| Location: | Vermont |
|---|---|
| Posted: | Nov 2, 2026 |
| Due: | Nov 6, 2026 |
| Agency: | State of Vermont - Agency of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | C03291 |
| Publication URL: | To access bid details, please log in. |
| CONSTRUCTION ADVERTISEMENTS | QUESTIONS DUE PRIOR TO 4:30 PM | ADDENDA | BID OPENING |
|
C03291 ROCKINGHAM REGM2336 & ROCKINGHAM REGM2337 PROPOSAL TMP Checklist - 23g747 TMP Checklist - 23g748 APPROVED BIDDERS LIST PLAN HOLDERS LIST DOWNLOAD PLANS IN iCX |
10/28/2026 |
Addendum #1 | 11/6/2026 |
| VTransMissionandVision | |
|---|---|
| Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods. |
VERMONT CA-96
Contract Number: C03291
Contract Name: ROCKINGHAM REGM2336 & ROCKINGHAM REGM2337
VERMONT
AGENCYOFTRANSPORTATION
PROPOSAL
STANDARDSPECIFICATIONSFORCONSTRUCTION
DATED2024SHALLAPPLYTOTHISCONTRACT
SPECIALPROVISIONS
SCHEDULEOFITEMS
ELECTRONICBIDBONDtobesubmittedintheamountof5%oftheContractor'sbid.
BIDDINGPROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregulariftheyarenotincompliancewithAgencyspecifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
Systemservices.
VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.
Asafe,reliable,andmultimodaltransportationsystemthatgrowstheeconomy,isaffordabletouseand
operate,andservesvulnerablepopulations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
404 Corps of Engineers Permit - 23g747 _____________________________________________ 17
404 Corps of Engineers Permit - 23g748 _____________________________________________ 57
FEMA General Provisions ________________________________________________________ 97
FEMA - Byrd Anti Lobbying Act Certification of Compliance Form _______________________ 106
Bidding Requirements and Conditions ______________________________________________ 108
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 120
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 125
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 135
Standard Federal EEO Construction Contract Specifications _____________________________ 138
Contractor EEO Certification Form - CA109 _________________________________________ 145
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 146
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 150
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 151
Proposal Schedule of Pay Items ____________________________________________________ 152
Rockingham REGM2336; Rockingham REGM2337
PIN Number(s): 23g747; 23g748 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS - CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 15, 2027.
2. NOTICE TO BIDDERS - PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of Contract awarding process.
3. NOTICE TO BIDDERS - ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://outside.vermont.gov/agency/vtrans/external/docs/construction/Contracting/DocExpressOv
erviewforContractors.docx
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
4. NOTICE TO BIDDERS - CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on October
28, 2026. Inquiries received prior to this time will receive a response from the Agency. Inquiries
received after this time may receive a response at the Agency's discretion.
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 2
5. NOTICE TO BIDDERS - OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
404 Corps of Engineers Permit - 23G747
404 Corps of Engineers Permit - 23G748
FEMA General Provisions
Certification Regarding Byrd Anti-Lobbying Form
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A and E
Standard Federal Equal Employment Opportunity Construction Contract Specifications - CA26
Contractor Equal Employment Opportunity Certification Form - CA109
Vermont Agency of Transportation Certificate of Compliance - CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates - CA101
Commodity Index Prices - CA170
Schedule of Pay Items
6. NOTICE TO BIDDERS - FEMA DOCUMENTS REQUIRED BEFORE BIDDING. The
Contractor is hereby notified that they must prepare and submit the following documents, which
are included in the proposal, as part of their request for Contract-specific prequalification. If a
Contractor fails to submit these documents as specified below, they will not be approved to bid on
this Contract. These documents are mandated as part of the FEMA Contract Provisions Guide,
Version 2, Effective October 1, 2024.
(a) Certification Regarding Byrd Anti-Lobbying Form. The Contactor shall fill in and sign the
last page of the form.
7. NOTICE TO BIDDERS - NEW PREQUALIFICATION FORM. The Contractor is hereby
notified that the Agency is required by the U.S. Department of Transportation to develop and
maintain a list of information about all firms that bid on federally funded Contracts in accordance
with 49 C.F.R. 26.11. The Agency has developed a new electronic form to collect this
information. The Contractor shall fill out this form as part of their project-specific prequalification
for every Contract that they bid on. A link to this form is provided in the prequalification form
available through iCX and the Agency's website.
