| Location: | Virginia |
|---|---|
| Posted: | May 13, 2025 |
| Due: | Jun 18, 2025 |
| Agency: | City of Richmond |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CSO 019A, CSO 19B, and Hampton St Pump Station Improvements
Addenda: 0
Release Date: 5/13/2025
Due Date: 6/18/2025
The Work on the Project will include:
A. Demolition of existing gates at CSO 019A and CSO 019B,
B. Furnishing and installing actuated slide gates and instrumentation and control components within the CSO 19A Regulator and Hampton Pump Station,
C. Furnishing and installing a new Motor Control Center ("MCC") at the Hampton Pump Station,
D. Replacing all the level transmitters at Hampton Pump Station and CSO 19B with Siemens Hydroranger 200 HMI,
1. Installing their connections to the new Programmable Logic Control System ("PLC").
E. Replacing the flow magmeters at the Hampton Pump station and CSO 19B with Toshiba Model LF654, and
F. Furnishing and installing a new PLC at the Hampton Pump Station.

With GovernmentContracts, you can: