| Location: | California |
|---|---|
| Posted: | May 15, 2025 |
| Due: | May 28, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Base Bid Project improvements will generally include construction to remove portions of the concrete channel walls of Corte Madera Creek downstream of Stadium Way pedestrian bridge, grading and earthwork to restore a natural creek bank, and installation of erosion and scour protection logs along the toe of the channel. Access will be through a temporary easement with the College of Marin, and work will be adjacent to the multi-use path and a residential neighborhood of Kentfield. Work within the dewatered creek channel is limited to take place between September 1st and October 15th.
See RFP - Corte Madera Creek Flood Risk Management Phase 1 Lower College Of Marin Restoration Project for full details.

With GovernmentContracts, you can:
...RFI #26-02 - Removal of In-Ground Vehicle Lifts & Concrete Slab Restoration Appendix ...
Monterey-Salinas Transit
Bid Due: 6/18/2026
...; and installation of concrete curbs and sidewalks. Additional work includes installation of ...
Sutter County
Bid Due: 7/09/2026
...concrete box culvert and retaining wall, installation of aggregate base and hot mix ...
Sutter County
Bid Due: 6/25/2026
...concrete box culvert and retaining wall, installation of aggregate base and hot mix ...
Sutter County
Bid Due: 6/25/2026