| Location: | District of Columbia |
|---|---|
| Posted: | May 1, 2026 |
| Due: | May 8, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-26-20799 |
| Publication URL: | To access bid details, please log in. |
IFB-26-20799: Pavement Rehabilitation and Trench Drain Replacement at Mobile Lounge Docks, IAD
UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision required to perform pavement rehabilitation at the H and B Gate Mobile Lounge Docks and replacement of the trench drains at the Main Terminal Mobile Lounge Docks at Washington Dulles International Airport (IAD).
Solicitation Issue Date: April 7, 2026
Due Date for Submissions: May 8, 2026
Amendments Issued: One
SLBE Requirement: 25%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...will require facility management, facility investment, integrated solid waste, pavement clearance...
DEPT OF DEFENSE
Bid Due: 6/19/2026
...with the addition of new cargo operations. The current pavement section was designed ...
Airports Council International
Bid Due: 7/02/2026
..., integrated solid waste, pavement clearance, and utilities for facilities, ground structures, personal...
DEPT OF DEFENSE
Bid Due: 6/19/2026
...International Airport for the new Centralized Deicing Facility. The pavement reconstruction area... is ...
Airports Council International
Bid Due: 6/24/2026