CGC MIDGETT - Dual Point Biennial Maintenance

Location: Hawaii
Posted: Feb 28, 2025
Due: Mar 6, 2025
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • 20 - Ship and Marine Equipment
Solicitation No: 70Z085Q11258
Publication URL: To access bid details, please log in.
Follow
CGC MIDGETT - Dual Point Biennial Maintenance
Active
Contract Opportunity
Notice ID
70Z085Q11258
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Feb 28, 2025 10:21 am PST
  • Original Date Offers Due: Mar 06, 2025 08:00 am PST
  • Inactive Policy: Manual
  • Original Inactive Date: Mar 06, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    Honolulu , HI 96819
    USA
Description

General Requirements




  1. SCOPE



Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.




  1. REFERENCES



COAST GUARD DRAWINGS



Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements



Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans



Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)



Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)



Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)



COAST GUARD PUBLICATIONS



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements



Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test



Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation



Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures



Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)



OTHER REFERENCES



National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code





3. REQUIREMENTS



3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.





3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.





3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.





3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.









































58300_RTK_1023_418




  1. Dual Point Davit, Biennial Maintenance, Perform



1. SCOPE



1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.



TABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA



description



LOCATION



davit total gross weight



Allied Systems Dual Point Davit with Control Console



Models: DDP11000CTS & SP2200



Weather Deck, STBD Side, Frame 47



29,000 lbs



1.2 Government-furnished property.



MTI



ITEM DESCRIPTION



NSN/PN



QTY



ESTIMATED COST ($/UNIT)



Y



CB-OTH Mark IV



(Coast Guard Drawing 26B-CB-IV-801-001)



N/A



1 ea.



N/A



Y



Hook



Model APR-356-CBH



2 ea.



5000.00



2. REFERENCES



Coast Guard Drawings



Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements



Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan





COAST GUARD PUBLICATIONS



Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757)



Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750)



Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2348) (Hull 754)



Coast Guard Technical Publication (TP) 9899 SWBS 583, Apr 2021, Marine Crane – Models DDP11000CTS & SP2200 (S/N: 2366) (Hull 755)



Coast Guard Technical Publication (TP) 9900, SWBS 583, Apr 2021, Marine Crane – Models DDP11000CTS & SP2200 – S/N 2382 (Hull 756)



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements



Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems



Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures





Other References



International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011



International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition



ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus



3. REQUIREMENTS



3.1 General.





3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):




  • 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2)




  • 3.2.1 Hook certification.





3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:




  • Advise on manufacturer's proprietary system information.




  • Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.





3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.





3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.





3.1.2.3 Point of contact:




  • Heath Munger




  • Heath.munger@alliedsystems.com




  • Allied Systems Company




  • (503) 825-3366





3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).



3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.





3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.



3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:




  • Piping




  • Electrical Cables




  • Capstan



NOTE



Coast Guard personnel will operate all shipboard machinery and equipment.



3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.





3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2.



TABLE 2 – LIST OF PARTS



QUANTITY



PART NUMBER



DESCRIPTION



SOURCE OF SUPPLY



1



593533



Kit, Element Replacement



Allied System Co.



214 S.W. Oregon Street, Sherwood OR 97140



1



593532



Kit, Element Replacement



2



70196



Return Filters



2



74130



Seal Kits



2



71975



Filter Breather



1



71754



Tank Cover Gasket



2



71042



Wire Rope



2



73441



Hub



3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.



TABLE 3 – Recurring Maintenance task





ADDITION REQUIREMENTS



#



TASK TYPE



QTY



COMPONENT OR ASSEMBLY



APPENDIX AND PARA. FROM SFLC STD 5000



OTHER



1



Operate and Inspect



1



Dual Point Davit System



3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements)



Submit CIR.



2



Service and Inspect



1



Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators.



3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers)



Submit CFR.



3



Disassemble and Inspect



2



Power Sheave Assembly



3.2.3 (Disassemble and Inspect)



Renew the hub with CFE. If hubs are not available, clean, inspect, and reinstall hubs.



4



Hydraulic Lube Oil Analysis



1



Hydraulic System



C2.1.3.1



Submit a CIR.



5



Renew



2



Wire Rope Assembly



(Allied System Part No. 71042)



D2.2 (Wire rope assemblies)



Wire rope particulars: Nominal diameter: 5/8 inch





Minimum Breaking Strength: 56,040 lbs.





Total length of each wire rope required: 110 ft.



End fitting type: Fiege. Submit a CFR.



6



NDE



1



Dual Point Davit System



3.2.5 (NDE)



Areas to NDE: all weld joints and boom and turret structures.



Submit a CFR.



7



Groom and Lubricate



1



Dual Point Davit System



3.2.6 (Groom and Lubricate)





8



Weight Test



1



Dual Point Davit System



B2.7.2 (Dual Point Davits)



B2.7.2.1 No-load Operational Test



B2.7.2.2 Static Load Test



B2.7.2.3 Winch/Brake/Modified static load Test



B2.7.2.4 Dynamic Load Test



B2.7.2.5 Rated Load test



Test weight particulars:



Working Load Limit (11,000 lb.).





