| Location: | Massachusetts |
|---|---|
| Posted: | Jun 16, 2026 |
| Due: | Jul 13, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Town of Athol invites sealed bids for the South Street Improvement Project Phase III. The Town of Athol has completed the engineering design for Phase III of the South Street corridor reconstruction. This phase covers the section of South Street between Freedom Street and Tunnel Street. The project consists of furnishing all labor, tools, materials, and equipment necessary for 1) Roadway pavement replacement: 675-LF of full-depth asphalt pavement replacement from the
Freedom Street intersection to the culvert; 2) Mill and overlay: 70-LF of roadway milling and overlay from the culvert to the Tunnel Street intersection; and 3) Sidewalk improvements: 920-LF of ADA-compliant concrete sidewalk along the north side of South Street, extending from the Freedom Street intersection to the Tunnel Street intersection. This project is administered by the Town of Athol and the Central Massachusetts Regional Planning Commission (CMRPC) and funded by the Massachusetts Executive Office of Housing and Livable Communities (EOHLC), FY2026 Athol Community Development Block Grant (CDBG) Program.

With GovernmentContracts, you can:
...Informal Bid Flag: No Purchase Method: Open Market Pre Bid Conference: N/A Bulletin ...
Commonwealth of Massachusetts
Bid Due: 7/23/2026
...Bid Number: FY2027-02 Bid Title: ADA Ramps and Concrete Sidewalks, 2026 Category: Open ...
City of Waltham
Bid Due: 8/12/2026
...-inch diameter reinforced concrete pipe embedded 15 inches with native streambed material. The ...
Wright-Pierce
Bid Due: 8/06/2026
...: Open Market Pre Bid Conference: None Bulletin Desc: Material include: Bituminous Concrete ...
Commonwealth of Massachusetts
Bid Due: 8/10/2026