| Location: | California |
|---|---|
| Posted: | Oct 15, 2025 |
| Due: | Nov 12, 2025 |
| Agency: | City of Palo Alto |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: On-Call Services for Administration of Construction Dewatering Regulations
Addenda: 0
Release Date: 10/15/2025
Due Date: 11/12/2025
The City seeks proposals from qualified Consultants to provide on-call services to assist City staff in the oversight and management of excavation projects requiring temporary groundwater pumping (dewatering). The three-year contract will be administered by the Public Works Department, Engineering Services Division, Private Development Group.
The City’s dewatering regulations are complex, and City staff do not have the specialized knowledge or available resources to review geotechnical and/or hydrogeological reports, monitor dewatering operations (e.g., pump rates, groundwater drawdown, etc.), and analyze the resulting data needed to effectively administer these regulations.

With GovernmentContracts, you can:
...ditch located behind residences on W Pueblo Avenue in Napa, CA. A Work ...
Napa County
Bid Due: 7/07/2026
..., excavation, traffic control, storm water pollution prevention measures, construction of a reinforced...
Sutter County
Bid Due: 6/25/2026
..., excavation, traffic control, storm water pollution prevention measures, construction of a reinforced...
Sutter County
Bid Due: 6/25/2026
...for all site preparation, excavation, foundations, underground piping connections, coordination... associated site work, ...
City of Victorville
Bid Due: 6/23/2026