| Location: | South Carolina |
|---|---|
| Posted: | Feb 17, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | R40-N024-PD |
| Publication URL: | To access bid details, please log in. |
Base Bid work includes total removal of existing roof systems down to the structural metal deck for approximately 47 squares. Roof replacement includes minor deck repairs, rough carpentry, roof insulation including taper, and a two-ply modified bitumen roof system. All associated sheet metal components and accessories are included.

With GovernmentContracts, you can:
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026