| Location: | Illinois |
|---|---|
| Posted: | Aug 17, 2026 |
| Due: | Sep 2, 2026 |
| Agency: | City of Aurora |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Central Garage Underground Fuel Storage Tank Removal
Addenda: 0
Release Date: 8/17/2026
Due Date: 9/2/2026
The City of Aurora is seeking a qualified contractor to remove three inactive underground storage tanks (UST's) at the former Central Maintenance Garage located at 720 N. Broadway. These tanks, which include one (1) 20,000-gallon diesel UST and two (2) 20,000-gallon gasoline UST's, shall be removed in accordance with the requirements of the Illinois Leaking Underground Storage Tank (LUST) Program as well as all pertinent federal and state guidelines and the Special Provisions (contained herein) and Project Specifications (attached).
To date, the City has retained consultants to perform a handful of Environmental Site Assessments including a Phase I ESA and ongoing Phase II services by Fehr Graham. The results of the Phase I ESA are included with this bid request. The proposed scope of ongoing services for the Phase II ESA, which includes a summary of the background of the site and UST's, is also included.

With GovernmentContracts, you can:
Follow 88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS-
DEPT OF DEFENSE
Bid Due: 9/16/2026
DEPARTMENT OF WATER MANAGEMENT Construction 76305 1334862 1334862: Block Level Lead Service Line
City of Chicago
Bid Due: 10/01/2026
Project: C26FI103384111 - Request for Proposals (RFP) for Construction Services for the Red
Chicago Transit Authority
Bid Due: 10/07/2026
Project: Mechanical Engineering Design Services Ref. #: 214619 Department: Purchasing Type: Other Status:
Metra Rail
Bid Due: 9/25/2026