| Location: | Pennsylvania |
|---|---|
| Posted: | Jun 3, 2026 |
| Due: | Jul 2, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Malvern Borough, Chester County |
| Publication URL: | To access bid details, please log in. |
Project Description: This project consists of the stabilization and restoration of approximately 800 linear feet of stream channel and streambank along North Warren Avenue in Malvern Borough. Work includes, but is not limited to, installation of streambank rock deflectors, toe rock protection, riprap stabilization, streambank grading, native woodland seed mix establishment, shrub and tree plantings, live staking, stream bypass pumping, and erosion and sedimentation control measures.

With GovernmentContracts, you can:
...Follow FCC Allenwood Grease Trap Pumping and Cleaning FY27 Active Contract Opportunity Notice ...
JUSTICE, DEPARTMENT OF
Bid Due: 9/30/2026
...Pumping Station at 10 Union Street, Columbia PA, 17512. Those that cannot attend ...
PennBid
Bid Due: 9/30/2026
...; magnetic flow meters; SCADA telemetry system; bypass pumping; and all associated electrical, ...
PennBid
Bid Due: 10/05/2026
...removal, pumping, hauling, and disposal, as well as emergency wastewater hauling services. Bids ...
PennBid
Bid Due: 9/30/2026