"Modified static / brake" test load: 16,500 pounds (150% of WLL)





“Modified Dynamic Test Load: 12,650 pounds (115% of WLL)



9



Electric Motors



1



Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors





Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.



10



Fabricate and Install



1



Label plate



B2.9 (Label Plates)





11



Partially Preserve



1



Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces)



3.2.4 (Partial Preservation)





12



Service and Inspect



1



Control Panel



3.2.2 (Service and Inspect)



Verify all mechanical and electrical signals to the control panel. Submit a CFR.



3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.





3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.





3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.



TABLE 4 - SPECIAL REQUIREMENTS



Component



Appendix & Paragraph in sflc std spec 5000



Fluids



C2.1



Hose assemblies



C2.2



Piping and tubing



C2.3



Valves and manifolds



C2.4



Gages



C2.5



Gas charged accumulators



C2.6



Heat exchangers and fluid coolers



C2.7



Systems



C2.8



Fastener assemblies



D2.1



Wire rope assemblies



D2.2



Brakes and clutches



D2.3



Open gearing and gear reducers



D2.4



NOTE



Coast Guard personnel will operate all shipboard machinery and equipment.



3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.



3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.





3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.



NOTE



Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.



3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.





4. NOTES





FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE



General Requirements




  1. SCOPE



Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.




  1. REFERENCES



COAST GUARD DRAWINGS



Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements



Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans



Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)



Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)



Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)



COAST GUARD PUBLICATIONS



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements



Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test



Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation



Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures



Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)



OTHER REFERENCES



National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code





3. REQUIREMENTS



3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.





3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.





3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.





3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.









































58300_RTK_1023_418




  1. Dual Point Davit, Biennial Maintenance, Perform



1. SCOPE



1.1 Intent. This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1.



TABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA



description



LOCATION



davit total gross weight



Allied Systems Dual Point Davit with Control Console



Models: DDP11000CTS & SP2200



Weather Deck, STBD Side, Frame 47



29,000 lbs



1.2 Government-furnished property.



MTI



ITEM DESCRIPTION



NSN/PN



QTY



ESTIMATED COST ($/UNIT)



Y



CB-OTH Mark IV



(Coast Guard Drawing 26B-CB-IV-801-001)



N/A



1 ea.



N/A



Y



Hook



Model APR-356-CBH



2 ea.



5000.00



2. REFERENCES



Coast Guard Drawings



Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements



Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan





COAST GUARD PUBLICATIONS



Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757)



Coast Guard Technical Publication (TP) 9618, SWBS 583, Sept 2023, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2328-753, 2329-751, 2332-750)



Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models DDP11000CTS & SP2200 (S/N: 2348) (Hull 754)



Coast Guard Technical Publication (TP) 9899 SWBS 583, Apr 2021, Marine Crane – Models DDP11000CTS & SP2200 (S/N: 2366) (Hull 755)



Coast Guard Technical Publication (TP) 9900, SWBS 583, Apr 2021, Marine Crane – Models DDP11000CTS & SP2200 – S/N 2382 (Hull 756)



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements



Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems



Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures





Other References



International Maritime Organization (IMO) International Convention for the Safety of Life At Sea (SOLAS), 2009 as amended in 2010 and 2011



International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition



ANSI/EASA Standard AR100-2020, Recommended Practice for the Repair of Rotating Electrical Apparatus



3. REQUIREMENTS



3.1 General.





3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):




  • 3.2 Biannual maintenance inspection and repair task particulars (Task #1 and #2)




  • 3.2.1 Hook certification.





3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Dual Point Davit (i.e. Allied System Co. Model No. DDP11000CTS) to accomplish the following on site:




  • Advise on manufacturer's proprietary system information.




  • Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, repair, reassembly, and testing as applicable.





3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.





3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.





3.1.2.3 Point of contact:




  • Heath Munger




  • Heath.munger@alliedsystems.com




  • Allied Systems Company




  • (503) 825-3366





3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).



3.1.3.1 Protection of fine surfaces. The Contractor must protect all fine surfaces in accordance with SFLC Std. Spec 5000.





3.1.3.2 Hydraulic system contamination protection. The Contractor must maintain existing hydraulic cleanliness in accordance with SFLC Std. Spec 5000.



3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:




  • Piping




  • Electrical Cables




  • Capstan



NOTE



Coast Guard personnel will operate all shipboard machinery and equipment.



3.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.





3.1.6 Materials. The Contractor must furnish and install parts listed in Table 2.



TABLE 2 – LIST OF PARTS



QUANTITY



PART NUMBER



DESCRIPTION



SOURCE OF SUPPLY



1



593533



Kit, Element Replacement



Allied System Co.



214 S.W. Oregon Street, Sherwood OR 97140



1



593532



Kit, Element Replacement



2



70196



Return Filters



2



74130



Seal Kits



2



71975



Filter Breather



1



71754



Tank Cover Gasket



2



71042



Wire Rope



2



73441



Hub



3.2 Biannual maintenance inspection and repair task particulars. The Contractor with Tech Rep support must perform the tasks designated in Table 3 below and Figure 1 in accordance with SFLC Std Spec 5000 and CG Tech Pub as applicable.



