Addendums 1 & 2 for Bids 26 005 BOE WHS Locker Room Replacement of Heating Unit, 006 BOE HES Core Boiler Replacement, 007 BOE HES East House Boiler Replacement

Location: Connecticut
Posted: Apr 16, 2026
Due: Apr 24, 2026
Agency: Weston Public Schools
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: Addendums 1 & 2 for Bids 26 005
Publication URL: To access bid details, please log in.

Addendums 1 & 2 for Bids 26 005, 006, 007
pdf

Attachment Preview

Addendum 1 for Bids #26-005, 26-006, and 26-007
1. Is this project prevailing wage? If the project is over $100,000 it would be
prevailing wage
2. Is a project schedule required with the bid? Yes
3. Is a DAS prequalification certificate required with the bid? No
4. What is the retainage? 15%
5. What are the daily liquidated damages? TBD
6. How many copies of the bid would you like us to submit? One hard copy and
One electronic copy on USB
7. Is this project CHRO? No
8. Are permit fees waived? No
9. Are we required to provide preventative maintenance once the job is done? If so,
for how long? No
Addendum 2 Bid #26-006 HES Core Boiler and Pumps
1. During the walkthrough it was pointed out that the work shall commence on
August 14th, 2026. Please confirm or clarify whether this is the case or not? 8/21
completion date.
2. Please confirm that we are required to hire ABS to do all of the associated
control work on the project? Yes
3. Are alternate manufacturers allowed for the boilers, pump, expansion tanks,
feeder etc.? Yes, as long as they are comparable or exceed what is currently in
place.
4. Is there glycol in the system? If so what percentage is it? No glycol.
5. Are the existing S/R hydronic isolation valves on the boilers to remain or to be
replaced? Replaced
6. Are the existing S/R hydronic isolation valves on the pumps to remain or to be
replaced? Replaced
7. Are we allowed to work during school hours if required? Yes
8. Are we to pump out the entire oil tank to turn over to the owner or just what is in
the existing oils lines within the mechanical room? Just what is in the existing oil
lines within the mechanical room.
9. In order to remove the existing 3-way valve are we going to be required to drain
down the entire system & refill/purge? Yes
10. Are the existing concrete housekeeping pads going to need to be extended or
will the existing ones be large enough for the new boilers? If the replacement is
larger than the existing pads, it is the contractors responsibility to extend the
pad.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid Number: 2026-01 Bid Title: Jared Eliot Middle School Window Wall and Heating ...

Town of Clinton

Bid Due: 6/16/2026

...replacement solution for the heating plant at the Brookfield High School. BPS seeks ...

State Government of Connecticut

Bid Due: 6/19/2026

...for the replacement of window walls and heating units in the Jared Eliot ...

State Government of Connecticut

Bid Due: 6/16/2026

..., and geothermal heating and cooling to accommodate the needs of the current ...

State Government of Connecticut

Bid Due: 6/26/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.