CITY OF TRINIDAD

SCOPE OF WORK

COMMERCIAL KITCHEN REMODEL

Space to Create – 218 W. Main St., Trinidad, Colorado 81082

1. PROJECT OVERVIEW

The City of Trinidad is requesting qualified contractors to provide all labor, materials, equipment, and related services necessary to complete modifications and improvements to the existing commercial kitchen located at Space to Create, 218 W. Main St., Trinidad, Colorado.

The project includes relocating existing kitchen equipment and fixtures, modifying plumbing and gas connections, installing an 8 ft. x 16 ft. walk-in cooler/freezer combination with a single walk-through door and intelligent control system, and replacing the existing water heater with a new commercial electric water heater.

2. SCOPE OF WORK

A. Ice Machine Relocation
  • Relocate the existing ice machine to the location designated by the City.
  • Relocate of second ice machine to tourism room
  • Disconnect and reconnect necessary water supply and drain connections.
  • Modify or extend plumbing as required for the new location.
  • Ensure all connections are properly secured and free of leaks.
  • Reconnect the ice machine and verify proper operation.
  • Coordinate work to minimize disruption to the existing kitchen.
B. Sink Relocation
  • Relocate the existing commercial kitchen sink to the location designated by the City.
  • Disconnect existing plumbing connections.
  • Modify and extend hot and cold water supply lines as required.
  • Modify waste and drain piping to accommodate the new sink location.
  • Provide required shutoff valves and accessible connections.
  • Reconnect the sink and verify proper drainage and operation.
  • Seal penetrations and connections as required.
C. Dishwasher Relocation
  • Relocate the existing dishwasher to accommodate the revised kitchen layout.
  • Disconnect existing water, drain, and electrical connections, as applicable.
  • Modify or extend water supply and drain lines as required.
  • Reconnect the dishwasher and verify proper operation.
  • Coordinate the relocation with the sink and existing plumbing configuration.
D. Gas Line Extension
  • Extend the existing gas line to serve the relocated or repositioned kitchen equipment, as designated by the City.
  • Provide properly sized gas piping, fittings, shutoff valves, supports, and associated components necessary for a complete installation.
  • Have gas work performed by properly qualified or licensed personnel as required by applicable codes.
  • Test the gas piping and connections for leaks and proper operation.
  • Coordinate required inspections with the City and applicable authorities having jurisdiction.
  • Do not alter existing gas equipment beyond what is necessary to complete the project without prior written City approval.
E. Walk-In Cooler/Freezer Combination Installation
The contractor shall furnish and install a new 8 ft. x 16 ft. walk-in cooler/freezer combination at the location designated by the City.
Installation shall include:
  • Provide and install the walk-in cooler/freezer combination suitable for commercial kitchen use.
  • Provide insulated panels, ceiling panels, flooring where required, and associated components necessary for a complete enclosure.
  • Provide and install one single walk-through door, including frame, hardware, seals, and required safety features.
  • Provide an intelligent control system appropriate for the cooler/freezer combination, including temperature monitoring and control for the designated refrigerated and frozen compartments.
  • Provide the necessary refrigeration equipment, evaporators, condensers, controls, piping, and accessories required for a complete and operational system.
  • Provide required electrical connections and coordinate utility requirements with the City before installation.
  • Provide appropriate insulation, vapor sealing, door gaskets, and other components necessary to maintain required operating temperatures.
  • Assemble, seal, secure, test, and commission the system.
  • Test refrigeration operation, temperature controls, door operation, and installed components before acceptance.
  • Provide the City with operating instructions, control-system instructions, and available manufacturer warranties.
The contractor shall verify installation dimensions, access, electrical requirements, and equipment specifications before ordering materials or beginning installation.
Any necessary structural, electrical, plumbing, or other building modifications outside the stated scope must receive prior written City approval.
F. Commercial Electric Water Heater Replacement
The contractor shall remove and replace the existing water heater with a new commercial electric water heater suitable for the demands of the commercial kitchen.
Work shall include:
  • Disconnect and remove the existing water heater.
  • Properly dispose of the removed equipment.
  • Furnish and install a new commercial-grade electric water heater of appropriate capacity for the kitchen's anticipated hot-water demand.
  • Verify tank capacity, voltage, amperage, recovery rate, and electrical service requirements before ordering equipment.
  • Modify or extend hot and cold water supply piping as necessary.
  • Provide required shutoff valves, fittings, connectors, supports, and other plumbing components.
