Forestry and Parks - Request for Proposal - EDSON WILDFIRE RECLAMATION…
| Location: |
Federal |
| Posted: |
Nov 1, 2024 |
| Due: |
Nov 28, 2024 |
| Agency: |
Government of Canada |
| Type of Government: |
State & Local |
| Category: |
- F - Natural Resources and Conservation Services
|
| Solicitation No: |
AB-2024-09214 |
| Publication URL: |
To access bid details, please log in. |
Description
Alberta Forestry and Parks, in its mandate to prevent and suppress wildfires within the Province is required to reclaim disturbed forest land caused by wildfire suppression operations. These sites were essential for effective wildfire operations and include fireguards, creek crossings, pipeline crossings, and helipads. Wildfire reclamation is required to prevent or reduce the potential of soil erosion and ensure soil stabilization on or near the fire line. Reclamation of disturbances also promotes the recovery of the disturbed land base for wildlife habitat (i.e. caribou) and vegetative growth. Due to soil conditions, the reclamation work must be done when the ground conditions are in a frozen state.
The Wildhay Complex consists of two wildfires; EWF-037, located at N53 54.603 W117 33.543 and EWF-040, located at N53 56.135 W117 46.570.
EWF-037 is 554.3 hectares in size. During suppression efforts, there was approximately 20 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression. To assist ground crews; 3 stream crossings, 1 pipeline crossing and 1 staging area were built and will require reclamation as well.
EWF-040 is 607.5 hectares in size. During suppression efforts, there was approximately 18 km of fireguard constructed. This involves heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression. To assist ground crews; 2 helipads, 1 stream crossing, 1 pipeline crossing and 1 staging area were built and will need reclamation as well.
Reclamation with mechanical equipment is required to recover the land base to a near natural state. The fireguard travels through mainly spruce and pine stands, taking advantage of natural clearings when possible. Reclaiming the fireguard will require pulling back the topsoil, woody debris, and any displaced trees onto the grubbed fire guard. The trees are to be broken up mechanically or manually slashed so to be made to lie flat to the ground. Leaning or damaged trees that cannot be reached mechanically without causing significant additional damage to the forest, will be manually felled and/or bucked to lie flat to the ground.
Show more description
Show less description
Contract duration
The estimated contract period will be 3 month(s), with a proposed start date of 2024/12/06.
Partner with another business
The functionality to add your company name to the list of interested businesses is temporarily unavailable.
This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria.
For more information please read the Terms of use
.
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.