| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 16, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | Pittsburgh Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2023-100-106-3 (2025-157) |
| Publication URL: | To access bid details, please log in. |
Project Description: Pittsburgh Water is requesting bids for all electrical work as it relates to full structural rehabilitation of the Clarified Water Conduit with Carbon Fiber Reinforced Polymer (CFRP) which includes the installation of isolation gates on the upstream of the Clarified Water Conduit within the clarifier flume, the replacement of the 84-in butterfly bypass valve, and the installation of slide gates within the Filter Influent Structure on the downstream of the Clarified Water Conduit.

With GovernmentContracts, you can:
...Police in Carbon County. Department Information Department/Agency: Department of General Services... Files Carbon ...
State Government of Pennsylvania
Bid Due: 8/07/2026
...detection and condition assessment of existing mains, rehabilitation with Carbon Fiber Reinforced...
Pittsburgh Water & Sewer Authority
Bid Due: 6/18/2026
...and an activated carbon treatment system for the removal of PFAS from groundwater ...
PennBid
Bid Due: 7/09/2026
...Water Authority, Carbon County Type: RFB Status: Open Open Date: May 23rd 2026, ...
PennBid
Bid Due: 6/22/2026