| Location: | Georgia |
|---|---|
| Posted: | Oct 6, 2026 |
| Due: | Nov 4, 2026 |
| Agency: | County of Glynn |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB27-011 |
| Publication URL: | To access bid details, please log in. |
Project ID: IFB27-011
Title: East Beach Massengale Park Boardwalk
Addenda: 0
Release Date: 10/6/2026
Due Date: 11/4/2026
This is an invitation to submit a bid to the Glynn County Board of Commissioners for the East Beach Massengale Park Boardwalk Construction Project. The successful bidder shall provide and furnish all construction, labor, skill, equipment and materials to perform all operations in connection with the demolition of the existing structure and the construction of the new beach access pier as shown and indicated in the construction plans and drawings attached herein and maintain strict adherence to the environmental permit requirements
The Work consists of furnishing all labor, materials, equipment, supervision, and incidentals required to construct the East Beach Massengale Park Boardwalk and associated beach access improvements in accordance with the Contract Documents, including the construction plans, details, notes, and applicable permits.
The project shall be constructed as a lump sum, all-inclusive contract in strict accordance with the plans and specifications and applicable permits. The following are considered incidental to the Lump Sum price: Mobilization and demobilization, Environmental compliance, Survey and lay out, Temporary access and staging, Contractor supervision and quality control and Coordination with inspectors and County staff
All work shall be performed in strict accordance with: Construction plans and drawings, Technical specifications, Special provisions, and scope of work.
The existing beach access at Massengale Park does not provide adequate access to the beach and is impeded by the existing tidal ponds. This project will provide an elevated boardwalk that will improve pedestrian access to the beach while allowing for continued growth and migration of the existing sand dunes. The proposed improvements are designed to avoid impacts to the existing tidal pools and surrounding environmentally sensitive areas. All construction activities shall be performed in strict compliance with the applicable environmental permits and approved construction plans.

With GovernmentContracts, you can:
...of 9.5mm Superpave asphalt; striping; erosion control; grading and clearing within the drainage ...
State Government of Georgia
Bid Due: 12/02/2026
...Access Control Systems and Security Systems 68072 Correctional Facility Equipment, Cell Blocks..., security, ...
State Government of Georgia
Bid Due: 12/03/2026
.... Agency HEALTH AND HUMAN SERVICES, DEPARTMENT OF Sub-tier CENTERS FOR DISEASE CONTROL ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 11/19/2026
...2026-27 Three Ring Access Road Culvert Improvements Covington, City Of Oct 26, 2026 ...
State Government of Georgia
Bid Due: 12/01/2026