| Location: | Iowa |
|---|---|
| Posted: | Oct 15, 2025 |
| Due: | Oct 29, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EK26BA001-PLA |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY.
THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. No proposals are being requested or accepted with this notice. The Corps of Engineers, Rock Island District is soliciting comments from the construction community addressing the required use of PLA for large scale construction projects as defined by FAR 22.502 (Total estimated costs of the construction contract to the Federal Government is $35 million or more) within Cedar Rapids, Iowa.
The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
This project has previously been advertised under the Notice ID: "W912EK25R0001-PLA" and "W912EK25R0001," however, changes to the project have led to a change in the acquisition strategy from Unrestricted, Best Value Trade-Off to Unrestricted, Invitation for Bid. Therefore, we are conducting this additional market research.
Project Description: The work includes, but is not limited to, site demolition to include pavement removal, levee removal, utility removal, and plugging of abandoned utilities; temporary traffic controls; clearing, grubbing and stripping; construction of rigid and flexible pavements to include concrete curb and gutter; utility construction to include water main, storm sewer and manholes; earthwork to include structural excavation and impervious embankment fill; sheet pile installation; construction of cast-in-place concrete floodwalls, gatewells and retaining walls; geotechnical instrumentation and vibration monitoring; installation of relief wells, toe drains and cleanouts; aggregate, bedding stone and riprap placement; chain link fencing, access gate, safety rail and bollard installation; and site restoration to include brick pavers, topsoil and seeding.
NAICS Code: 237990
Size Standard: $45,000,000.00
Estimated Range: Between $25,000,000 and $100,000,000
Unrestricted, Invitation for Bid
On February 4, 2022, the President signed an Executive Order on the use of Project Labor Agreements for Federal Construction Projects (the “Order”), which requires the federal government to require a project labor agreement (“PLA”) before awarding any “large-scale construction contract,” defined as a contract for which the estimated cost is $35 million or more. PLAs are being evaluated in accordance with FAR 22.504(d); therefore, this project could be subject to the use of PLAs.
It is requested as part of Market Research under this Sources Sought to provide responses to the following:
This is NOT a Request for Proposals and does not constitute any commitment by the Government. Responses to this Project Labor Agreement (PLA) survey will be used by the Government to make appropriate acquisition decisions. All interested parties must respond to future solicitation announcements separately from responses to this Project Labor Agreement (PLA) survey. The responses to this SOURCES SOUGHT notice must be emailed to Samantha Johanson, samantha.k.johanson@usace.army.mil no later than 12:00 P.M. CST, on Wednesday, October 29th, 2025.