BERTHOLF exhaust piping renewal

Location: California
Posted: Mar 6, 2025
Due: Mar 17, 2025
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • 20 - Ship and Marine Equipment
Solicitation No: 70Z085Q250011644
Publication URL: To access bid details, please log in.
Follow
BERTHOLF exhaust piping renewal
Active
Contract Opportunity
Notice ID
70Z085Q250011644
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Mar 06, 2025 09:29 am PST
  • Original Date Offers Due: Mar 17, 2025 08:00 am PDT
  • Inactive Policy: Manual
  • Original Inactive Date: Mar 17, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    Alameda , CA 94501
    USA
Description

THIS IS TO BE AWARDED BASED OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.





General Requirements









1. SCOPE





1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs for Coast Guard vessels performed by commercial contractors at USCG Facilities.





2. REFERENCES





COAST GUARD DRAWINGS





None.





COAST GUARD PUBLICATIONS



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements



Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes



Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response



OTHER REFERENCES





None





3. REQUIREMENTS





3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.





3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.





3.3 Fire Prevention. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550. Coordinate with COR/KO and submit to upon contract award.





3.3.1 Fire Watch. The Coast Guard will provide fire watch personnel and equipment.





3.4 Period of Performance. TBD, anticipate no later than 21APR.





3.6 Location. Coast Guard Island, Alameda, California.












  1. ITEM 1: Nr. 3 SSDG Exhaust Piping, Renew



1. SCOPE



1.1 Intent. This work item describes the requirements for the Contractor to renew a section of exhaust piping and lagging to the Nr.3 Ships Service Diesel Generator.



2. REFERENCES



Coast Guard Drawings



Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements



Coast Guard Drawing 750-WMSL-259-505-1, Rev C, #3 Ships Service Diesel Generator Exhaust Modifications



Coast Guard Publications



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements



Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes



Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems



Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures



Other References



American Society for Testing & Materials (ASTM) F708, 2022, Standard Practice for Design and Installation of Rigid Pipe Hangers



3. REQUIREMENTS



3.1 General.



3.1.1 CIR.



None.



3.1.2 Tech Rep.



Not applicable.



3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).



3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:




  • Oil in bilges (gas free certification required for hot work)

  • Fuel tank 5-76-1-F

  • Deck plating/grating

  • Piping

  • Piping Supports



3.1.5 Gas Free. The Contractor must certify and maintain work area to a condition ‘Safe for Hotwork’ in accordance with SFLC Std Spec 0740 paragraph 3.3.



3.1.5.1 The affected piping is in the #3 SSDG space 2nd deck FR 76.



3.1.5.2 The affected piping is also approximately 3 feet.



3.1.6 Fluid handling. The Contractor must remove and dispose of removed fluids from the affected piping system and any cleaning fluids, in accordance with all applicable Federal, state, and local regulations.



NOTE



Coast Guard personnel will operate all shipboard machinery and equipment.



3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.



3.3 Bilge. The Contractor must clean bilge areas to allow for gas free certification and hot work in the area.



3.4 Piping Repair. The Contractor must renew the damaged section of exhaust pipe and renew or bring the system back to full operational condition. See Table 1 and Figures 1 through 4 for location and interference details. Further piping arrangement and material details are provided in Coast Guard Drawings 418A-WMSL-259-505. If removal of other system piping is required for access, work directly with the CG Personnel to properly isolate those system(s) prior to disconnecting. Cap or plug any piping to prevent contamination.



3.5 Cleaning. The Contractor must clean the internal surfaces of new and disturbed pipe to cleanliness Grade A in accordance with SFLC Std Spec 5000.



3.6 Reassembly. The Contractor must renew and install new exhaust lagging after operational test.



3.7 Preservation. Prepare and preserve the new piping, valve handle and pipe support in accordance with SFLC Std Spec 6310. Pipe and support colors to match adjacent piping.





NOTE



Coast Guard personnel will operate all shipboard machinery and equipment.



3.8 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.



3.9 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.)



4. NOTES







Figures - Excerpt from CG Drawing 750-WMSL-259-505.






Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 06, 2025 09:29 am PSTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is ...

San Francisco Public Utilities Commission

Bid Due: 6/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.