BAKER AVENUE CULVERT REPAIR #26-3021

Location: Massachusetts
Posted: Jul 31, 2025
Due: Aug 21, 2025
Agency: Commonwealth of Massachusetts
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: BD-26-1255-EN411-KR133-119356
Publication URL: To access bid details, please log in.

Bid Solicitation: BD-26-1255-EN411-KR133-119356
Header Information
Bid Number:
BD-26-1255-EN411-KR133-119356
Description:
BAKER AVENUE CULVERT REPAIR #26-3021
Bid Opening Date:
08/21/2025 10:00:00 AM
Purchaser:
Robert (Bob) Hill
Organization:
Town of Concord
Department:
EN411 - Engineering
Location:
KR133 - 133 Keyes Rd
Fiscal Year:
26
Type Code:
NS - Non-Statewide Solicitation
Allow Electronic Quote:

No
Alternate Id:

Required Date:
Available Date
:
07/31/2025 12:00:00 AM
Info Contact:
Justin Richardson, jrichardson@concordma.gov (978-318-3210)
Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
An optional Pre-bid Meeting will be held at 10:00 AM on Thursday, August 7, 2025, in the Engineering Division Conference room at Concord Public Works, 133 Keyes Road, Concord MA.
Bulletin Desc:
Repairing a triple pipe culvert under Baker Avenue. The existing culverts have failed at pipe joints under the southeastern sidewalk. Temporary repaired and area stabilized. The proposed work includes installation of a drainage vault to connect the failed sections of pipe together with associated restoration to the sidewalk and roadway. MassDOT prequalification, class of work as, Bridge, Construction of Bridge, Culvert. Bid Documents available only at www.Projectdog.com Project Code #86982.
Ship-to Address:
Linda Collins
135 Keyes Rd
Concord , MA 01742
US
Email: lcollins@concordma.gov
Phone: (978) 318-3201
Bill-to Address:
Linda Collins
135 Keyes Rd
Concord , MA 01742
US
Email: lcollins@concordma.gov
Phone: (978) 318-3201
Print Format:
Bid Print
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
00

)



Repairing a triple pipe culvert under Baker Avenue. The existing culverts have failed at pipe joints under the southeastern sidewalk. Temporary repaired and area stabilized. The proposed work includes installation of a drainage vault to connect the failed sections of pipe together with associated restoration to the sidewalk and roadway. MassDOT prequalification, class of work as, Bridge, Construction of Bridge, Culvert. Bid Documents available only at www.Projectdog.com Project Code #86982.

U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:




Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Category: Other Construction Projects Status: Open Description: Installation of approximately 900 linear... approximately ...

Town of Wellesley

Bid Due: 6/11/2026

...of the installation of a new 100 HP submersible well pump and transmitter, ...

Wright-Pierce

Bid Due: 6/23/2026

...Method: Open Market Pre Bid Conference: Bulletin Desc: Installation of approximately 900 linear ...

Commonwealth of Massachusetts

Bid Due: 6/11/2026

...consists of furnishing all labor, tools, materials, and equipment necessary for the installation... ...

Commonwealth of Massachusetts

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.