INVITATION TO BID #26-21
2026 SEWER MAIN TO SERVICE LATERAL CONNECTION TESTING AND SEALING PROJECT
Issue Date:
February 10, 2026
Last Date for Questions:
No later than February 18, 2026, at 11:00 am (CST)
Due Date:
No later than February 25, 2026, at 11:00 am (CST)
Bid Opening:
February 25, 2026, at 11:00 am (CST) at Wheaton City Hall located
at 303 W. Wesley Street, Wheaton IL 60187-0727 in the Conley
Meeting Room (lower level).
Prevailing Wages:
All Contracts for the Construction of Public Works are subject to the
Illinois Prevailing Wage Act (820 ILCS 130/1-12).
☒ DOES APPLY ☐DOES NOT APPLY
To be considered responsive, the following documents shall be included with your submittal:
Original Bid Bond (10%)
Certificate of Insurance (as proof of insurance)
Cost Proposal Form (Exhibit D)
Notice of Deviations Form (Exhibit E)
Listing of Subcontractors, Consultants, and Agents Form (Exhibit F)
References Form (Exhibit G)
Vendor Certification Form (Exhibit H)
Vendor Information Reporting Form (Exhibit I)
W-9 form
The successful Vendor will be required to submit the following additional documents:
• Certificate of Insurance with signed endorsements
• Performance and Payment Bonds
• Signed Agreement
Page 1 of 1
Notice to Bidders
EXHIBIT A
INVITATION TO BID #26-21
2026 SEWER MAIN TO SERVICE LATERAL CONNECTION TESTING AND SEALING PROJECT
INTRODUCTION
The City of Wheaton is soliciting competitive bids for the 2026 Sewer Main to Service
Lateral Connection Testing and Sealing Project.
PREVAILING WAGE ACT
All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act
(820 ILCS 130/1-12). ☒ DOES APPLY ☐DOES NOT APPLY
PROJECT SCHEDULE
The project schedule will be determined by the City of Wheaton Engineering Department after
the award.
SCOPE OF WORK
See attached Special Provisions and drawings. Full size drawings have been uploaded as
attachments A & B.
DUE DATE FOR WRITTEN QUESTIONS
All questions, either administrative or technical, shall be submitted via email to Tony Sperkowski
at asperkowski@wheaton.il.us no later than February 18, 2026, at 11:00 am (CST).
ADDENDA
All questions, clarifications or revisions regarding this bid will be issued via a written addendum
and published on the City’s website. Each Vendor shall acknowledge receipt of any addenda on
the Cost Proposal form. Each Vendor, by acknowledging receipt of any addenda, is responsible
for the content of the addenda and any changes to the bid. Failure to acknowledge issued
addenda may cause the bid submittal to be rejected.
BID SUBMITTAL
Submittals shall be received no later than February 25, 2026, at 11:00 am (CST). Late
submissions will not be accepted. An original Bid Bond shall be included with each bid submittal.
Copies will not be accepted.
Submit a hard copy bid to:
City of Wheaton
303 W. Wesley Street - 1st Floor Finance Counter
Wheaton, IL 60187-0727
Attn: Tony Sperkowski, Procurement Officer
All hard copy bids shall be submitted in a sealed package marked with the following information:
• Bid Name & Number
• Bid Closing Date
• Bid Closing Time
• Vendor Name and address
Revised January 2026
Page 1 of 3
Scope of Services
EXHIBIT A
INVITATION TO BID #26-21
2026 SEWER MAIN TO SERVICE LATERAL CONNECTION TESTING AND SEALING PROJECT
It is the sole responsibility of the Vendor to ensure that their bid is delivered by the stated bid
opening date/time. The City is not responsible for misdirected bid packages.
CONFIDENTIAL INFORMATION
Any BID material that is to be considered as proprietary or confidential in nature must be clearly
marked as such by the propose. Failure to do so may result in information becoming a public
record.
CITY’S CONSTRUCTION SERVICES AGREEMENT (EXHIBIT B)
The attached ‘Draft’ Construction Services Agreement is the City’s standard agreement which
specifically outlines the contractual liabilities and shall be used for this project. In submitting a
bid, the Vendor agrees to enter into an agreement with the City of Wheaton utilizing the City’s
standard Construction Services Agreement.
BONDS
☒ Bid Bond: A Bid Bond/Bid Deposit of 10% of the full contract price is required with your bid
submittal.
