SE-310
INVITATION FOR DESIGN-BID-BUILD CONSTRUCTION SERVICES
AGENCY: DNR - Department of Natural Resources
PROJECT NAME: Lexington-Bundrick Island Dock Replacement
PROJECT NUMBER: P24-6088-PD
CONSTRUCTION COST RANGE: $300,000 to $500,000
PROJECT LOCATION: Bundrick Island, Lexington, SC
DESCRIPTION OF PROJECT/SERVICES: (450 character limit)
Replace existing timber pier, gangway, and floating dock with a timber stationary pier, aluminum gangway, and aluminum
floating courtesy dock.
BID/SUBMITTAL DUE DATE: 01/08/2026
TIME: 02:00 PM
NUMBER OF COPIES: 1
PROJECT DELIVERY METHOD: Design-Bid-Build
AGENCY PROJECT COORDINATOR: Johnavon Williams
EMAIL: WilliamsJL@dnr.sc.gov
TELEPHONE: (803) 830-9215
DOCUMENTS OBTAINED FROM: engineering@dnr.sc.gov
BID SECURITY IS REQUIRED IN AN AMOUNT NOT LESS THAN 5% OF THE BASE BID.
PERFORMANCE AND LABOR & MATERIAL PAYMENT BONDS: The successful Contractor will be required to
provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price.
DOCUMENT DEPOSIT AMOUNT: $0.00 IS DEPOSIT REFUNDABLE:
Yes
No
N/A
Bidders must obtain Bidding Documents/Plans from the above listed sources(s) to be listed as an official plan holder. Bidders that
rely on copies obtained from any other source do so at their own risk. All written communications with official plan holders &
bidders will be via email or website posting.
Agency WILL NOT accept Bids sent via email.
All questions & correspondence concerning this Invitation shall be addressed to the A/E.
A/E NAME: " IN-HOUSE "
A/E CONTACT: Johnavon Williams
EMAIL: engineering@dnr.sc.gov
TELEPHONE: (803) 830-9215
PRE-BID CONFERENCE:
Yes
No MANDATORY ATTENDANCE:
Yes
No
PRE-BID DATE: 12/16/2025
TIME: 10:00 AM
PRE-BID PLACE: 1401 Brady Porth Road, Lexington SC, 29072
BID OPENING PLACE: 260 D Epting Lane, West Columbia SC, 29172
BID DELIVERY ADDRESSES:
HAND-DELIVERY:
MAIL SERVICE:
Attn: Engineering - Karen Jones
Attn: Engineering - Karen Jones
260 D Epting Lane, Room 237-11
West Columbia, SC 29172
260 D Epting Lane, Room 237-11
West Columbia, SC 29172
IS PROJECT WITHIN AGENCY CONSTRUCTION CERTIFICATION?
Yes
No
APPROVED BY:
(OSE PROJECT MANAGER)
DATE: 12/04/2025