| Location: | District of Columbia |
|---|---|
| Posted: | May 1, 2026 |
| Due: | May 8, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-26-20799 |
| Publication URL: | To access bid details, please log in. |
IFB-26-20799: Pavement Rehabilitation and Trench Drain Replacement at Mobile Lounge Docks, IAD
UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision required to perform pavement rehabilitation at the H and B Gate Mobile Lounge Docks and replacement of the trench drains at the Main Terminal Mobile Lounge Docks at Washington Dulles International Airport (IAD).
Solicitation Issue Date: April 7, 2026
Due Date for Submissions: May 8, 2026
Amendments Issued: One
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...will have to enter the installation through the O St. Gate. If the ...
DEPT OF DEFENSE
Bid Due: 8/18/2026