☒ Payment Bond: The successful Bidder shall provide an original Payment Bond equal to one
hundred percent (100%) of the full amount of the award.
☒ Performance Bond: The successful Bidder shall provide an original Performance Bond equal
to one hundred percent (100%) of the full amount of the award.
☐ Maintenance Bond: The successful Bidder shall be required to furnish a Maintenance Bond
equal to ten percent (10%) of the final contract price for the faithful performance of the Bidder’s
obligation to maintain and keep in good repair, the work herein contracted to be done and
performed for one (1) year from the date of final acceptance by the City.
The cost of said bonds shall be included in the total bid amount
INSURANCE (EXHIBIT C)
The Vendor must carry and maintain adequate insurance consistent with the requirements listed
in Exhibit C-Insurance Requirements. Provide a current Certificate of Insurance with bid as proof
of insurance.
INVOICES
All invoices shall reflect the following applicable information: Agreement number, name of the
Project, name of the Contractor, and the services/deliverables with the price depicted in the
same format as the offer.
Invoices shall be emailed to Accounts Payable at AP@wheaton.il.us.
Revised January 2026
Page 2 of 3
Scope of Services
EXHIBIT A
INVITATION TO BID #26-21
2026 SEWER MAIN TO SERVICE LATERAL CONNECTION TESTING AND SEALING PROJECT
When contractors file certified payroll with IDOL, they will receive a ‘.pdf confirmation’ copy of their
submission. A copy of this ‘.pdf confirmation’ shall be attached to all invoices. Not attaching the
confirmation page may cause delays in payment.
WAIVERS OF LIEN
• The first Application for Payment shall be accompanied by the General Contractor’s
partial waiver of lien, called Waiver of Lien to Date, for the full amount of payment due.
• Each subsequent Application for Payment shall be accompanied by the General
Contractor’s Waiver of Lien to Date, plus the partial waivers of lien of Labor,
Subcontractors and Material Suppliers who were included in the immediately preceding
Application for Payment to the extent of that payment.
• The final Application for Payment shall be accompanied by the Final Waiver of Lien for
the full amount of the Agreement from the General Contractor, Labor, Subcontractors,
and Material Suppliers, including those who have not previously furnished such final
waivers.
PROJECT CLOSE OUT
• Verification of quality and completion of service.
• Completion of Punch List and all areas of non-compliance or incomplete tasks.
• Review of Liquidated Damages.
• Review Retainage.
• Final Payment: Prior to authorization of Final Payment, the following documents shall be
submitted:
o Completed Waivers and Liens.
o Electronic confirmation from the Illinois Department of Labor for each submittal
of Certified Payroll.
o Documented completion of the Punch List.
o Written approval of the City’s Project Manager.
Revised January 2026
Page 3 of 3
Scope of Services
EXHIBIT A
ITB #26-21 SEWER MAIN TO LATERAL CONNECTION TESTING AND SEALING PROJECT
PROJECT SPECIFIC CONDITIONS AND SEWER MAIN TO SERVICE LATERAL CONNECTION
TESTING AND SEALING SPECIFICATIONS
INDEX
Part One: Project-Specific Conditions
101.
Project Description
102.
Scope of Work
103.
Contractor Qualifications
104.
Project Schedule, Working Hours, and Liquidated Damages
105.
Location
106.
Quantities
107.
Warranty
108.
Submittals
109.
Acceptance and Payment
Part Two: Sewer Main to Service Lateral Connection Testing and Sealing Specifications
201
General Requirements
A.
Referenced Standards
B.
Traffic Control and Safety
C.
Property Consideration and Cleanup
D.
Meetings
E.
Staging Area
F.
Water Usage and Fire Hydrants
202
Materials
A.
General
B.
Chemical Grout
C.
Additives
203
Execution
A.
Public Notification
B.
Bypass Pumping
C.
Pipe Preparation
D.
Protruding Tap Removal
E.
Re-cut Service Lateral Connection
F.
Omitting Sewer Main to Service Lateral Connections
G.
Grout Preparation
H.
Testing and Grouting Equipment
I.
Sewer Main to Service Lateral Connection Testing Procedure
J.
Service Lateral Connection Sealing from the Mainline by Packer Injection
Grouting
K.
Material Removal/Disposal
L.
Quality Assurance
M.
Inspection
1
Project Specific Conditions and Sewer Main to Service Lateral Connection Testing and Sealing Specifications
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.