| Location: | California |
|---|---|
| Posted: | Jul 13, 2025 |
| Due: | Aug 13, 2025 |
| Agency: | City of Thousand Oaks |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Improvements at Kelley, Lang Ranch, Meadows, and Oakbrook Reservoir and Pump Station Sites
Addenda: 0
Release Date: 7/11/2025
Due Date: 8/13/2025
The proposed improvements at these reservoir and pump station sites will address the following scope of work:
The City’s Public Works Department manages the City’s water storage and distribution facilities consisting of 11 Calleguas turnouts (connections to the Calleguas Municipal Water District supply), four hydropneumatic pump stations, 16 pump stations, 16 reservoirs, and two booster stations. Many of these sites need certain improvements to address enhanced wildfire resiliency, site drainage, accidental tank overflow containment, pump, and electrical equipment enclosures, fencing, and the addition of emergency generators and disinfection boosting stations.

With GovernmentContracts, you can:
...Water Distribution Repair Parts Department: Operations, Finance, Project 184 Category: Request... notice that ...
El Dorado Irrigation District
Bid Due: 6/16/2026
...and distribution system includes three separate and distinct water supply and distribution systems... ...
Mission Springs Water District
Bid Due: 6/12/2026
...Valley Power Distribution System 2026 (RFP-25-018) The Orange County Water District ("OCWD" or ...
Orange County Water District
Bid Due: 7/07/2026
...Valley Power Distribution System 2026 (RFP-25-018) The Orange County Water District ("OCWD" or ...
Orange County Water District
Bid Due: 7/07/2026