  • Provide or modify the electrical circuit, disconnect, wiring, and overcurrent protection as required for the new equipment.
  • Provide required temperature and pressure relief protection, discharge piping, expansion control, and other safety components as required by applicable codes and manufacturer instructions.
  • Provide a drain pan and drainage provisions where required.
  • Ensure the installation meets applicable plumbing, electrical, and safety requirements.
  • Fill and test the unit, verify proper operation, and inspect connections for leaks.
  • Verify the unit heats water to the intended operating temperature and safety devices function properly.
  • Coordinate required permits and inspections with the City.
  • Provide operating instructions and available manufacturer warranties.
The contractor shall verify the existing electrical service and hot-water demand before selecting the replacement unit. Required electrical service upgrades or significant building modifications must be submitted to the City for written approval before proceeding.
G. Gate Construction and Installation
The contractor shall provide all labor, materials, equipment, and installation services necessary to construct and install a gate measuring approximately 47 inch wide by 7 feet high at the location designated by the City of Trinidad.
Work shall include:
  • Verify the proposed gate location and field measurements with City staff before construction.
  • Furnish and install a gate measuring approximately 47 inch in width and 7 feet in height.
  • Provide all necessary gate materials, framing, supports, hardware, hinges, latches, and fastening components required for a complete installation.
  • Provide and install posts, anchors, footings, and other structural support components as necessary for the gate design and site conditions.
  • Ensure the gate is properly aligned, securely supported, and operates as intended.
  • Provide a durable construction suitable for the intended use and exposure to local weather conditions.
  • Coordinate the gate design, material selection, finish, and operation with the City before ordering materials or beginning construction.
  • Protect adjacent buildings, pavement, landscaping, utilities, and other existing improvements during construction.
  • Remove construction debris and leave the work area clean upon completion.
The contractor shall identify the proposed gate material, construction method, hardware, and any applicable coating or finish in the bid. Any required permits or inspections shall be identified and included in the pricing.
No changes to the approved gate dimensions, design, or location shall be made without prior written approval from the City of Trinidad.
H. Painting – Seating Area and Bar Area
The contractor shall provide all labor, materials, equipment, and services necessary to paint the designated seating area and bar area at Space to Create, 218 W. Main St., Trinidad, Colorado.
Work shall include:
  • Prepare surfaces as necessary for proper paint application, including cleaning, minor surface preparation, and patching of small imperfections.
  • Protect existing floors, furniture, fixtures, bar surfaces, and other areas not intended to be painted.
  • Furnish and apply appropriate paint to the seating area and bar area.
  • Apply primer where necessary and sufficient coats of paint to provide a uniform, complete finish.
  • The paint color will be specified by the City of Trinidad and provided to contractors during the mandatory walk-through.
  • Coordinate the painting schedule with City staff to minimize disruption to other project work.
  • Clean the work area and remove paint-related debris upon completion.
The contractor shall include all labor, paint, supplies, preparation, and cleanup in the bid price.
I. Existing Floor Tile Replacement
The contractor shall provide all labor, materials, equipment, and services necessary to remove and replace the existing floor tile in the designated project area.
Work shall include:
  • Remove the existing floor tile in the area identified by the City.
  • Properly dispose of removed tile and associated construction debris.
  • Inspect the exposed floor substrate and notify the City of any damaged or unsuitable conditions before proceeding with repairs.
  • Prepare the floor substrate as necessary for installation of the replacement tile.
  • Furnish and install new floor tile using appropriate setting materials, grout, and installation methods suitable for the intended commercial kitchen environment.
  • Install tile in accordance with manufacturer recommendations and applicable codes.
  • Provide consistent spacing, proper alignment, and a professional finished appearance.
  • Complete grouting, sealing where required, and finishing at edges and transitions.
  • Protect adjacent surfaces and existing fixtures during construction.
  • Clean the newly tiled floor and remove all construction debris upon completion.
The replacement tile will be specified by the City of Trinidad and provided to contractors during the mandatory walk-through.
The contractor shall verify the project area and quantities before submitting a bid. Any necessary substrate repairs beyond normal tile preparation shall be documented and approved by the City before additional work is performed.

