| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 16, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | Pittsburgh Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2023-100-106-3 (2025-157) |
| Publication URL: | To access bid details, please log in. |
Project Description: Pittsburgh Water is requesting bids for all electrical work as it relates to full structural rehabilitation of the Clarified Water Conduit with Carbon Fiber Reinforced Polymer (CFRP) which includes the installation of isolation gates on the upstream of the Clarified Water Conduit within the clarifier flume, the replacement of the 84-in butterfly bypass valve, and the installation of slide gates within the Filter Influent Structure on the downstream of the Clarified Water Conduit.

With GovernmentContracts, you can:
...to, connection to existing electrical transformer; installation of PVC conduit and nylon pull ...
PennBid
Bid Due: 6/24/2026
...) Installation of all necessary conduit, sleeving, and protections for all subsurface utilities, ...
PennBid
Bid Due: 6/12/2026
...of electrical conduit, cable, equipment, and instruments. * Installation of irrigation and contact ...
PennBid
Bid Due: 6/19/2026
...and conduit shall be provided as part of Contract 1. Additional work will ...
PennBid
Bid Due: 7/01/2026