Title: Red Departure Drive & Airside A & C Guideway Rehabilitation
Addenda: 1
Release Date: 1/15/2026
Due Date: 3/2/2026
The Project consists of the rehabilitation of the Red Departure Drive and the Airside A & C Guideways at Tampa International Airport. The entire area, except for the expansion joints, of Red Departure Drive will be repaired, waterproofed, and re-striped. The entirety of the Airside A & C Guideway walkway will be repaired, including concrete repairs, waterproofing (sealants, traffic coating, and expansion joints), and miscellaneous painting.
Red Departure Drive
This Project consists of rehabilitation of the Red Departure Drive including concrete repairs to floors, curbs, ceilings, beams, and walls. The entire existing traffic bearing membrane will be removed and replaced, except in the valet area on the east side of the drive, and the approach and exit ramps will also receive a traffic bearing waterproofing membrane to waterproof the entirety of the ramps. Replacement of the existing expansion joints includes total replacement with a heavy-duty bolt down joint. Also included in this project is pavement markings and installation of a cementitious coating to the face and top of the walls on each side of the ramps.
Airside A Guideway
This Project consists of rehabilitation of the guideway walkway including concrete repairs to floors, columns, and beams. Cracks will be routed and sealed, as well as replacement of existing deteriorated sealants on the walkway. The walkway surface will receive a penetrating concrete sealer. All existing expansion joints will also be removed and replaced with a winged type expansion joint with an elastomeric header and integral gutter. Also included in this project is walkway safety markings and painting of the steel handrails.
Airside C Guideway
This Project consists of rehabilitation of the guideway walkway including concrete repairs to floors, columns, and beams. The entire walkway floor will receive a traffic bearing waterproof membrane. All existing expansion joints will also be removed and replaced with a winged type expansion joint with an elastomeric header and integral gutter. Also included in this project is walkway safety markings and painting of the steel handrails. Plexiglass panels in the baggage area will be replaced or re-secured.

With GovernmentContracts, you can:
...Municipal Office Building, 306 E. Jackson Street, Tampa, Florida 33602. The public is ...
City of Tampa
Bid Due: 10/20/2026
...Chiller Building. The consultant will serve as the Airport's trusted advisor, ensuring that ...
City of Pensacola
Bid Due: 9/24/2026
...Project ID: PD 25-26.117 Title: New Boiler Installation - MC Blanchard Judicial Building ...
Escambia County
Bid Due: 10/07/2026
..., which is located on the fourth floor of the SkyCenter One Office ...
Tampa International Airport
Bid Due: 10/12/2026