| Location: | Georgia |
|---|---|
| Posted: | Feb 7, 2025 |
| Due: | Mar 6, 2025 |
| Agency: | Chatham County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0018-5 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project is to install a new water system in the Ogeechee Farms subdivision to provide fire protection. The project includes the installation of the generally described items: • 15, 920 ft. of 8” PVC waterline by direct bury • 6,985 ft. of 10” PVC waterline by direct bury • 1,435 ft. of 12” PVC waterline by direct bury • 1,160 ft. of 12” PVC waterline by horizontal directional drill • 805 ft. of 10” PVC waterline by horizontal directional drill • Installation of 34 hydrants and 38 valves of various sizes • 3,860 ft. of 18” storm drainage line • Associated erosion control • Clearing, grading and site restoration • Connection to the existing water system on US Highway 17

With GovernmentContracts, you can:
...-foot wide sidewalks. The project also includes the installation of drainage structures, storm... ...
Forsyth County
Bid Due: 10/15/2026
..., installation of storm drainage piping and appurtenances, erosion and sediment control measures..., ...
State Government of Georgia
Bid Due: 10/01/2026
..., and information systems distribution), lighting, storm drainage, and other site improvements. Furnishings... ...
DEPT OF DEFENSE
Bid Due: 10/02/2026