3. GENERAL REQUIREMENTS

The contractor shall:

  • Verify all existing field conditions and dimensions before beginning work.
  • Coordinate work with City staff before disconnecting existing equipment or utilities.
  • Protect existing floors, walls, cabinets, appliances, and other building components from damage.
  • Maintain a clean and safe work area throughout construction.
  • Remove construction debris and dispose of it properly upon completion.
  • Patch and repair minor openings or penetrations created by the contractor.
  • Properly secure and support all new plumbing, gas, electrical, and refrigeration installations.
  • Obtain required permits and coordinate required inspections.
  • Test all relocated equipment and new installations before final completion.
  • Restore the work area to a clean, safe, and functional condition.
4. CODE COMPLIANCE

All work shall comply with applicable City of Trinidad requirements and currently adopted building, plumbing, mechanical, fuel gas, electrical, fire, energy, and life-safety codes, as applicable to the project.

Work requiring licensed or qualified tradespersons shall be performed by personnel meeting applicable requirements.

Any discrepancies between existing conditions and the proposed scope shall be brought to the City's attention before proceeding.

5. COORDINATION

The contractor shall coordinate the sequence of work so that kitchen equipment and utilities are disconnected only when necessary.

The final locations of the ice machine, sink, dishwasher, gas connection, walk-in cooler/freezer combination, and commercial electric water heater shall be coordinated with and approved by the City before installation.

The contractor shall verify equipment dimensions, utility connections, clearances, and access requirements before ordering or installing equipment.

No significant changes to the scope, layout, or specified equipment shall be made without prior written approval from the City of Trinidad.

6. COMPLETION AND ACCEPTANCE

Upon completion, the contractor shall:

  1. Verify all plumbing connections are leak-free.
  2. Verify proper drainage from the sink and dishwasher.
  3. Verify proper water supply to relocated equipment.
  4. Verify the gas piping and connections are leak-free and operational.
  5. Verify the relocated ice machine and dishwasher function properly.
  6. Verify the walk-in cooler/freezer combination is operational and the intelligent control system functions as intended.
  7. Verify the walk-through door, seals, hardware, and safety features operate properly.
  8. Verify the commercial electric water heater operates properly, heats water as intended, and has no leaking connections.
  9. Complete all required testing and inspections.
  10. Remove construction debris and clean the work area.
  11. Provide available equipment manuals, operating instructions, and manufacturer warranties to the City.
  12. Notify the City when the project is ready for final inspection.
7. CONTRACTOR BID

The contractor shall provide a lump-sum price for the complete scope of work, including:

  • Labor and materials
  • Equipment and installation
  • Ice machine, sink, and dishwasher relocation
  • Plumbing modifications
  • Gas line extension
  • Walk-in cooler/freezer combination, including the single walk-through door and intelligent control system
  • Commercial electric water heater and replacement installation
  • Required electrical, plumbing, gas, and refrigeration connections
  • Permits and inspection fees, if applicable
  • Equipment testing and commissioning
  • Cleanup and disposal
  • All incidental work necessary for a complete and functional installation

Contractors shall identify the manufacturer, model, capacity, warranty, and relevant specifications for the proposed walk-in cooler/freezer combination and commercial electric water heater.
Any proposed exclusions or additional costs shall be clearly identified in the bid.

8. EXCLUSIONS AND CHANGE ORDERS

Any work not specifically identified in this Scope of Work shall require prior written authorization from the City of Trinidad before additional work is performed.
Unexpected concealed conditions discovered during construction shall be documented and reported to the City before corrective work is undertaken.
No additional work or charges shall be authorized without written approval from the City.