8. NOTICE TO BIDDERS - DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are not applicable to this Contract.
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 3
9. NOTICE TO BIDDERS - GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
10. NOTICE TO BIDDERS - STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA.
11. NOTICE TO BIDDERS - INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist - 23G747
(b) Traffic Management Plan (TMP) Checklist - 23G748
12. NOTICE TO BIDDERS - FEMA REVIEW OF OFF-SITE ACTIVITY AREAS. The Contractor
is hereby notified of the following requirements and constraints related to Off Site Activity Areas.
(a) The project limits for waste, borrow, staging, construction, and access activities are shown
on the Plans. Waste, borrow, staging, construction, and access shall only be
performed within these limits unless otherwise approved by the property owners and
cleared in accordance with Subsection 105.25 through Subsection 105.27.
(b) Unless an Off-Site Activity Exemption Record Form has been completed and filed, the
Federal Emergency Management Agency (FEMA) must also evaluate environmental
impacts and concur with site selection outside the project limits. The use of non-exempt
sites outside the project limits will require additional review time beyond that specified
in Subsection 105.25(b)(2) for OSA review. Typically, FEMA reviews take 75 calendar
days, but could take longer based on FEMA commitments to regional events.
13. NOTICE TO BIDDERS - SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 4
14. NOTICE TO BIDDERS - ENVIRONMENTAL COMMITMENTS.
(a) Invasive Material (REGM 2336 only). If invasive species are delineated on the Plans or
found in the project area and confirmed by the Engineer, the invasive species, and any soil
excavated from areas that contained the invasive species, will be termed invasive material.
The Contractor shall handle the invasive material in accordance with the VTrans State
Highway System Roadside Terrestrial Invasive Plants Best Management Practices
(BMPs). The Contractor shall stockpile the invasive material separately from other soil
stockpile areas. A ground barrier and perimeter containment system shall be in place
around the area intended for stockpiling the invasive material. Equipment shall be cleaned
of all soil and plant matter prior to arriving on site in accordance with Subsection 107.06.
The equipment used for excavation and transport of invasive material shall be cleaned of
all soil and plant matter before being used for work in other areas in accordance with the
BMPs.
To the extent possible, invasive material shall be reused on site. Invasive material shall
only be reused on site in areas where the presence of the invasive species were clearly
evident. If there is an excess of invasive material, it shall be wasted in accordance with the
BMPs.
The cost of excavating invasive material will be paid for under the appropriate Contract
excavation items. When invasive species are delineated on the Plans, the additional cost
for handling invasive material, following the BMPs, cleaning equipment, and wasting
excess invasive material will be incidental to all other Contract items. When invasive
species are not delineated on the Plans, and compensation is not otherwise provided for in
the Contract, the work of handling invasive material, following the BMPs, cleaning
equipment, and wasting excess invasive material will be considered extra work in
accordance with Subsection 104.03 and will be paid for in accordance with Subsection
109.06.
(b) Endangered Species Act: VTrans and/ or the contractor must not engage in tree removal
activities within the project area during endangered bat pup season between June 1 and
August 15 of any given year. Should the scope of work, as presented, change (e.g., location,
footprint, function, size), the new scope of work must be approved by the State and FEMA
and requires additional EHP review for compliance for the ESA-listed northern longeared
bat (NLEB) and Tricolored Bat (TCB) before work commences.
(c) National Historic Preservation Act (artifacts). Stop Work if archaeological deposits (for
example Indian pottery, stone tools, shell, old house foundations, old bottles) are
found/uncovered during construction. VTrans and/ or the contractor must immediately stop
all work in the vicinity of the find, take reasonable measures to avoid or minimize harm to
the finds, secure all archaeological finds (without removing them), and restrict access to
the area of the find. VTrans and/ or the contractor must immediately report the
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 5
archaeological discovery to the State Emergency Management Agency and the FEMA
Regional Environmental Officer Mary Shanks, 617-901-2204. FEMA will determine the
next steps.
(d) National Historic Preservation Act (human remains). Stop Work if human remains are
discovered. VTrans and/ or the contractor must immediately stop all work in the vicinity
of the discovery and take reasonable measures to avoid or minimize harm to the remains,
project all human remains discoveries, and restrict access to discovery sites. VTrans and/
or the contractor must follow all state laws associated with the discovery of human remains,
including immediately notifying the proper authorities. Violation of state law will
jeopardize FEMA funding for this project. VTrans and/ or the contractor will inform the
Office of the Chief Medical Examiner, the State Archaeologist, the State Emergency
Management Agency, and the FEMA Regional Environmental Officer Mary Shanks, 617-
901-2204. FEMA will consult with the SHPO and Tribes, if remains are of tribal origin.
