete paving of the ...
State Government of Utah
Bid Due: 6/30/2026
...concrete removed or damaged during water leak repair activities. Work generally includes the ...
State Government of Utah
Bid Due: 6/18/2026
...purpose of this IFB is to enter into a contract to provide: Removal ...
State Government of Utah
Bid Due: 7/06/2026