9. PROJECT LOCATION

Space to Create
218 W. Main St.
Trinidad, Colorado 81082

Owner: City of Trinidad

City Contact:
Tara Booth, Planning Assistant
City of Trinidad
135 N. Animas St.
Trinidad, CO 81082
719-846-9843 ext. 136
tara.booth@trinidad.co.gov

10. CONTRACTOR PRICING BREAKDOWN

Contractors shall provide an itemized pricing breakdown for the work described in this Scope of Work. Pricing shall include all labor, materials, equipment, installation, applicable permits, inspections, and other costs necessary to complete each item.

Item

Description of Work

Bid Amount

1

Ice machine relocation, including plumbing connections

$____________

2

Commercial kitchen sink relocation, including water and drain modifications

$____________

3

Dishwasher relocation, including water, drain, and applicable electrical connections

$____________

4

Gas line extension, including piping, fittings, valves, and testing

$____________

5

Walk-in cooler/freezer combination, 8 ft. x 16 ft., including single walk-through door, intelligent control system, refrigeration equipment, and installation

$____________

6

Commercial electric water heater, including equipment, removal of existing unit, installation, plumbing connections, and required electrical work

$____________

7

Additional plumbing, electrical, gas, or refrigeration work necessary for the specified installations

$____________

8

Permits, inspection fees, testing, and commissioning not included above

$____________

9

Cleanup, debris removal, and disposal

$____________

10

Construct and install gate approximately 47 ft. wide x 7 ft. high, including materials, framing, posts, supports, hardware, installation, and cleanup

$____________

11

Paint designated seating area and bar area, including surface preparation, materials, application, and cleanup. Color to be specified at walk-through.

$____________

12

Remove existing floor tile and furnish and install replacement tile, including substrate preparation, setting materials, grout, finishing, and disposal. Tile to be specified at walk-through.

$____________

Subtotal

TOTAL LUMP-SUM BID

$____________


Additional Pricing Requirements

  1. All pricing shall be in U.S. dollars.
  2. Contractors shall clearly identify any exclusions, allowances, assumptions, or costs not included in the pricing breakdown.
  3. Contractors shall identify the proposed manufacturer, model, capacity, and warranty for the walk-in cooler/freezer combination and commercial electric water heater.
  4. Any proposed alternate equipment or substitutions shall be identified separately and require prior written City approval.
  5. The total lump-sum bid shall include all work necessary to provide a complete, functional installation in accordance with this Scope of Work.
  6. Any unforeseen work or additional charges shall require prior written authorization from the City of Trinidad before the work is performed.
BID SCHEDULE

Project: Commercial Kitchen Remodel
Location: Space to Create, 218 W. Main St., Trinidad, Colorado 81082

  • Mandatory Walk-Through: November 12, 2026, at 9:00 a.m.
  • Bid Submission Deadline: November 23, 2026, at 2:00 p.m.

Contractors must attend the mandatory walk-through to review the project site, verify existing conditions, review the required work, and receive the City-specified paint color and replacement floor tile information.

Bids must be submitted to the City of Trinidad by the deadline listed above. Late submissions may not be accepted.

City Contact:
Tara Booth, Planning Assistant
City of Trinidad
135 N. Animas St.
Trinidad, CO 81082
Phone: 719-846-9843 ext. 136
Email: tara.booth@trinidad.co.gov

