| Location: | Federal |
|---|---|
| Posted: | May 28, 2026 |
| Due: | Jun 4, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EF26RSS029 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.

With GovernmentContracts, you can:
...Follow General Construction IDIQ MACC Active Contract Opportunity Notice ID N6600126R0038 Related...: 236220 ...
DEPT OF DEFENSE
Bid Due: 7/15/2026
...Follow Cottonwood Substation Construction, Stage 02, Phas Active Contract Opportunity Notice ID... (FAR ...
ENERGY, DEPARTMENT OF
Bid Due: 7/06/2026
...Follow Y--PR-VIEQUES NWR-PRIORITY RDS CONSTRUCTION Active Contract Opportunity Notice ID... SERVICE Office FWS ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...Follow Z1DA--586-22-703 EHRM TASS Construction Active Contract Opportunity Notice ID 36C25626R0074... HOSPITALS AND ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/03/2026