| Location: | North Carolina |
|---|---|
| Posted: | Apr 9, 2026 |
| Due: | Apr 16, 2026 |
| Agency: | Greenville Utilities |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-14 |
| Publication URL: | To access bid details, please log in. |
| Bid Number | Title | Due Date | Other Files | Tab Sheet |
| 26-14 | RFB for Peak Shaving Generator System Gas Piping | Thu, 04/16/2026 - 02:00pm | - |
1,__ EXTERNAL SENSE LINE CONNECTION TO THE REGULATOR TO BE INSTALLED
PER MANUFACTURERS INSTALLATION PROCEDURES, SENSE LINES SHALL BE
'STAINLESS STEEL AND BENT WITH LONG RADIUS BENDS MINIMIZING FITTINGS,
'2,__ ROUTE ANY VENT LINES TO SAFE LOCATION. ALL VENTS ARE TO ROUTED
SEPERATELY AND PROTECTED AGAINST MOISTURE.
3. PARTIAL PRESSURE SAFETY RELIEF DEVICE WILL EE FISHER 2004. INSTALL
PER MANUFACTURERS INSTALLATION PROCEDURES.
'STANDARD SCHEDULE 40 CARBON STEEL THREAD-O-LETS CAN BE USED FOR
PIPING BRANCHES. TRANSITION TO SENSE LINES UTLIZING SWAGELOCK FITTINGS
[AS APPROPRIATE.
5. _UTIUZE 1 JOMAR OR EQUIVALENT LOCKABLE QUARTER TURN BRASS OR
STAINLESS STEEL BALL VALVES ON ALL BRANCH CONNECTIONS FOR GAUGES AND
'SENSE LINES
6. UTILIZE Ys ASHCROFT 80008 0-100 PS1OR EQUIVALENT STAINLESS-STEEL
Ghuce.
7.__ ANY TUBING OR PIPING MATERIALS SHALL BE AT LEAST SCHEDULE 40 OR
HIGHER,
8, FLEXABLE PIPE BETWEEN NEW GAS LINE AND GENERATOR CONNECTION,
PIETRO FIORENTINI DEVAL 600
2" @5 PSI (PROVIDED BY GUC)
PARTIAL PRESSURE
RELIEF VALVE
LIQUID FILLED ASHCROFT!
RFBSV VENT
NOTE 9
TO
ATMOSPERE
4
NOTE 5
nN
v
"
"
FISHER 289H RELIEF VALVE
(PROVIDED BY GUC)
/NOTE 7
TO GEN. SET
3 4" STEEL
BALL VALVE
BY OTHERS
60 PSIG
UNDERGROUND NATURAL GAS PIPE BY OTHERS
1/2" NOTE1
LOCATE >6 PIPE DIAMETERS
_- V3
NC
" 5 PSIG
NOTE 8
REMSONS
'CRENVILE UTIOTIS
Grenier Cart
250 GENERATOR STE
GaS Pe INSTALLATION

With GovernmentContracts, you can:
Solicitation Number: 274-PRCR-DixParkPJ26 Project Title: Dix Park Portable Toilet 2026 Description: Dix Park
State Government of North Carolina
Bid Due: 10/02/2026