Bid document

Attachment Preview

135 N. Animas Street
Trinidad, CO 81082
(719) 846-9843
CITY OF TRINIDAD
SCOPE OF WORK
COMMERCIAL KITCHEN REMODEL
Space to Create - 218 W. Main St., Trinidad, Colorado 81082
1. PROJECT OVERVIEW
The City of Trinidad is requesting qualified contractors to provide all labor, materials,
equipment, and related services necessary to complete modifications and improvements
to the existing commercial kitchen located at Space to Create, 218 W. Main St., Trinidad,
Colorado.
The project includes relocating existing kitchen equipment and fixtures, modifying
plumbing and gas connections, installing an 8 ft. x 16 ft. walk-in cooler/freezer
combination with a single walk-through door and intelligent control system, and
replacing the existing water heater with a new commercial electric water heater.
2. SCOPE OF WORK
A. Ice Machine Relocation
* Relocate the existing ice machine to the location designated by the City.
* Relocate of second ice machine to tourism room
* Disconnect and reconnect necessary water supply and drain connections.
* Modify or extend plumbing as required for the new location.
* Ensure all connections are properly secured and free of leaks.
* Reconnect the ice machine and verify proper operation.
* Coordinate work to minimize disruption to the existing kitchen.
B. Sink Relocation
* Relocate the existing commercial kitchen sink to the location designated by the
City.
* Disconnect existing plumbing connections.
* Modify and extend hot and cold water supply lines as required.
* Modify waste and drain piping to accommodate the new sink location.
Celebrating America's 250 ~ Colorado's 150 ~ Trinidad's 150

*
* Provide required shutoff valves and accessible connections.
* Reconnect the sink and verify proper drainage and operation.
* Seal penetrations and connections as required.
C. Dishwasher Relocation
* Relocate the existing dishwasher to accommodate the revised kitchen layout.
* Disconnect existing water, drain, and electrical connections, as applicable.
* Modify or extend water supply and drain lines as required.
* Reconnect the dishwasher and verify proper operation.
* Coordinate the relocation with the sink and existing plumbing configuration.
D. Gas Line Extension
* Extend the existing gas line to serve the relocated or repositioned kitchen
equipment, as designated by the City.
* Provide properly sized gas piping, fittings, shutoff valves, supports, and
associated components necessary for a complete installation.
* Have gas work performed by properly qualified or licensed personnel as required
by applicable codes.
* Test the gas piping and connections for leaks and proper operation.
* Coordinate required inspections with the City and applicable authorities having
jurisdiction.
* Do not alter existing gas equipment beyond what is necessary to complete the
project without prior written City approval.
E. Walk-In Cooler/Freezer Combination Installation
The contractor shall furnish and install a new 8 ft. x 16 ft. walk-in cooler/freezer
combination at the location designated by the City.
Installation shall include:
* Provide and install the walk-in cooler/freezer combination suitable for
commercial kitchen use.
* Provide insulated panels, ceiling panels, flooring where required, and associated
components necessary for a complete enclosure.
* Provide and install one single walk-through door, including frame, hardware,
seals, and required safety features.
* Provide an intelligent control system appropriate for the cooler/freezer
combination, including temperature monitoring and control for the designated
refrigerated and frozen compartments.
* Provide the necessary refrigeration equipment, evaporators, condensers,
controls, piping, and accessories required for a complete and operational system.
* Provide required electrical connections and coordinate utility requirements with
the City before installation.
* Provide appropriate insulation, vapor sealing, door gaskets, and other
components necessary to maintain required operating temperatures.
* Assemble, seal, secure, test, and commission the system.
* Test refrigeration operation, temperature controls, door operation, and installed
components before acceptance.

135 N. Animas Street
Trinidad, CO 81082
(719) 846-9843
* Provide the City with operating instructions, control-system instructions, and
available manufacturer warranties.
The contractor shall verify installation dimensions, access, electrical requirements, and
equipment specifications before ordering materials or beginning installation.
Any necessary structural, electrical, plumbing, or other building modifications outside
the stated scope must receive prior written City approval.
F. Commercial Electric Water Heater Replacement
The contractor shall remove and replace the existing water heater with a new
commercial electric water heater suitable for the demands of the commercial kitchen.
Work shall include:
* Disconnect and remove the existing water heater.
* Properly dispose of the removed equipment.
* Furnish and install a new commercial-grade electric water heater of appropriate
capacity for the kitchen's anticipated hot-water demand.
* Verify tank capacity, voltage, amperage, recovery rate, and electrical service
requirements before ordering equipment.
* Modify or extend hot and cold water supply piping as necessary.
* Provide required shutoff valves, fittings, connectors, supports, and other
plumbing components.
* Provide or modify the electrical circuit, disconnect, wiring, and overcurrent
protection as required for the new equipment.
* Provide required temperature and pressure relief protection, discharge piping,
expansion control, and other safety components as required by applicable codes
and manufacturer instructions.
* Provide a drain pan and drainage provisions where required.
* Ensure the installation meets applicable plumbing, electrical, and safety
requirements.
* Fill and test the unit, verify proper operation, and inspect connections for leaks.
* Verify the unit heats water to the intended operating temperature and safety
devices function properly.
* Coordinate required permits and inspections with the City.
* Provide operating instructions and available manufacturer warranties.
Celebrating America's 250 ~ Colorado's 150 ~ Trinidad's 150

