Sealed bids for Terminal Apron Expansion & Reconstruction (Stage 1), to be constructed for Northwest Arkansas Regional Airport Authority

Location: Arkansas
Posted: Jul 7, 2025
Due: Jul 31, 2025
Agency: Arkansas Democrat-Gazette
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.


Sealed bids for Terminal Apron Expansion & Reconstruction (Stage 1), to be constructed for Northwest Arkansas Regional Airport Authority will be received at the Northwest Arkansas National Airport Operations Building, 12005 Tower Drive, Bentonville, AR 72713 until 2:00PM local time on Thursday, July 31, 2025 at which time the bids shall be publicly opened and read aloud. Sealed bids submitted prior to the bid opening must be sent to Andrew Branch, 1 Airport Blvd; Suite 100, Bentonville, AR 72713.
An Optional Pre-Bid Conference will be held at 10:00AM local time on Thursday, July 17, 2025 at the Northwest Arkansas National Airport Operations Building, 12005 Tower Drive, Bentonville, AR 72713. Pre-Bid Conference attendance is optional for bidders on this project. Information regarding the virtual meeting option will be sent out to all plan holders one week prior to the meeting time. Potential bidders not on the plan holder list prior to the pre-bid conference can request access to the pre-bid conference by contacting Chris Maestri ( CMMaestri@GarverUSA.com ).
The Project consists of a concrete apron expansion between Taxiways E and F, reconstruction of concrete pavement on Taxiway H and the existing Terminal Apron and improvements to the existing glycol facility. The scope of work generally includes removal of existing pavement, earthwork, construction of approximately 58,000 square yards of concrete pavement section and associated asphalt shoulders, installation of taxiway edge lights, installation of stormwater pipe and trench drains, installation of the underdrain system, installation of pavement markings, and site restoration as shown in the plans and indicated in the specifications.
Bids will be received for a single prime contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form.
Digital copies of the bid documents are available at http://Planroom.GarverUSA.com for a fee of $22. These documents may be downloaded by selecting this Project from the “Plan Room” link, and by entering Quest Project Number 9769793 on the “Browse Projects” page. For assistance and free membership registration, contact QuestCDN at 952.233.1632 or info@questcdn.com . Documents can be examined at Garver’s office, 4300 South J.B. Hunt Drive, Suite 240, Rogers, AR 72758, or at the Administrative Offices at the Northwest Arkansas National Airport Terminal Building, 1 Airport Blvd; Ste 100, Bentonville, AR 72713. Addendums to the bid package will be issued through the Garver online Plan Holders List; therefore, all Bidders shall be responsible for downloading the bid documents from the Garver online plan room in order to be included in the Plan Holders List. Bidders must enter the addenda numbers in Article 3.01 of the Bid Form to verify receipt.
Bids shall be accompanied by a bid security in accordance with the Instructions to Bidders. The successful Bidder must furnish Performance and Payment Bonds in accordance with the Contract Documents.
All Bidders shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of 9.20% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals DBE).
Bidders must be licensed to perform work within the state of Arkansas.
Federal Requirements for Federally Funded Projects. This Project is being partially funded under the Federal Aviation Administration (FAA) Airport Improvement Program (AIP). Contractors must comply with specific federally required provisions as listed herein and contained in the contract documents. The following federal provisions are incorporated in this solicitation by reference:
• Buy American Preference (49 USC § 50101)
• Civil Rights – Title VI Assurances (78 Stat. 252, 42 USC §§ 2000d to 2000d-4)
• Davis-Bacon Requirements (2 CFR § 200, Appendix II(D), 29 CFR Part 5)
• Debarment and Suspension (2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5)
• Lobbying and Influencing Federal Employees (31 USC § 1352, 2 CFR part 200 Appendix II(J), 49 CFR part 20 Appendix A)
• Procurement of Recovered Materials (2 CFR § 200.322, 40 CFR part 247, Solid Waste Disposal Act)
Affirmative Action Requirement.
1. The Bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.
2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Timetables
Goals for minority participation for each trade: 0.0%
Goals for female participation in each trade: 6.9%
These goals are applicable to all of the Contractor’s construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction.
The Contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.
3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.
4. As used in this notice and in the contract resulting from this solicitation, the “covered area” is Bentonville, Benton County, Arkansas.
Civil Rights Title VI Assurance
The NORTHWEST ARKANSAS REGIONAL AIRPORT AUTHORITY, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any Contract entered into pursuant to this advertisement, disadvantaged business will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex, age, or disability in consideration for an award.
Bids must remain in effect for 90 days after the bid opening date. Within 90 days from the bid date, the Owner may award the contract to the lowest responsive, responsible Bidder or reject any or all Bids for the Project.
The Northwest Arkansas Regional Airport Authority reserves the right to reject any or all Bids, to waive irregularities in the Bids and bidding deemed to be in the best interests of the Northwest Arkansas Regional Airport Authority, and to reject nonconforming, nonresponsive, or conditional bids.
Owner: Northwest Arkansas Regional Airport Authority
By: Andrew Branch
Title: Chief Operating Officer
Date: July 6, 2025
This publication was paid for by the Northwest Arkansas Regional Airport Authority. The amount to be paid for this publication is $1,803.93
END OF ADVERTISEMENT FOR BIDS
July 6, 13, and 20, 2025 520833

Bids/Requests |
Post Date: 07/06 12:00 AM
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...SS 200.322, 40 CFR part 247, Solid Waste Disposal Act) * Prohibition of ...

Arkansas Democrat-Gazette

Bid Due: 6/23/2026

..., 40 CFR part 247, Solid Waste Disposal Act) * Prohibition of Covered ...

Arkansas Democrat-Gazette

Bid Due: 6/30/2026

..., Solid Waste Disposal Act) * Prohibition of Covered Unmanned Aircraft Systems (UAS) ...

Arkansas Democrat-Gazette

Bid Due: 6/09/2026

...CFR part 247, Solid Waste Disposal Act) Civil Rights Title VI Assurance The ...

Arkansas Democrat-Gazette

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.