| Location: | Kentucky |
|---|---|
| Posted: | Nov 13, 2025 |
| Due: | Nov 19, 2025 |
| Agency: | State Government of Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-785-2600000186-2 |
| Publication URL: | To access bid details, please log in. |
Description: RFB-104-26 23067AMLBAML, Hopkins County
Department: Facilities & Support Services
Buyer: Kristi Sharp
Solicitation Number: RFB-785-2600000186-2
Type: Request for Bids (RFB)
Category: Construction
Closing Date and Time: 11/19/2025 09:30 AM EST
| Line Number | Commodity Description | Details | Requested | |
|
1
|
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded**
The 23067AMLBAML Reclamation Project will reclaim approximately 77 acres of areas adversely affected by past coal mining operations. The reclamation task of Stony Point AML Reclamation Project is divided into five (5) earthwork areas with acidic refuse, mine spoil ridges, and mining impoundments. Work includes backfilling existing mine pits/silt ponds with adjacent mine spoils. All water below 6.0 pH shall be treated in strict accordance with KYAML technical specifications. A pump to dewater the pits is likely needed. A domestic & mining debris disposal bid item is included for removing and properly disposing of all items that qualify. Silt Fence and Silt Traps are included to control all sediment from the site during construction activities. Ditches lined with ECB and Class II and Class III channel lining are proposed to properly handle surface waters within the construction limits as designed. Likewise, 18-inch HDPE culverts are included to properly handle surface waters as designed. ECB Anchors will be installed as needed to secure in place erosion control blanket in proposed ditches and as a secondary silt control measure. Filter Fabric is included to use in aggregate ditches to increase stability and reduce sediment. Permanent Low Water Crossings are proposed for stream crossings in some areas. Revegetation efforts include Seed Bed Prep, Agricultural Limestone, Fertilizer, Seed, Mulch, and Crimping. Agricultural Limestone is also to be used as a barrier between acid and cover material. Limestone sand is included for ditches which are constructed over acidic materials and other areas as passive treatment where designated. Roadway Stone is setup to facilitate construction access and to maintain in kind existing gravel roads. The entire project work area slated for any excavation has been previously disturbed by coal mining operations, utility installation, road construction, residential development, and/or high velocity water flows associated with heavy rain events and flooding. Construction disturbances will be kept to a minimum through the use of a stringently formulated sediment and erosion control program. Hay bales & silt fence will be installed and maintained at all disturbed areas for silt control in accordance with AMLs Best Management Practices. All disturbed areas will be promptly revegetated using agricultural limestone, fertilizer, seed, and mulch, as needed.
|
Specifications
Commodity Code
912
|
Service From
12/15/2025
Service To
04/09/2027
|
View Purchase History
Additional Information
|

With GovernmentContracts, you can:
...Services Buyer: Kristi Sharp Solicitation Number: RFP-785-2600000446-2 Type: Request for Proposals (RFP...) Category: ...
State Government of Kentucky
Bid Due: 6/09/2026
...Buyer: Kristi Sharp Solicitation Number: RFB-785-2600000608-1 Type: Request for Bids (RFB) Category...: Construction ...
State Government of Kentucky
Bid Due: 6/23/2026
...; Support Services Buyer: Kristi Sharp Solicitation Number: RFP-785-2600000442-2 Type: Request...
State Government of Kentucky
Bid Due: 6/30/2026
...Sharp Solicitation Number: RFP-785-2600000441-2 Type: Request for Proposals (RFP) Category: - Closing... Date ...
State Government of Kentucky
Bid Due: 6/09/2026