The contractor shall verify the existing electrical service and hot-water demand before
selecting the replacement unit. Required electrical service upgrades or significant
building modifications must be submitted to the City for written approval before
proceeding.
G. Gate Construction and Installation
The contractor shall provide all labor, materials, equipment, and installation services
necessary to construct and install a gate measuring approximately 47 inch wide by 7
feet high at the location designated by the City of Trinidad.
Work shall include:
* Verify the proposed gate location and field measurements with City staff before
construction.
* Furnish and install a gate measuring approximately 47 inch in width and 7 feet in
height.
* Provide all necessary gate materials, framing, supports, hardware, hinges,
latches, and fastening components required for a complete installation.
* Provide and install posts, anchors, footings, and other structural support
components as necessary for the gate design and site conditions.
* Ensure the gate is properly aligned, securely supported, and operates as
intended.
* Provide a durable construction suitable for the intended use and exposure to local
weather conditions.
* Coordinate the gate design, material selection, finish, and operation with the City
before ordering materials or beginning construction.
* Protect adjacent buildings, pavement, landscaping, utilities, and other existing
improvements during construction.
* Remove construction debris and leave the work area clean upon completion.
The contractor shall identify the proposed gate material, construction method,
hardware, and any applicable coating or finish in the bid. Any required permits or
inspections shall be identified and included in the pricing.
No changes to the approved gate dimensions, design, or location shall be made without
prior written approval from the City of Trinidad.
H. Painting - Seating Area and Bar Area
The contractor shall provide all labor, materials, equipment, and services necessary to
paint the designated seating area and bar area at Space to Create, 218 W. Main St.,
Trinidad, Colorado.
Work shall include:
* Prepare surfaces as necessary for proper paint application, including cleaning,
minor surface preparation, and patching of small imperfections.
* Protect existing floors, furniture, fixtures, bar surfaces, and other areas not
intended to be painted.
* Furnish and apply appropriate paint to the seating area and bar area.

135 N. Animas Street
Trinidad, CO 81082
(719) 846-9843
* Apply primer where necessary and sufficient coats of paint to provide a uniform,
complete finish.
* The paint color will be specified by the City of Trinidad and provided to
contractors during the mandatory walk-through.
* Coordinate the painting schedule with City staff to minimize disruption to other
project work.
* Clean the work area and remove paint-related debris upon completion.
The contractor shall include all labor, paint, supplies, preparation, and cleanup in the
bid price.
I. Existing Floor Tile Replacement
The contractor shall provide all labor, materials, equipment, and services necessary to
remove and replace the existing floor tile in the designated project area.
Work shall include:
* Remove the existing floor tile in the area identified by the City.
* Properly dispose of removed tile and associated construction debris.
* Inspect the exposed floor substrate and notify the City of any damaged or
unsuitable conditions before proceeding with repairs.
* Prepare the floor substrate as necessary for installation of the replacement tile.
* Furnish and install new floor tile using appropriate setting materials, grout, and
installation methods suitable for the intended commercial kitchen environment.
* Install tile in accordance with manufacturer recommendations and applicable
codes.
* Provide consistent spacing, proper alignment, and a professional finished
appearance.
* Complete grouting, sealing where required, and finishing at edges and
transitions.
* Protect adjacent surfaces and existing fixtures during construction.
* Clean the newly tiled floor and remove all construction debris upon completion.
The replacement tile will be specified by the City of Trinidad and provided to contractors
during the mandatory walk-through.
The contractor shall verify the project area and quantities before submitting a bid. Any
necessary substrate repairs beyond normal tile preparation shall be documented and
approved by the City before additional work is performed.
Celebrating America's 250 ~ Colorado's 150 ~ Trinidad's 150

