| Location: | Montana |
|---|---|
| Posted: | Jul 30, 2026 |
| Due: | Aug 13, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA462626R0019 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The place of performance for this project will be (for up to) 40 locations throughout the 10th, 12th and 490th Missile Squadrons in the Malmstrom AFB Missile Field located within a 140-mile radius of Great Falls, MT. These 40 sites will vary in type of work from directional bore to erosion repair. The directional boring will consist of placing a continuous length of 4” or 6” conduit a minimum of 5’ below the creek or riverbank. The conduit will start and stop within the Missile Cable Right of Way/Easement. The erosion repair will include placement of riprap, filling of dirt, topsoil, the installation of broad-based dips, water turn outs and wattles. During construction, the Government will make every effort to provide the Contractor with sites in close proximity to each other to facilitate ease of construction and to keep mobilization efforts to a minimum. The Contractor shall provide all plant, labor, equipment, supervision, services, and materials to execute and satisfy the requirements of this Contract. Further project details and information will be provided via the Statement of Work.
| Aug 17, 2026 | [Solicitation (Original)] HICS Boring and Erosion |

With GovernmentContracts, you can: