| Location: | Missouri |
|---|---|
| Posted: | Jul 11, 2025 |
| Due: | Aug 6, 2025 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | SL District, St. Louis County, Woodson Road replacement and removal of damaged pavement, channelization islands, traffic signal equipment, sidewalks, and curb ramps, and modification of storm drainage systems. | 7/8/25 | 8/6/25 | |
| Addendum 1 | SL District, St. Louis County, Woodson Road replacement and removal of damaged pavement, channelization islands, traffic signal equipment, sidewalks, and curb ramps, and modification of storm drainage systems. Addendum 1 | 7/11/25 | 8/6/25 |

With GovernmentContracts, you can:
..., trail, ADA ramps, RRFB, storm sewer, asphalt pavement, concrete barrier, commercial driveway, ...
Missouri Department of Transportation(MDOT)
Bid Due: 11/03/2026
...ramps, and drainage/storm sewer improvements. A mandatory pre-bid meeting will be held at ...
Drexel Technologies
Bid Due: 11/03/2026
...ramps, and drainage/storm sewer improvements. A mandatory pre-bid meeting will be held at ...
Drexel Technologies
Bid Due: 11/03/2026
...ramps, and drainage/storm sewer improvements. A mandatory pre-bid meeting will be held at ...
Drexel Technologies
Bid Due: 11/03/2026