TABLE 3 – Recurring Maintenance task





ADDITION REQUIREMENTS



#



TASK TYPE



QTY



COMPONENT OR ASSEMBLY



APPENDIX AND PARA. FROM SFLC STD 5000



OTHER



1



Operate and Inspect



1



Dual Point Davit System



3.2.1 (Operate and Inspect) Appendix A (General Inspection Requirements)



Submit CIR.



2



Service and Inspect



1



Hydraulic Winch Assembly (Constant Tension and Normal) which are powered by Main Hydraulic Pump/Motor Assembly (ST1) and Back Up powered by Emergency (ST2), Accumulators.



3.2.2 (Service and Inspect) D2.3 (Brakes and clutches. D2.4 (Open gearing and gear reducers)



Submit CFR.



3



Disassemble and Inspect



2



Power Sheave Assembly



3.2.3 (Disassemble and Inspect)



Renew the hub with CFE. If hubs are not available, clean, inspect, and reinstall hubs.



4



Hydraulic Lube Oil Analysis



1



Hydraulic System



C2.1.3.1



Submit a CIR.



5



Renew



2



Wire Rope Assembly



(Allied System Part No. 71042)



D2.2 (Wire rope assemblies)



Wire rope particulars: Nominal diameter: 5/8 inch





Minimum Breaking Strength: 56,040 lbs.





Total length of each wire rope required: 110 ft.



End fitting type: Fiege. Submit a CFR.



6



NDE



1



Dual Point Davit System



3.2.5 (NDE)



Areas to NDE: all weld joints and boom and turret structures.



Submit a CFR.



7



Groom and Lubricate



1



Dual Point Davit System



3.2.6 (Groom and Lubricate)





8



Weight Test



1



Dual Point Davit System



B2.7.2 (Dual Point Davits)



B2.7.2.1 No-load Operational Test



B2.7.2.2 Static Load Test



B2.7.2.3 Winch/Brake/Modified static load Test



B2.7.2.4 Dynamic Load Test



B2.7.2.5 Rated Load test



Test weight particulars:



Working Load Limit (11,000 lb.).





"Modified static / brake" test load: 16,500 pounds (150% of WLL)





“Modified Dynamic Test Load: 12,650 pounds (115% of WLL)



9



Electric Motors



1



Normal RIHB Boat Davit and Emergency RIHB Davit HPU Motors





Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Para 6.5.4.3 of TP 9618. Submit a CFR.



10



Fabricate and Install



1



Label plate



B2.9 (Label Plates)





11



Partially Preserve



1



Dual Point Davit Assembly (including pedestal, foundation, and all previously/normally painted components or surfaces)



3.2.4 (Partial Preservation)





12



Service and Inspect



1



Control Panel



3.2.2 (Service and Inspect)



Verify all mechanical and electrical signals to the control panel. Submit a CFR.



3.2.1 Hook certification. The Contractor with Tech Rep support must inspect the hooks and verify their certification. Submit a CIR. Hooks (i.e. P/N: Model APR-356-CBH) must be renewed at every 48 months with GFP. Renew hooks if certification is expired.





3.2.1.1 Mandatory Turn-in Item (MTI) removal. If required to be renewed, the Contractor must remove the existing MTI hooks and turn over to the COR.





3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 4 below, the Contractor must perform work in accordance with the corresponding Appendix or paragraph of SFLC Std Spec 5000.



TABLE 4 - SPECIAL REQUIREMENTS



Component



Appendix & Paragraph in sflc std spec 5000



Fluids



C2.1



Hose assemblies



C2.2



Piping and tubing



C2.3



Valves and manifolds



C2.4



Gages



C2.5



Gas charged accumulators



C2.6



Heat exchangers and fluid coolers



C2.7



Systems



C2.8



Fastener assemblies



D2.1



Wire rope assemblies



D2.2



Brakes and clutches



D2.3



Open gearing and gear reducers



D2.4



NOTE



Coast Guard personnel will operate all shipboard machinery and equipment.



3.4 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.



3.4.1 The Contractor with Tech Rep support must perform a dockside test, consisting of launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Submit a CFR.





3.5 Touch-up preservation. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.



NOTE



Government will provide 72 Hours of advance notice to the Contractor for sea trial support by the Tech Rep.



3.6 Sea trial. The Contractor must provide Tech Rep support to test operational capability of the Dual Point Davit with GFP in accordance with TP. Estimated time for sea trial is eight hours. Perform an at sea test launching the GFP boat to test Constant Tension Function, Wire Rope Tension, CT Select Button, Control function, CT Engage, Brake Release etc. Ensure all functions are in satisfactory operating conditions. Submit a CFR.





4. NOTES





FIGURE 1: DUAL POINT DAVIT MAINTENANCE TABLE


Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Feb 28, 2025 10:21 am PSTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.