Work in the vicinity of the discovery(s) may not resumeuntil consultation is completed and
appropriate measures have been taken to ensure that the project is compliant with the
National Historic Preservation Act and the Native American Graves Protection and
Repatriation Act.
(e) National Historic Preservation Act (staging and access). Staging of equipment and
materials and temporary access routes including, but not limited to, routes between staging
and work areas shall take place on existing hardened surfaces such as paved or gravel
roadways or parking lots. If additional staging areas or access routes are to be established
on non-hardened surfaces, VTrans and/ or the contractor must notify FEMA prior to
construction or use. FEMA must review the staging area(s) and/or access route(s) for
compliance with all applicable federal environmental planning and historic preservation
laws and executive orders. Non-compliance with this requirement may jeopardize receipt
of federal funding. Documentation in the form of photographs showing the staging and
temporary and permanent access areas in use and shortly after construction is complete is
required at closeout.
(f) National Historic Preservation Act (borrow sources): All borrow or fill material must come
from pre-existing stockpiles, material reclaimed from maintained roadside ditches
(provided the designed width or depth of the ditch is not increased), or commercially
procured material from a source existing prior to the event. For any FEMA-funded project
requiring the use of a non-commercial source or a commercial source that was not
permitted to operate prior to the event (e.g., a new pit, agricultural fields, road ROWs, etc.)
in whole or in part, regardless of cost, VTrans and/ or the contractor must notify FEMA
and VEM prior to extracting material. FEMA must review the source for compliance with
all applicable federal environmental planning and historic preservation laws and executive
orders prior to VTrans and/ or the contractor commencing borrow extraction. Consultation
and regulatory permitting may be required. Non-compliance with this requirement may
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 6
jeopardize receipt of federal funding. Documentation of borrow sources utilized is required
at closeout.
(g) Archaeology: If ground disturbing activities occur during construction, VTrans and/ or the
contractor will monitor ground disturbance and if any potential archeological resources are
discovered, will immediately cease construction in that area and notify the State and
FEMA.
15. NOTICE TO BIDDERS - UTILITIES. Utility investigation revealed no known underground or
aerial facilities within the project limits. The Contractor is cautioned to protect facilities from
damage if they are encountered.
The Contractor is advised that exploratory excavation to locate existing underground facilities may
be necessary to protect these facilities from damage. Where approved by the Engineer, these
utilities shall be located and/or exposed by methods such as air/vacuum excavation and/or hand
digging to determine their exact location. This exploratory work shall be classified as Trench
Excavation of Earth, Exploratory and payment shall be through Pay Item 204.2200, Trench
Excavation of Earth, Exploratory (N.A.B.I.).
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09 Cooperation Between Utilities.
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor's
responsibility to check with the towns prior to excavation and it shall protect and restore any
utilities damaged within the project limits as set forth in Subsection 107.12 Protection and
Restoration of Utilities and Services.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 7
16. NOTICE TO BIDDERS - RAILROAD SPECIAL PROVISIONS.
(a) Indemnification; Railroad Protective Liability Insurance. All Contractors hired by the State
pursuant to this Agreement to indemnify and save harmless the Operating Railroad, the
State, their successors and assigns, and their agents and employees, against all loss, cost,
damage and expense, including (but not limited to) damage to Operating Railroad property,
or the property of others, injury or death to Operating Railroad employees or to others due
directly in any way to the work done by the Contractor while working within or adjacent
to the railroad right-of---way during the construction of this Project, as covered by this
Agreement. In this connection, the State will require its Contractors to secure policies of
insurance in the name of the Operating Railroad and the State providing railroad protective
liability coverages of $2,000,000.00 per occurrence and $6,000,000.00 in the aggregate, or
such maximum amount as specified by 23 C.F.R. Part 646 ("Railroads"), Subpart A
("Railroad-Highway Insurance Protection") as specified in Subsection 103.04(d) of the
latest edition of the Vermont Agency of Transportation's Standard Specifications for
Construction in effect on the date of the advertisement for bids. Named insured shall be
the Operating Railroad and the State of Vermont.
(b) Additional Insurance. All Contractors hired by the State pursuant to this Agreement shall
secure Contractor's Liability Protection Insurance providing bodily injury liability
coverage that meets or exceeds the minimum amounts as specified in Subsection 103.04(b)
of the latest edition of the Vermont Agency of Transportation's Standard Specifications
for Construction in effect on the date of the advertisement for bids.
