| Location: | Oklahoma |
|---|---|
| Posted: | Mar 4, 2025 |
| Due: | Mar 28, 2025 |
| Agency: | City of Broken Arrow |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The City of Broken Arrow, Oklahoma is hereby soliciting a Request for Qualifications (RFQ) from qualified Architect/Engineering (A/E) design firms for an Engineering and Construction Transportation Infrastructure project.
The professional services contract is for a street improvement project on Tucson Street from Olive Avenue to Aspen Avenue including intersection improvements at Olive Avenue. The project includes the design and production of contractor bid documents for the widening and improvements of an existing two-lane roadway located on Tucson Street between Olive Avenue and Aspen Avenue including the intersection of Tucson Street and Olive Avenue. Tucson Street is a 2-lane asphaltic concrete roadway in this location, with an existing bridge structure. The existing structure is a 3-cell 8’ x 8’ x 48’ RCB, skewed, constructed in 2007. An ODOT Bridge Inspection Report (CN 77, NBI 28736), is attached for reference. This project will also include the design of improvements or replacement of the existing bridge. All A/E firms interested in this project must submit a Statement of Qualifications (SOQ) in accordance with the Statement of Qualifications Requirements. All SOQ’s must be submitted no later than 3:00 pm on March 28, 2025 and should be addressed to Charlie Bright, P.E., Director of the Engineering & Construction, City of Broken Arrow, 485 N. Poplar Avenue, Broken Arrow,
Oklahoma, 74012, with the following label: “Tucson Street Improvements from Olive Avenue to Aspen Avenue Including Intersection Improvements at Olive Avenue”.

With GovernmentContracts, you can: