Rood Hall Bus Stop Site Improvements

Location: Michigan
Posted: Jun 25, 2026
Due: Jul 16, 2026
Agency: City of Kalamazoo
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Rood Hall Bus Stop Site Improvements

Closing date

July 16, 2026, 03:30 PM

  • Reference number 91244-053.0
  • Status Open
  • Summary Complete in a professional manner the ROOD HALL BUS STOP SITE IMPROVEMENTS, per specifications and plans. The Scope of the work is to construct the new Rood Hall Bus Stop on the Western Michigan University Campus for METRO Transit.

91244-053.0-bid document (PDF, 4MB)

91244-053.0-Attachment A: Plans (PDF, 2MB)

91244-053.0-Attachment-B: Specifications (PDF, 816KB)

91244-053.0-Attachment C (PDF, 211KB)

91244-053.0-distribution list (PDF, 110KB)

SCOPE OF WORK

Complete in a professional manner the ROOD HALL BUS STOP SITE IMPROVEMENTS, per specifications and plans. The Scope of the work is to construct the new Rood Hall Bus Stop on the Western Michigan University Campus for METRO Transit.

The project work includes the removal of the existing concrete bus pads, which currently house three bus shelters. Note that the bus shelters and the benches will be removed by others in advance of this construction project. The project includes grading the area to place a granular material subbase surface to prepare the area for concrete. The Contractor will place the foundations for the bus shelters and bike shelter. The Contractor will place the concrete pad to receive the bus and bike shelters. The Contractor will place soil erosion and sediment control as required and will restore the topsoil and establish turf in the disturbed areas.

Areas noted on Phase 2 will be included in the work if funding permits.

Phase 2 areas are shown for information only. Phase 2 areas may be added or may be a part of a future project. Phase 2 areas include similar work as noted above. Phase 2 work includes the removal of the turf and mulch surface. The Phase 2 project includes grading the area to place a granular material subbase surface to prepare the area for concrete. Place the Phase 2 area concrete sidewalk.

These Specifications

• Attachment A&B –

Western Michigan University

Rood Hall Bus Stop Site Improvements

KALAMAZOO, MICHIGAN 49008

SECTION 20, T01S, R11W

2101 WILBUR STREET

TIMELINE

The project must be completed by: 25 days after Notice to Proceed. If you cannot meet this deadline, please fill out the “Statement of No Bid” form included in this packet, stating this as the reason.

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

.... Localized grading of the project site to address current inadequate drainage. New ...

DEPT OF DEFENSE

Bid Due: 7/31/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.