The project consists of a phased replacement and modernization of the building’s hydronic distribution systems and selected central utility equipment. Work will primarily involve mechanical demolition and installation, with supporting electrical, controls, structural, and architectural modifications as required.
Major work includes the following: Steel Piping Replacement: Phased replacement of existing steel chilled-water, heating hot-water, and associated hydronic piping throughout the building. Work will be performed in multiple phases beginning in 2026 and continuing through 2030 and will require extensive mechanical piping, insulation, controls integration, and associated demolition and restoration. Hosler Chilled Water Connection Removal: Removal of the abandoned pump and piping previously serving the Hosler clean room, including associated demolition and piping modifications completed in multiple phases. Central Plant Equipment Replacement: Replacement of the existing steam-to-hot-water heat exchangers, including associated piping modifications, controls, electrical connections, equipment rigging, startup, and commissioning. Hydronic System Improvements: Installation of chilled water and heating hot water riser extensions to support future building loads.
Bid through BuildingConnected.
| Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
| 001 | HVAC & Controls | 07/09/2026 - 03:00 pm | Recommended but not Mandatory | 07/17/2026 - 03:00 pm |

With GovernmentContracts, you can:
...UP - Pollock Commons Study Project Number 00-10355.00. Project Status Architect/Engineer... O'Donald Architect/ ...
Pennsylvania State University
Bid Due: 9/16/2026
..., and upgrades to staff spaces. Penn State Project Leader Name, Email Richard ...
Pennsylvania State University
Bid Due: 9/23/2026
...for Pennsylvania State University. Penn State Project Leader Name, Email Tyler Payne Architect/ ...
Pennsylvania State University
Bid Due: 9/17/2026
...Project Leader Name, Email Brian Hayes Architect/ Engineer and Design Build Selection Capital... ...
Pennsylvania State University
Bid Due: 9/22/2026