City of Tucker
Invitation to Bid
ITB # 2026-002
STORMWATER SYSTEM REPAIRS
BID MANUAL
City of Tucker
1975 Lakeside Parkway, Suite 350
Tucker, Georgia 30234
City of Tucker Invitation to Bid
ITB #2026-002
STORMWATER SYSTEM REPAIRS
INVITATION: The City of Tucker, Georgia requests that interested parties submit bids for the
Stormwater System Repairs Projects. Bids will be accepted until the date and time listed below and
will be awarded to the lowest responsible and responsive bidder. Addenda and updates to this bid
manual will be posted on the City of Tucker website http://tuckerga.gov/bids, the DOAS/Georgia
Procurement Registry Website or may be requested by emailing procurement@tuckerga.gov.
BID ACTIVITY SCHEDULE
Bid Issued
January 6, 2026
Pre-Bid Conference
N/A
Deadline for Questions
January 20, 2026 at 1:00 pm EST
Responses to Questions Posted (Addenda)
January 23, 2026
Bid Deadline / Opening
February 12, 2026 at 1:00pm EST
Award at Council Meeting (Tentative)
March 9, 2026 (Tentative)
Completion from Notice to Proceed
120 calendar days
SCOPE OF WORK: Refer to Exhibit A.
PRE-BID CONFERENCE: A pre-bid conference will not be scheduled for this project.
QUESTIONS: Submit all questions in writing to procurement@tuckerga.gov. Reference ITB
#2026-002 in the subject line of the email.
ADDENDA: Responses to the questions received will be by addenda and will be posted on the
City website www.tuckerga.gov/bids and the DOAS/Georgia Procurement Registry Website. The
signed acknowledgement issued with each addendum must be submitted with the proposal. It is
the vendors responsibility to verify if any addenda were created.
SUBMITTAL REQUIREMENTS: Vendor shall submit ITB Response electronically to
procurement@tuckerga.gov so it is received no later than February 12, 2026, at 1:00pm EST with
the subject line “Submittal: ITB #2026-002”. The email must contain the vendor’s contact
information. Bid Submittal should be one PDF file and named <Company Name>.ITB 2026-
002.Bid Submittal.pdf. Email will be opened to confirm receipt of the submittal, but the attached
PDF file will remain unopened until the public bid opening.
BID OPENING: All bids received prior to the deadline will be opened publicly at 1:00pm EST
on February 12, 2026 at Tucker City Hall located at 1975 Lakeside Parkway, Suite 350, Tucker
GA.
BID SUBMITTALS: A listing of submittals received prior to the bid deadline will be posted on
the City website http://tuckerga.gov/bids following the opening of the bids.
Page 2 of 8
BID DOCUMENT SUBMITTAL REQUIREMENTS:
1. Unit Price Cost Proposal Form (Provided)
2. W-9 Form (provided)
3. Certificate of Current Liability, Worker’s Compensation and Vehicle Insurance
4. Notarized Bid Bond Form (Provided)
5. Notarized Contractor Affidavit Form (Provided)
6. Proposed List of Subcontractors Form (Provided)
7. Related Experience and References Form (Provided)
8. Notarized Contractor’s Oath Form (Provided)
9. Acknowledgement of Addendum issued with each Addendum.
10. Contact Form (Provided)
All responses must be received electronically by the Bid Deadline. (Addenda will show any
schedule updates). No bids will be received orally, by phone, or by sealed paper documents. Only
electronic bids in accordance with submittal requirement instructions will be accepted. Late bids
will not be considered. Bids received after the bid deadline will be filed unopened. The City of
Tucker reserves the right to reject any and all bids or any part, to waive any formalities to make
an award and to re-advertise in the best interest of the City. The City reserves the right to consider
past performance in determining the responsibleness of bidders.
The city reserves the right to negotiate pricing and may, in its discretion, award a contract to the
lowest responsible and responsive bidder submitting the proposal.
