| Location: | Texas |
|---|---|
| Posted: | May 28, 2026 |
| Due: | Jul 10, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU 26 019 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additional improvements include new flowmeter controls, irrigation and landscaping enhancements, and security upgrades at the North Berry Road gate. Modifications to the existing clearwells are also included as additive alternates. Volumes 1, 2, & 3 Specifications, Drawings, and Bid Proposal Spreadsheet will be uploaded Friday May 29, 2026.

With GovernmentContracts, you can:
...Splitter Box in preparation for Stop Gate replacement. Replacement of existing Stop Gates ...
City of League City
Bid Due: 9/23/2026
...Box in preparation for Stop Gate replacement. Replacement of existing Stop Gates located... ...
City of League City
Bid Due: 10/01/2026
.... Existing infrastructure provides the capability to support numerous projects of various security ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 9/30/2026