| Location: | California |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jun 30, 2026 |
| Agency: | Sutter County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B2201 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the Live Oak Canal Bridge Replacement at Sanders and Larkin Roads. The work includes removal of existing bridge and roadway elements, excavation, traffic control, storm water pollution prevention measures, construction of a reinforced concrete box culvert and retaining wall, installation of aggregate base and hot mix asphalt, guardrail systems, drainage improvements, pavement delineation, reflective thermoplastic striping and markings, and all associated restoration work necessary to complete the project. The work limits are shown on the Project Plans and associated contract documents.

With GovernmentContracts, you can:
...PDT Close Date: Sep 24th 2026, 2:00 PM PDT Project Description: Construction of ...
Ventura County
Bid Due: 9/24/2026
...asphalt concrete digouts, traffic control, storm water pollution control, pavement striping...
Marin County
Bid Due: 9/22/2026
...consists of retrofitting approximately 102 existing storm water catch basins citywide...) to improve ...
City of Anaheim
Bid Due: 9/24/2026
...protection, and water and wastewater utilities. The City is also host to University ...
City of Santa Cruz
Bid Due: 9/25/2026