ADDENDUM NO. 1 - City of Rio Grande City 25-26 Road Improvements / Paving Project - TDA Contract No.: CDV25-0261

Location: Texas
Posted: Oct 19, 2026
Due: Oct 27, 2026
Agency: Rio Grande City
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
  • ADDENDUM NO. 1 - City of Rio Grande City 25-26 Road Improvements / Paving Project - TDA Contract No.: CDV25-0261

    document _recordid

    669
  • Attachment Preview

    TECHNICAL SPECIFICATIONS
    SPECIFICATIONS
    SECTION 01568 - EROSION AND SEDIMENT CONTROL
    SECTION 01570 - TRAFFIC REGULATION
    SECTION 02080 - ADJUSTING MANHOLES CLEANOUTS,
    INLET, & WATER VALVE RISERS
    SECTION 02160 - TRENCH SAFETY SYSTEM
    SECTION 02210 - SITE GRADING
    SECTION 02222 - EXCAVATION
    SECTION 02223 - BACKFILLING
    SECTION 02225A - TRENCHING
    SECTION 02510 - ASPHALTIC CONCRETE PAVING
    SECTION 02511 - FLEXIBLE BASE
    SECTION 03100 - CONCRETE FORMWORK
    SECTION 03200 - CONCRETE REINFORCEMENT
    SECTION 03300 - CAST IN PLACE CONCRETE
    1

    SECTION 01568 - EROSION AND SEDIMENT CONTROL
    PART 1 - GENERAL
    WORK INCLUDED
    Provide all equipment and materials, and do all work necessary to construct complete
    erosion and sediment control program for minimizing erosion and siltation during the
    construction phase of the project. The erosion and sediment control provisions specified
    herein are the minimum requirements for an erosion control program. The Contractor
    shall provide additional erosion and sediment control materials and methods as required
    to affect the erosion and siltation control principles specified herein.
    SUBMITTALS
    Proposed methods, materials to be employed, and schedule for effective erosion and
    siltation control as well as preventing erosion damage shall be submitted for approval.
    Submittals shall include:
    Propose methods for effecting erosion and siltation control, including plans
    indicating location of erosion control devices and siltation basins.
    List of proposed materials including manufacturer's product data.
    Schedule of erosion control program indicating specific dates from implementing
    programs in each major area of work.
    EROSION CONTROL PRINCIPLES
    The following erosion control principles shall apply to the land grading and construction
    phases:
    Stripping of vegetation, grading, or other soil disturbance shall be done in a
    manner, which will minimize soil erosion.
    Whenever feasible, natural vegetation shall be retained and protected.
    Extents of areas, which are exposed and free of vegetation and the duration of its
    exposure, shall be kept within practical limits.
    Temporary seeding, mulching, or other suitable stabilization measures shall be
    used to protect exposed critical areas during prolonged construction or other land
    disturbances.
    2

    Drainage provisions shall accommodate increased runoff resulting from
    modifications of soil and surface conditions during and after development or
    disturbance. Such provisions shall be in addition to existing requirements.
    Sediment shall be retained on-site.
    Erosion control devices shall be installed as early as possible in the construction
    sequence prior to start of clearing and grubbing operations and excavation work.
    Cut and fill slopes and stockpiled materials shall be protected to prevent erosion.
    Slopes shall be protected with permanent erosion protection when erosion
    exposure period is expected to be greater than or equal to six months, and
    temporary erosion protection when erosion exposure period is expected to be less
    than six months.
    Permanent erosion protection shall be accomplished by seeding with grass and
    covering with an erosion protection material, as appropriate for prevailing
    conditions.
    Temporary erosion protection shall be accomplished by covering with an erosion
    protection material, as appropriate for prevailing conditions.
    PART 2 - PRODUCTS
    HAY BALES
    Hay bales for construction of erosion control devices shall be new, firm, wire or nylon-
    bound livestock feed-grade.
    SILT FENCING
    Silt fencing for construction of erosion control devices shall be new and un-used. Silt
    fencing shall be as approved by the Engineer.
    PART 3 - EXECUTION
    HAY BALE CHECK DAM
    Hay bale check dam shall be constructed and installed at surface runoff discharge points
    from the major work areas before start of clearing and grubbing.
    HAY BALE CATCH BASIN FILTER
    Catch basin filters shall be placed at all inlets to drainage structures as structures are
    installed. Outlet protection work shall be constructed before runoff is allowed to enter
    3