(c) General Statement of Conditions Causing Railroad Hazards.
(1) Scope. Provisions for safeguards to the property and operations of Railroad during
construction by the State's Contractor.
(2) General. The Contractor shall meet all requirements as specified in Section 632 and
Subsection 104.04(b) of the latest edition of the Vermont Agency of
Transportation's Standard Specifications for Construction in effect on the date of
the advertisement for bids.
The Contractor shall reimburse the Railroad for all necessary flagging and
inspection services required by these specifications. Final settlement with the
Contractor shall be contingent on certification that the Railroad has been
reimbursed.
The Contractor will install, maintain and remove any temporary crossings, if
required, at the expense of the Contractor.
| Type of Delay | Description | Damages |
|---|---|---|
| Initial | Each delay that does not exceed a maximum duration of five minutes per train | $4,000.00 |
| Incremental | Each additional delay that extends beyond five minutes to 20 minutes per train | $2,000.00 |
| Successive | Each additional 15-minute period of time delay per train | $1,500.00 |
| Example of Liquidated Damages for a 65-minute Delay | ||
|---|---|---|
| Minutes of Delay | Added Cost | Total Time Past Work Window |
| First 5 minutes | $4,000.00 | 5 minutes |
| First 20 minutes | $2,000.00 | 20 minutes |
| An additional 15 minutes | $1,500.00 | 35 minutes (20+15) |
| An additional 15 minutes | $1,500.00 | 50 minutes (35+15) |
| An additional 15 minutes | $1,500.00 | 65 minutes (50+15) |
| $10,500.00 | Total for a 65-minute delay |
Rockingham REGM2336; Rockingham REGM2337 Advertised October 14, 2026
Special Provisions Part I - Notice to Bidders Page 8
(3) Train Delays/Liquidated Damages. The Contractor shall pay liquidated damages to
the Operating Railroad as specified in Section 199 of the latest edition of the
Vermont Agency of Transportation's Standard Specifications for Construction in
effect on the date of the advertisement for bids. The Operating Railroad shall notify
the Engineer immediately if a train delay has occurred. The Operating Railroad
shall contact the Engineer in writing within 24 hours of the delay occurring to begin
the delay documentation process. If VTrans notes a delay and the Operating
Railroad has not begun the documentation process, the Engineer will contact the
Rail Director to initiate the documentation process. The Engineer will work with
the Operating Railroad to verify the duration and details of the delay. The Operating
Railroad shall, within thirty (30) calendar days of the delay, provide the Engineer
an invoice addressed to the Agency outlining the details of the delay. After the
documentation is received and approved for payment, the Engineer will initiate the
payment process in the next biweekly estimate. The amount owed to the Operating
Railroad will be deducted from the amount due to the Contractor from the State and
will be paid to the Operating Railroad within 30 calendar days after the delay
documentation has been finalized.
TABLE 1 - RAILROAD DELAY PENALTIES
Type of Delay Description Damages
Each delay that does not exceed a
Initial $4,000.00
maximum duration of five minutes per train
Each additional delay that extends beyond
Incremental $2,000.00
five minutes to 20 minutes per train
Each additional 15-minute period of time
Successive $1,500.00
delay per train
TABLE 2 - EXAMPLE LIQUIDATED DAMAGES CALCULATION
Example of Liquidated Damages for a 65-minute Delay
Minutes of Delay Added Cost Total Time Past Work Window
First 5 minutes $4,000.00 5 minutes
First 20 minutes $2,000.00 20 minutes
An additional 15
$1,500.00 35 minutes (20+15)
minutes
An additional 15
$1,500.00 50 minutes (35+15)
minutes
An additional 15
$1,500.00 65 minutes (50+15)
minutes
$10,500.00 Total for a 65-minute delay

With GovernmentContracts, you can:
Burlington-Winooski BF RAIZ (2) & Burlington STP 5000(29) Request for Proposal Request Date:
State Government of Vermont
Bid Due: 4/02/2027
Statewide DBOOM EVSE RFP Request Date: 9/17/2026 3:12:33 PM Open Date: 9/15/2026 Closing
State Government of Vermont
Bid Due: 11/17/2026
Waitsfield Community Wastewater System Contract 2 Request Date: 11/13/2026 10:03:57 AM Open Date:
State Government of Vermont
Bid Due: 12/23/2026
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER RFP 146 DMH
State of Vermont
Bid Due: 12/15/2026