| Location: | Texas |
|---|---|
| Posted: | Jun 3, 2026 |
| Due: | Jul 16, 2026 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-0220 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the (approximate) following:
• 5,353 LF of 72-inch FRP Sewer Line by Open-cut
• 746 LF of 72-inch FRP Sewer Line in 96-inch (0.844” Min Thickness) Steel Casing by Auger Bore/96” Tunnel Liner Plate by Hand Tunnelling
• 12 EA of 6-ft Diameter Flat Top Fiberglass Tee Base Manholes (Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal)
• 1 EA of 6-ft Diameter Flat Top Fiberglass Tee Base Drop Manholes (Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal)
• 3 EA of Cast-in-place Sanitary Sewer Junction Structures (Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal)
• 371 VF of Epoxy Manhole Liner (Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal)
• 5,597 SF of Epoxy Structure Liner (Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal)
• 5 EA of Odor Control Units
• Bypass Pumping

With GovernmentContracts, you can:
...#26-091 Addendum 1 (Northwest Substation Construction) Issue Date & Time 7/23/2026 12:00:01 PM... ...
City of College Station
Bid Due: 8/07/2026
...General Construction at Lubbock SSLC Follow Solicitation Solicitation ID: HHS0017375v2 Status... Drywalling; 91362-Construction, ...
State Government of Texas
Bid Due: 8/11/2026
...Project: 2026 Construction Material Testing Ref. #: CIZ-DWU-26 331E Type: RFPQ Status: Open ...
City of Dallas
Bid Due: 8/28/2026
...#26-091 Addendum 1 (Northwest Substation Construction) Issue Date & Time 7/23/2026 12:00:01 PM... ...
County of Brazos
Bid Due: 8/07/2026