| Location: | Connecticut |
|---|---|
| Posted: | Jul 11, 2025 |
| Due: | Aug 21, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PWC 26-04 |
| Publication URL: | To access bid details, please log in. |
Redevelopment of Sutton Park including new walkway, playground equipment, EV charging stations, drainage improvements, new bathroom facility, and other improvements as shown on Contract Plans. A separate contract will provide improvements to the skate park. Contract documents, including Plans and Specifications, are available on the Town of Groton Website: www.groton-ct.gov. This Contract is subject to State set-aside and contract compliance requirements. The Town of Groton reserves the right to waive any formalities or to reject any or all bids. A non-mandatory pre-bid meeting will be held at: 185 Fort Hill Road (Sutton Park) on Thursday, August 7, 2025 at 10:00am Local Prevailing Time. Each bidder must deposit, with his bid, security in the form of bid bond or certified check subject to the conditions provided in the Information for Bidders.
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax: kklein@groton-ct.gov

With GovernmentContracts, you can:
...Green Road Drainage The project will consist of replacing the existing 36" storm ...
State Government of Connecticut
Bid Due: 6/17/2026
...Project ID: Title: B026-62 Green Road Drainage Addenda: 0 Release Date: 5/15/2026 Due ...
City of Meriden
Bid Due: 6/17/2026
...irrigation system, placement of topsoil and sod, paved parking lot, storm drainage, landscaping, ...
State Government of Connecticut
Bid Due: 6/30/2026
...with concrete curbing, concrete sidewalk ramps, storm drainage modifications, sanitary sewer...
Town of Beacon Falls
Bid Due: 7/02/2026