| Location: | Idaho |
|---|---|
| Posted: | Aug 6, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | Ada County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BID 26059 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work to be included in the Construction Contract is generally described as the removal of the existing landscape berm surrounding portions of the building, site re-grading to improve drainage, and redesign of the landscape and irrigation system using low-maintenance, water-efficient materials. The scope also includes sacking of concrete walls following removal of the berms, as well as rehabilitation of adjacent concrete surfaces, including the loading dock on the north side of the building. An add-alternate has been included for removal of the existing stem walls surrounding the building.

With GovernmentContracts, you can:
..., gutter, sidewalks, retaining walls, drainage improvements, irrigation and utility adjustments...
Ada County Highway District
Bid Due: 9/02/2026
...concrete, curb and gutter improvements, sidewalks, ADA accessibility improvements, drainage...
West Ada School District (WASD)
Bid Due: 9/25/2026
...drainage 2/12 pitch roof Roof loading to include acoustic ceilings and large circulation ...
Blackfoot city
Bid Due: 9/11/2026