    the drainage system. Construction and location of catch basins filters shall be as those
    areas affected by surface runoff from the area of construction. Existing catch basins will
    be protected from sediment.
    MAINTENANCE AND REMOVAL OF EROSION CONTROL DEVICES
    Watercourses and drainage swales adjacent to construction activities shall be monitored
    twice each month for evidence of silt intrusion and other adverse environmental impacts,
    which shall be corrected immediately upon discovery.
    Culverts, drainage ditches and storm sewer pipes shall be kept clean and clear of
    obstructions during construction.
    EROSION CONTROL DEVICES
    Sediment behind the erosion control device shall be checked twice a month and after each
    heavy rain. Silt shall be removed if greater than six (6) inches deep.
    Conditions of erosion control devices shall be checked twice each month or more
    frequently as required. Damaged and/or deteriorated items shall be replaced. Erosion
    control devices shall be maintained in place and in effective condition.
    Hay bales shall be inspected frequently and maintained or replaced as required to
    maintain both their effectiveness and essentially their original condition. Underside of
    bales shall be kept in close contact with the earth below at all times, as required to
    prevent water from washing beneath bales.
    Silt fences shall be maintained plumb and anchored to the ground without any major tears
    in material that will allow sediment to be released. Any torn or destroyed silt fence shall
    be replaced. Silt fence shall be kept in close contact with the earth below at all times, as
    required to prevent water from washing beneath the silt fence.
    Sediment deposits shall be disposed of properly, in a location and manner which will not
    cause sediment nuisance elsewhere.
    REMOVAL OF EROSION CONTROL DEVICES
    Erosion control devices shall be maintained until all disturbed earth has been paved or
    vegetated, at which time they shall be removed. After removal, areas disturbed by these
    devices shall be regraded.
    Erosion protection material shall be kept securely anchored until acceptance of completed
    entire project.
    PAYMENT
    4

    Erosion and sediment control shall be incidental and subsidiary to bid items identified in
    proposal form.
    5

    SECTION 01570 - TRAFFIC REGULATION
    PART 1 - GENERAL
    SECTION INCLUDES:
    Construction parking control
    Flag persons
    Flares and lights
    Haul routes
    Traffic signs and signals
    Removal
    PART 2 - PRODUCTS
    SIGNS, SIGNALS, AND DEVICES
    Post Mounted and Wall Mounted Traffic Control and Informational Signs
    Traffic Control Signals: As approved by local jurisdictions.
    Traffic Cones and Drums, Flares and Lights: As approved by local jurisdictions.
    Flagman Equipment: As required by local jurisdictions.
    PART 3 - EXECUTION
    CONSTRUCTION PARKING CONTROL
    Control vehicular parking to prevent interference with public traffic and parking, access
    by emergency vehicles, and Owner's operations.
    Monitor parking of construction personnel's vehicles [in existing facilities]. Maintain
    vehicular access to and through parking areas.
    Prevent parking on or adjacent to access roads or in non-designated areas.
    6

    FLAG PERSONS
    Provide trained and equipped flag persons to regulate traffic when construction
    operations or traffic encroach on public traffic lanes.
    FLARES AND LIGHTS
    Use flares and lights during hours of low visibility to delineate traffic lanes and to guide
    traffic.
    HAUL ROUTES
    Consult with authority having jurisdiction, establish public thoroughfares to be used for
    haul routes and site access.
    TRAFFIC SIGNS AND SIGNALS
    At approaches to site and on site, install at crossroads, detours, parking areas, and
    elsewhere as needed to direct construction and affected public traffic.
    Install and operate traffic control signals to direct and maintain orderly flow of traffic in
    areas under Contractor's control, and areas affected by Contractor's operations.
    Relocate as Work progresses, to maintain effective traffic control.
    REMOVAL
    Remove equipment and devices when no longer required.
    Repair damage caused by installation.
    Remove post settings to a depth of 2 feet.
    7

    SECTION 02080
    ADJUSTING MANHOLES CLEANOUTS, INLET, & WATER
    VALVE RISERS
    PART 1 - GENERAL
    1.01 GENERAL DESCRIPTION OF WORK:
    A. This work shall consist of furnishings and installation of
    materials and for adjusting manholes, cleanouts, inlets or water
    valves risers in accordance with details on the plans and as
    specified herein as directed by the ENGINEER.
    B. Manholes, cleanouts, inlets and water valve risers shall be
    adjusted to position and/or elevation as shown on the plans or
    as ordered by the ENGINEER and in accordance with these
    specifications.
    PART 2 - PRODUCTS
    2.01 GENERAL:
    A. Manhole, cleanout, and inlet covers, water valve risers, and
    brick in good condition, removed in the process of adjustment,
    may be re-used.
    B. Additional materials required shall be provided as required.
    2.02 MATERIALS:
    A. Concrete
    1. Concrete for inlets shall be 3000 psi (28 day compressive
    strength) concrete containing a minimum of 5 sacks
    cement per cubic yard.
    B. Mortar:
    8

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Project: Water, Wastewater, Stormwater, Paving, and Transportation Infrastructure Needs Assessment... Engineering and Planning ...

    City of Dallas

    Bid Due: 11/06/2026

    ...Project: Water, Wastewater, Stormwater, Paving, and Transportation Infrastructure Needs Assessment... Engineering and Planning ...

    City of Dallas

    Bid Due: 11/06/2026

    ...Posting Date: 10/15/2026 Last Modified: 10/15/2026 2:38 pm Class/Item Code: 91394-Paving/Resurfacing...; Zone - ...

    State Government of Texas

    Bid Due: 11/13/2026

    ...Kitchen Equipment (Not Otherwise Classified); 21055-Paving And Stepping Blocks; 42063-Lounge...; site grading and ...

    State Government of Texas

    Bid Due: 12/01/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.