Page 3 of 8
ITB #2026-002 STORMWATER SYSTEM REPAIR PROJECTS
Exhibit A: Scope of Work
PURPOSE, INTENT AND PROJECT DESCRIPTION
The City of Tucker (City), requests that interested parties submit formal electronic bids for stormwater
system repairs at two (2) locations.
The complete scope, specifications, and other relevant information for ITB 2026-002 is available for
download on the City of Tucker website: www.tuckerga.gov/bids or request via email to
procurement@tuckerga.gov.
SCOPE OF WORK
The project is also referred to as Task Order 46.
The work required under this contract includes furnishing materials, qualified labor, equipment, traffic
control, erosion control, and site restoration at each location as described in the accompanying
construction plans.
1. Conduct all activities as described in accompanying plans, details and exhibits.
2. Seed and straw all disturbed areas.
3. Clean work area.
Location Notes:
1. 3746 Canadian Way
a. 250 linear feet of 60” diameter CMP, Live Stream base flow. Scope:
i. Cleaning 250 lf 60” diameter SRCMP
ii. Specialty Cleaning of segment between JB1 and JB2
iii. Internal Point Repair of existing pipe invert prior to pipe lining, 60 linear foot
allowance.
iv. Replace lid at JB2 with ring and cover lid – raise to existing grade
v. Spin Cast in place pipe lining of the 250 linear foot segments, 60” diameter pipe.
vi. Bypass pumping of base flow.
vii. Grout pipe connections at junction box structures.
viii. Back fill sinkholes along segment.
ix. Clean work area.
b. Reference Video and Report
c. Reference schedule of values on Cost Proposal Form
2. 5256 Antelope Lane
a. 100 linear feet of 72” diameter CMP. Scope:
i. Specialty Cleaning, including removal of tension wires used for transport of pipe.
ii. Internal Point repair of existing pipe invert prior to pipe lining, 40 linear foot
allowance.
iii. Spin Cast in place pipe lining of the 100 linear foot segment under Antelope Lane,
72” diameter pipe.
iv. Grout pipe connections at junction box structures.
v. Back fill sinkholes along segment.
vi. Grubbing as necessary to provide access to conduit.
vii. Clean work area.
b. Reference Video and Report
c. Reference schedule of values on Cost Proposal Form
Videos and Reports for each location at the following Sharepoint Link:
Page 4 of 8
TASK ORDER 46 BACKGROUND FILES
General conditions
1. The Contractor shall maintain access to residential properties as necessary by detours or covering
of the work area when not mobilized.
2. The Contractor shall furnish, install, maintain and remove all necessary traffic signs, barricades,
lights, signals, cones and other traffic control devices, and all flagging and other means of traffic
protection and guidance as required by Special Provision 150 of the Georgia Department of
Transportation. Such work shall be considered incidental to the overall contract, and no additional
compensation will be made.
3. The Contractor will be responsible for calling in and identifying utility locations. The City shall
be notified of any potential utility conflicts.
4. The work is intended to be conducted within the city right of way and established drainage
easements. If necessary, the city will obtain all easements and right of entries which may be
necessary to execute the repair.
5. Specifications for repair activities in accordance with Georgia Department of Transportation
Standards
6. City of Tucker ordinances and regulations.
7. OSHA standards and guidelines.
8. Any other applicable codes, laws and regulations including but not limited to Section 45- 10-20
through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-
Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990.
9. All disturbed areas shall be restored to site conditions prior to disturbance, or better.
10. Refer to organization chart below for city assigned staff for this project. The city reserves the
right to substitute staff at any time during the contract period.
11. Reference schedule of values from Cost Proposal Form and exhibits for particular details.
12. The contractor is responsible for inspecting the job site prior to submitting a bid and encouraged to
do so. No change orders will be issued for differing site conditions.
13. 5% retainage will be withheld from the total amount due the contractor until Final Acceptance of
work is issued by the City. City staff will inspect the work as it progresses.
Special Conditions
Pay Item 4. Storm Line Cleaning
1. These line items contemplate the use of high velocity water jetting of silty and/or sandy sediment.