3. GENERAL REQUIREMENTS
The contractor shall:
* Verify all existing field conditions and dimensions before beginning work.
* Coordinate work with City staff before disconnecting existing equipment or
utilities.
* Protect existing floors, walls, cabinets, appliances, and other building
components from damage.
* Maintain a clean and safe work area throughout construction.
* Remove construction debris and dispose of it properly upon completion.
* Patch and repair minor openings or penetrations created by the contractor.
* Properly secure and support all new plumbing, gas, electrical, and refrigeration
installations.
* Obtain required permits and coordinate required inspections.
* Test all relocated equipment and new installations before final completion.
* Restore the work area to a clean, safe, and functional condition.
4. CODE COMPLIANCE
All work shall comply with applicable City of Trinidad requirements and currently
adopted building, plumbing, mechanical, fuel gas, electrical, fire, energy, and life-safety
codes, as applicable to the project.
Work requiring licensed or qualified tradespersons shall be performed by personnel
meeting applicable requirements.
Any discrepancies between existing conditions and the proposed scope shall be brought
to the City's attention before proceeding.
5. COORDINATION
The contractor shall coordinate the sequence of work so that kitchen equipment and
utilities are disconnected only when necessary.
The final locations of the ice machine, sink, dishwasher, gas connection, walk-in
cooler/freezer combination, and commercial electric water heater shall be coordinated
with and approved by the City before installation.
The contractor shall verify equipment dimensions, utility connections, clearances, and
access requirements before ordering or installing equipment.
No significant changes to the scope, layout, or specified equipment shall be made
without prior written approval from the City of Trinidad.
6. COMPLETION AND ACCEPTANCE
Upon completion, the contractor shall:
1. Verify all plumbing connections are leak-free.

135 N. Animas Street
Trinidad, CO 81082
(719) 846-9843
2. Verify proper drainage from the sink and dishwasher.
3. Verify proper water supply to relocated equipment.
4. Verify the gas piping and connections are leak-free and operational.
5. Verify the relocated ice machine and dishwasher function properly.
6. Verify the walk-in cooler/freezer combination is operational and the intelligent
control system functions as intended.
7. Verify the walk-through door, seals, hardware, and safety features operate
properly.
8. Verify the commercial electric water heater operates properly, heats water as
intended, and has no leaking connections.
9. Complete all required testing and inspections.
10. Remove construction debris and clean the work area.
11. Provide available equipment manuals, operating instructions, and manufacturer
warranties to the City.
12. Notify the City when the project is ready for final inspection.
7. CONTRACTOR BID
The contractor shall provide a lump-sum price for the complete scope of work,
including:
* Labor and materials
* Equipment and installation
* Ice machine, sink, and dishwasher relocation
* Plumbing modifications
* Gas line extension
* Walk-in cooler/freezer combination, including the single walk-through door and
intelligent control system
* Commercial electric water heater and replacement installation
* Required electrical, plumbing, gas, and refrigeration connections
* Permits and inspection fees, if applicable
* Equipment testing and commissioning
* Cleanup and disposal
* All incidental work necessary for a complete and functional installation
Total Lump-Sum Bid: $____________________________
Celebrating America's 250 ~ Colorado's 150 ~ Trinidad's 150

Contractors shall identify the manufacturer, model, capacity, warranty, and relevant
specifications for the proposed walk-in cooler/freezer combination and commercial
electric water heater.
Any proposed exclusions or additional costs shall be clearly identified in the bid.
8. EXCLUSIONS AND CHANGE ORDERS
Any work not specifically identified in this Scope of Work shall require prior written
authorization from the City of Trinidad before additional work is performed.
Unexpected concealed conditions discovered during construction shall be documented
and reported to the City before corrective work is undertaken.
No additional work or charges shall be authorized without written approval from the
City.
9. PROJECT LOCATION
Space to Create
218 W. Main St.
Trinidad, Colorado 81082
Owner: City of Trinidad
City Contact:
Tara Booth, Planning Assistant
City of Trinidad
135 N. Animas St.
Trinidad, CO 81082
719-846-9843 ext. 136
tara.booth@trinidad.co.gov
10. CONTRACTOR PRICING BREAKDOWN
Contractors shall provide an itemized pricing breakdown for the work described in this
Scope of Work. Pricing shall include all labor, materials, equipment, installation,
applicable permits, inspections, and other costs necessary to complete each item.
Item Description of Work Bid Amount
1 Ice machine relocation, including plumbing connections $____________
Commercial kitchen sink relocation, including water and
2 $____________
drain modifications
Dishwasher relocation, including water, drain, and
3 $____________
applicable electrical connections
Gas line extension, including piping, fittings, valves, and
4 $____________
testing

135 N. Animas Street
Trinidad, CO 81082
(719) 846-9843
Walk-in cooler/freezer combination, 8 ft. x 16 ft., including
5 single walk-through door, intelligent control system, $____________
refrigeration equipment, and installation
Commercial electric water heater, including equipment,
6 removal of existing unit, installation, plumbing connections, $____________
and required electrical work
Additional plumbing, electrical, gas, or refrigeration work
7 $____________
necessary for the specified installations
Permits, inspection fees, testing, and commissioning not
8 $____________
included above
9 C leanup, debris removal, and disposal $____________
Construct and install gate approximately 47 ft. wide x 7 ft.
10 high, including materials, framing, posts, supports, $____________
hardware, installation, and cleanup
Paint designated seating area and bar area, including
11 surface preparation, materials, application, and cleanup. $____________
Color to be specified at walk-through.
Remove existing floor tile and furnish and install
replacement tile, including substrate preparation, setting
12
materials, grout, finishing, and disposal. Tile to be specified $____________
at walk-through.
Subtotal
TOTAL LUMP-SUM BID $____________
Additional Pricing Requirements
1. All pricing shall be in U.S. dollars.
2. Contractors shall clearly identify any exclusions, allowances, assumptions, or
costs not included in the pricing breakdown.
3. Contractors shall identify the proposed manufacturer, model, capacity, and
warranty for the walk-in cooler/freezer combination and commercial electric
water heater.
4. Any proposed alternate equipment or substitutions shall be identified separately
and require prior written City approval.
5. The total lump-sum bid shall include all work necessary to provide a complete,
functional installation in accordance with this Scope of Work.
Celebrating America's 250 ~ Colorado's 150 ~ Trinidad's 150

6. Any unforeseen work or additional charges shall require prior written
authorization from the City of Trinidad before the work is performed.
BID SCHEDULE
Project: Commercial Kitchen Remodel
Location: Space to Create, 218 W. Main St., Trinidad, Colorado 81082
* Mandatory Walk-Through: November 12, 2026, at 9:00 a.m.
* Bid Submission Deadline: November 23, 2026, at 2:00 p.m.
Contractors must attend the mandatory walk-through to review the project site, verify
existing conditions, review the required work, and receive the City-specified paint color
and replacement floor tile information.
Bids must be submitted to the City of Trinidad by the deadline listed above. Late
submissions may not be accepted.
City Contact:
Tara Booth, Planning Assistant
City of Trinidad
135 N. Animas St.
Trinidad, CO 81082
Phone: 719-846-9843 ext. 136
Email: tara.booth@trinidad.co.gov
Contractor Information
Company Name: ______________________________________
Authorized Representative: ____________________________
Phone Number: _______________________________________
Email Address: _______________________________________
Signature: __________________________________________
Date: ______________________________________________

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...-Septic Pump Truck Tank Replacement Attachments/Links Contact Information Contracting Office Address 1...

INTERIOR, DEPARTMENT OF THE

Bid Due: 12/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.